Project 26-04
Overlaying Various Street Throughout the City

Documents:
Bid Book 1 of 2
Bid Book 2 of 2
Addendum No. 1
Bid Call: 2/25/26
Addendum No. 1: 3/13/26
2:00 P.M. PT
March 19, 2026

Attachment Preview

CITY PROJECT NO. 26-04
The special provisions contained herein have been prepared by or under the direction of the
following Registered Persons.
________________________________
Spencer Supinger, PE
TABLE OF CONTENTS
NOTICE TO BIDDERS ................................................................................................................................ NTB-1
COPY OF BID ITEM LIST ........................................................................................................................... NTB-4
SPECIAL PROVISIONS .................................................................................................................................SP-1
DIVISION I GENERAL PROVISIONS ............................................................................................................SP-2
1 GENERAL ...................................................................................................................................................SP-2
2 BIDDING ....................................................................................................................................................SP-3
3 CONTRACT AWARD AND EXECUTION .......................................................................................................SP-8
5 CONTROL OF WORK ................................................................................................................................SP-10
7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC .......................................................................SP-12
8 PROSECUTION AND PROGRESS...............................................................................................................SP-14
9 PAYMENT ................................................................................................................................................SP-14
DIVISION II GENERAL CONSTRUCTION...................................................................................................SP-16
12 TEMPORARY TRAFFIC CONTROL ...........................................................................................................SP-16
13 WATER POLLUTION CONTROL .............................................................................................................SP-16
14 ENVIRONMENTAL STEWARDSHIP .........................................................................................................SP-17
15 EXISTING FACILITIES ..............................................................................................................................SP-18
DIVISION III EARTHWORK AND LANDSCAPING ....................................................................................SP-19
17 GENERAL ...............................................................................................................................................SP-19
DIVISION IV SUBBASES AND BASES.......................................................................................................SP-20
23 GENERAL ...............................................................................................................................................SP-20
DIVISION V SURFACINGS AND PAVEMENTS..........................................................................................SP-21
37 SEAL COATS ...........................................................................................................................................SP-21
39 ASPHALT CONCRETE..............................................................................................................................SP-21
DIVISION VIII MISCELLANEOUS CONSTRUCTION ................................................................................SP-23
77 LOCAL INFRASTRUCTURE ......................................................................................................................SP-23
DIVISION IX TRAFFIC CONTROL DEVICES ............................................................................................SP-24
84 MARKINGS.............................................................................................................................................SP-24
DIVISION XI MATERIALS.............................................................................................................................SP-25
96 GEOSYNTHETICS....................................................................................................................................SP-25
CITY OF ATWATER
PUBLIC WORKS DEPARTMENT
NOTICE TO BIDDERS
Bids open Thursday, March 19, 2026 at 2:00 p.m. Pacific DST
Scope of Work:
The Base Work generally consists of a 1.5-inch pavement overlay located on Shaffer Road between
Atwater Blvd and Juniper Avenue; Carter Way between Winton Way and Springwood Drive; and Mitchell
Street between the Atwater Canal and approximately 250 feet east of the intersection of Mitchell Street and
Willow Steet. Additive Alternative #1 includes Cedar Avenue between First Street and approximately 70’
west of Seventh Street. Additive Alternative #2 includes Drakeley Avenue between First Street and
approximately 320’ west of Seventh Street. Base bid and Alternatives include approximately 50 lineal feet
of conform overlay paving on each intersecting street (unless intersection street has a valley gutter, then
conform will stop at valley gutter). The Base Work includes approximately 300,150 square feet of existing
surfaced roadway or approximately 6,290 linear centerline feet of roadway, including side street conforms
measured to the centerline of all roads. Additive Alternative #1 includes approximately 76,100 square feet
of existing surfaced roadway or approximately 2,170 linear centerline feet of roadway, including side street
conforms measure to the centerline of all roads. Additive Alternative #2 includes approximately 79,000
square feet of existing surfaced roadway or approximately 2,500 linear centerline feet of roadway, including
side street conforms measured to the centerline of all roads. All roads included in the project are to be
paved “current” to Caltrans standard specifications.
The Work is described in more detail in the following paragraphs and shall be performed by the Contractor
pursuant to current Caltrans standard specifications.
All materials and construction methods shall conform to Caltrans Standard Specifications and all applicable
material and performance standards therein referenced for hot mix asphalt and other bid items for the
intended use and application. Material delivery shall conform to the recommended delivery standards and
quality control regarding temperature of materials.
The Contractor shall furnish all labor, materials, equipment, tools, incidentals, permits, services, and
construction required to complete the Work, which includes:
mobilizing all required resources to complete the Work;
providing temporary traffic control;
providing erosion, sedimentation, and pollution control;
removing existing pavement by wedge grind;
removing existing pavement markers;
removing existing traffic striping and pavement markings by grinding;
disposing and/or recycling of all removed and excess materials;
handling and disposing of any and all hazardous materials;
repairing and filling existing pavement cracks, potholes, and boils;
leveling low/depressed areas of existing pavement;
replacing damaged traffic signal detector loops and lead-in cables;
raising existing utility covers to finish grade; (Base Bid: Approx 19 sewer/storm/cable manholes;65
G5 water/monument/gas valve/sewer cleanout; Additive Alternative #1 Approx 11
sewer/storm/cable manholes; 12 G5 water/monument/gas valve; Additive Alternative #2 Approx 9
sewer/storm/cable manholes; 15 G5 water/monument/gas valve) Contractor to verify before bid.
cleaning loose sand, dirt, debris, and other contaminants from existing pavement;
applying asphalt binder tack coat and sealant;
NTB-1
installing geosynthetic pavement fabric;
placing and compacting 1.5” Type A HMA pavement overlay with 1/2" max. aggregate size; and
replacing thermoplastic traffic striping and pavement markings, and pavement markers.
The newly placed asphalt overlay shall tie in smoothly with the existing road surface and shall be applied
to improve or correct any existing drainage issues. Contractor shall maintain the integrity of existing curbs,
gutters, drainage inlets, culverts, or any drainage apparatus. Apply the “STOP” word marking and a stop
bar line at all existing Stop signs, including where none currently exists.
Contractor shall post notice of the project work schedule at all entrances to the Project work area at least
one (1) week prior to commencement of any work. “NO PARKING” signs shall be posted at least 72 hours
prior to beginning work. Contractor shall arrange for towing of cars, if necessary, in coordination with City.
Traffic through the active construction zones shall not be delayed more than ten (10) minutes. One travel
lane shall be maintained in each direction with a minimum width of 10 feet (10’). Temporary traffic markers
shall be used where required and removed completely prior to completion of the Work. Trained flaggers
shall be used when required. The project work area shall be cleaned daily of all construction debris, leaving
the area safe and ready for traffic.
The City will receive sealed bids for the OVERLAYING VARIOUS STREETS THROUGHOUT THE CITY
PROJECT.
Project Number: 26-04
Bid Call Number: 736-26
Bid forms for this work are included in a separate book titled:
CITY OF ATWATER, CALIFORNIA
PUBLIC WORKS DEPARTMENT
BID BOOK
FOR THE CONSTRUCTION OF
OVERLAYING VARIOUS STREETS THROUGHOUT THE CITY PROJECT
No bid will be received unless it is made on a bid form furnished by the CITY OF ATWATER PUBLIC
WORKS DEPARTMENT. Copies or facsimiles of the bidder's completed and executed bid forms submitted
as a bid will be rejected. Each bid must be accompanied by a certified check, cashier's check, or bidder's
bond made payable to the CITY OF ATWATER for an amount equal to at least ten percent (10%) of the
amount of bid, such guaranty to be forfeited should the bidder to whom the contract is awarded fail to enter
into the contract.
The Contractor must have a valid California license of Classification A General Engineering Contractor,
or C-12 Earthwork and Paving, to perform this work.
The successful bidder will be required to obtain a City of Atwater Business License at his/her own expense
before execution of the contract.
Bids must be on a unit price basis. All bids are to be compared on the basis of the CITY OF ATWATER’S
estimated quantities of work to be done.
Complete work within 30 working days.
The estimated cost of the base bid construction is $727,000.
The estimated cost of Additive Alternative #1 is $185,000.
The estimated cost of Additive Alternative #2 is $192,000.
NTB-2
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...: Open Description: See the Bid notice, Barker Blue web link(to acquire the ...

City of San Mateo

Bid Due: 6/11/2026

...: See the Bid Notice and Contract Book (with bid proposal forms) are ...

City of San Mateo

Bid Due: 4/21/2071

...Status: Open Description: See the Bid notice, Barker Blue web link(to acquire the ...

City of San Mateo

Bid Due: 6/25/2026

...: Open Description: See the Bid notice, Barker Blue web link (to acquire ...

City of San Mateo

Bid Due: 7/02/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.