| Location: | Massachusetts |
|---|---|
| Posted: | Apr 8, 2026 |
| Due: | May 5, 2026 |
| Agency: | Wright-Pierce |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Phase 1: Upgrades to select treatment systems at the WWTF, including portions of the headworks (select grit processing components), septage receiving facilities, secondary clarifiers, return and waste sludge systems, and associated process components. The project also includes general site improvements, demolition of two existing bio-oxidation towers, renovation of the existing Operations Building, construction of a new Maintenance Building, instrumentation, and electrical upgrades.
A Matterport scan is available for interested firms that are on the official plan holders list only. If your firm is on the planholders list and you are interested in viewing the Matterport scan, please contact the Project Engineer listed on this page. Please note that these images were taken years ago and may not depict current conditions. The dimension tool is not accurate and should not be relied upon; refer to the Contract Drawings for dimensions. Existing conditions must be field verified. Matterport scans of the site and other structures/buildings are not available

With GovernmentContracts, you can:
...Sludge Hauling and Disposal Bid No. 26-039 The Town of Amherst is inviting ...
Town of Amherst
Bid Due: 6/17/2026
...Bid Number: IFB-26-WW-052 Bid Title: Transportation and Disposal of Sludge Cake Category: Other... ...
Yarmouth town
Bid Due: 6/15/2026
...Header Information Bid Number: BD-26-1726-DEPAR-S0001-128844 Description: Sludge Hauling - Town... wastewater treatment plant ...
Commonwealth of Massachusetts
Bid Due: 6/30/2026
...Facility (WWTF) from an activated sludge modular FAST treatment system to a recirculating ...
Holliston town
Bid Due: 6/04/2026