APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
SEE STATEMENT OF WORK (SOW), ATTACHMENT I FOR DETAILS
Overview:
This task order will consist of services associated with the Propane Supply. Services shall include refueling of propane tanks, fixing/replacing of any tanks with issues, installing tanks and all necessary equipment/parts and removing tanks that are no longer necessary. All and any exceptions shall be submitted in writing.
Key Elements:
The work includes but is not limited to: Work shall consist of furnishing all supervision, labor, equipment and materials in performing all operations in connection with the installation, relocation, and refueling of propane tanks in various locations throughout the depot, stated in enclosed specifications. At the conclusion of the contract period, vendor-owned tanks must be removed and taken.
A: Contractor shall install the following tanks at locations stated below:
Bldg. Tank Size Quantity
49 1000 gal 1 (underground tank)
54 1000 gal 1
212B 500 gal 1
3002 500 gal 1
3006 120 gal 2
1013 500 gal 1
72 1000 gal 1
B: Contractor shall fill above cylinders for the duration of the contract term and remove when contract is terminated.
C: Contractor must furnish all necessary piping, fittings, regulators and hardware to connect to existing propane supply piping
D: All installations must comply with federal and local codes. The codes can be found in paragraph 2.1.
E: Contractor shall ensure ample fuel supply for all heating systems. Delivery must be at a minimum of once in a two-week period or sooner if necessary.
10 October 2024 Propane Supply and Service
Page 2 of 22
F. Contractor shall relocate tanks as-needed to meet building or regulatory demands.
G: Contractor shall connect all grounding cables and ensure tanks and piping are properly grounded.
H: Contractor shall respond to any emergency within a response time of 4 hours.
I: Contractor shall visit the site of the work, check all dimensions and otherwise acquaint himself with all the details and conditions affecting the work, quantities and type of
materials and all factors to meet the purpose and intent of these specifications and the
terms of the contract.
J. At the end of contractual period, if a follow-on contract is not utilized, all vendor- owned tanks will be removed by the vendor and taken away.
| Mar 4, 2025 | [Solicitation (Original)] Propane Service / Repair |
| Mar 24, 2025 | [Solicitation (Updated)] Propane Service / Repair |
| Mar 27, 2025 | [Solicitation (Updated)] Propane Service / Repair |
| Apr 18, 2025 | [Award Notice (Original)] Propane Service / Repair |

With GovernmentContracts, you can:
Follow DLA Commercial Solutions Opening (CSO) FY2026 Active Contract Opportunity Notice ID SP4701-24-S-C001
DEPT OF DEFENSE
Bid Due: 10/01/2026
General Information Department for this solicitation: Procurement Date Prepared: 03/25/26 Types: ITQ Advertisement
State Government of Pennsylvania
Bid Due: 2/28/2031
Follow Repair Combo N0010425PR26321 Active Contract Opportunity Notice ID N0010426RX051 Related Notice Department/Ind.