| Location: | Federal |
|---|---|
| Posted: | Sep 10, 2025 |
| Due: | Sep 22, 2025 |
| Agency: | San Antonio Water System |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PS-00188-YR |
| Publication URL: | To access bid details, please log in. |
ADDENDUM NO. 1 - POSTED
SEE IMPORTANT UPDATES
The San Antonio Water System (SAWS) is pursuing Requests for Qualifications (RFQ) for professional engineering services for the Walden Heights Booster Station Improvements and the W Grosenbacher Rd. Pressure Reducing Valve Projects (“Project”). Statements of Qualifications (SOQs) from interested firms (Respondents) are being accepted in connection with this Project, which will require the scope of services to be performed by a qualified professional engineering firm. The selected professional engineering firm shall provide engineering services entailing planning, engineering evaluations, studies, reports, preliminary engineering, design, bid, construction, start-up/commissioning, and overall project management services for the design and construction of the Project.
The anticipated services will include project management and coordination, civil, mechanical, structural, and electrical engineering services, instrumentation and controls, surveying, permitting, geotechnical engineering, subsurface utility engineering, preliminary engineering, design, scheduling, cost estimating, construction management, operations support, and other services as necessary for the Project.
August 14, 2025 ........................................................................................................................ RFQ Released
August 25, 2025, at 10:00 a.m. (CDT) .......................................... .Non-Mandatory Pre-Submittal Conference
August 25, 2025, at 1:00 p.m. (CDT)………………………………………………..…...Non-Mandatory Site Visit
September 3, 2025, by 3:00 p.m. (CDT). .....................................................Receipt of Written Questions Due
September 10, 2025, by 3:00 p.m. (CDT) ..................................................................Q & A Posted to Website
September
18
22
, 2025, by 2:00 p.m. (CDT) ................................................................................ Submittals Due
September 2025 .......................................................................................................... Submissions Evaluated
October 2025 ............................................................................................................... Interviews, if necessary
December 9, 2025 .............................................................................. SAWS Board Consideration and Award
December 2025 ................................................................................................. Non-Selection Notices mailed
January 2026 ................................................................................................................................... Start Work
|
Full RFQ Proposal
Note: You will be prompted to login to access the full proposal document |
|
|
|
Site Visit sign in sheet Aug. 25, 2025 |
|
|
|
Pre Submittal Meeting sign in sheet Aug. 25, 2025 |
|
|
|
Non- Mandatory Pre Submittal Meeting Presentation Aug. 25, 2025 |
|
|
|
Addendum No. 1 Sep. 10, 2025 |
|
Questions? Please contact
Yvonne Rodriguez
at 210-233-3105
|
Receive Email Updates
|
Registration Agreement

With GovernmentContracts, you can:
...of existing conditions, preparation of schematic designs, space plans, construction documents... and preparation ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/17/2026