| Location: | Vermont |
|---|---|
| Posted: | Sep 10, 2025 |
| Due: | Oct 6, 2025 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Request for Proposal Locations: Keywords: Water Treatment, Sewage System Update Bid Description: Manufacture and delivery of Aerobic Granular Sludge Biological Treatment Process equipment for inclusion as an allowance in a general construction contract. Equipment “Vendor” or “Manufacturer” as “Seller” shall be required to furnish equipment as specified herein to the awardee of the general contract (“Buyer”) at the bid price submitted. The equipment shall provide biological treatment system using Aerobic Granular Sludge as approved by the State of Vermont, Agency of Natural Resources, Department of Environmental Conservation, Water Investment Division. for the Woodstock Main Wastewater Treatment Facility Upgrade will be received and accepted via online electronic bid service through QuestCDN, https://www.questcdn.com until 2:00 pm (prevailing local time) on Monday, October 6, 2025, at such time will be opened publicly online. As an alternative to on-line submission, Bidders may mail or hand-deliver a hard copy of the Bid to be received before the Bid deadline
|
||||||||||||||||||||||

With GovernmentContracts, you can:
...Keywords: Construction (Non Building), Sewage System Update, Wastewater Disposal Bid Description: The... project ...
State Government of Vermont
Bid Due: 6/10/2026
...Burlington , VT 05401 Bid Type: Job Contract Locations: Keywords: Paving Contractor, Sewage ...
State Government of Vermont
Bid Due: 6/10/2026
..., Sewage System Update, Storm Water System Design Bid Description: This project consists...
State Government of Vermont
Bid Due: 7/15/2026