| Location: | North Carolina |
|---|---|
| Posted: | Apr 22, 2025 |
| Due: | May 12, 2025 |
| Agency: | State Government of North Carolina |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 173-25034 |
| Publication URL: | To access bid details, please log in. |
| Solicitation Number: | 173-25034 |
| Project Title: | Rebid for Loyd Auman Elementary School Piping Reinsulation 2025 |
| Description: | This project will be Phase 1 for Summer 2025 to include: remove and dispose existing HVAC hydronic pipe insulation. Reinsulate pipe per specification. Piping to be reinsulated in this phase shall be from the Mechanical Room / Stage wall routed through Cafeteria through the back Hallway. Remove drywall at skylights (framing to remain) and partial area of the stage ceiling per insulation contractor to gain access to HVAC hydronic piping. Replace drywall ceilings, lightwells, and repaint. Acoustical ceiling tile and grid to be completed under a separate contract. Cumberland County Schools will provide existing construction drawings, overall floor plan of the project area, pipe insulation specifications. The contractor will be responsible to verify exact horizontal and vertical pipe locations. |
| Opening Date: | 5/12/2025 10:00 AM |
| Posted Date: | 4/22/2025 |
| Status: | Open |
| Department: | CUMBERLAND COUNTY BOARD OF EDUCATION |
|
Solicitation Number
*
173-25034
|
Department
CUMBERLAND COUNTY BOARD OF EDUCATION
|
Status Reason
Open
|
|
|
Opening Date
2025-05-12T10:00:00.0000000
|
Posted Date
*
2025-04-22T14:35:49.0000000Z
|
Commodity Code
Construction Services
|
|
|
Mandatory Conference/Site Visit
2025-04-29T04:00:00.0000000Z
|
Special Instructions
Mandatory Pre-Bid conference at 10:00 a.m. on at Loyd Auman Elementary School, 6882 Raeford Road, Fayetteville, NC 28304 (910-868-8153). PLEASE sign in at the office upon arrival.
|
||
|
Description
This project will be Phase 1 for Summer 2025 to include: remove and dispose existing HVAC hydronic pipe insulation. Reinsulate pipe per specification. Piping to be reinsulated in this phase shall be from the Mechanical Room / Stage wall routed through Cafeteria through the back Hallway. Remove drywall at skylights (framing to remain) and partial area of the stage ceiling per insulation contractor to gain access to HVAC hydronic piping. Replace drywall ceilings, lightwells, and repaint. Acoustical ceiling tile and grid to be completed under a separate contract. Cumberland County Schools will provide existing construction drawings, overall floor plan of the project area, pipe insulation specifications. The contractor will be responsible to verify exact horizontal and vertical pipe locations.
|
|||
|
Attachments
|
|||

With GovernmentContracts, you can:
...Type: Rehab Street Name: 1009 Rosada Dr Bid walk time: 6/11/2026 9:30 AM ...
City of Charlotte
Bid Due: 6/18/2026
...Wall Panels WC-20A: Doors, Frames, Hardware WC-21: Drywall, Framing, EIFS, Acoustical Ceilings, Wall...
North Carolina State University
Bid Due: 7/09/2026
..., Frames, Hardware WC21: Drywall, Framing, EIFS, Acoustical Ceilings, Wall Panels, & Foam...
North Carolina State University
Bid Due: 6/18/2026
...05A - Structural Steel and Misc. Metals 06A - Finish Carpentry and Casework ...
State Government of North Carolina
Bid Due: 6/12/2026