Sewer

Location: Washington
Posted: Feb 10, 2025
Due: Feb 24, 2025
Agency: Tacoma Housing Authority
Type of Government: State & Local
Category:
  • 38 - Construction, Mining, Excavating, and Highway Mainenance Equipment
Publication URL: To access bid details, please log in.

Submission Deadline: February 24, 2025, 3:00 pm

RFP - Sewer - 2025-02-10 Download
I. Introduction:

The Tacoma Housing Authority is seeking proposals for Sewer.

This work will be for routine maintenance on a recurring basis. Contracts will be for an initial one-year term with optional renewals possible.

This work may be performed throughout our portfolio and may include prevailing wage requirements as required by Federal and State regulations. A complete list of THA properties is attached to this RFP.

II. Schedule:
Date Time
RFP Release Date 02/10/2025 n/a
Request for Information (RFI) Deadline 02/18/2025 3:00 pm
RFP Submission Deadline 02/24/2025 3:00 pm
THA evaluation period 02/25/2025 03/10/2025 n/a
Anticipated Notice of Award 03/10/2025 n/a
Anticipated Contract Start Date 04/01/2025 n/a
Anticipated Contract Length 1-year initial contract Optional renewal
III. Scope of Work:Scope of Services:Catch Basin Cleaning
  1. Inspection:
    1. Conduct a pre-cleaning inspection of each catch basin to assess current conditions and note any structural damage or blockages.
  2. Cleaning:
    1. Remove accumulated debris, sediment, and organic material from catch basins.
    2. Ensure complete removal of waste down to the sump to restore full capacity.
  3. Disposal:
    1. Collect and transport waste to a certified disposal facility following local, state, and federal regulations.
    2. Provide documentation of proper disposal.

Oil-Water Separator Servicing

  1. Inspection:
    1. Inspect oil-water separators for proper operation, including inlet and outlet structures, baffles, and oil collection components.
    2. Check for signs of wear, damage, or clogging.
  2. Cleaning and Maintenance:
    1. Pump out accumulated oil, sludge, and water.
    2. Pressure wash interior surfaces to remove residual contamination.
    3. Replace filters or absorbent materials as necessary.
  3. Disposal:
    1. Dispose of extracted materials in compliance with applicable environmental regulations.
    2. Provide documentation of proper disposal.
  4. Reporting and Documentation
    Provide a detailed service report for each location, including:
    1. Date and time of service.
    2. Pre- and post-cleaning photographs.
    3. Volume of materials removed.
    4. Description of any damage or issues requiring further action.
    5. Submit all disposal manifests and compliance documentation.
Project Requirements:

Contractors must possess relevant certifications, licenses, and permits to perform the work.

All work must comply with Tacoma Housing Authority requirements, City of Tacoma municipal codes, and applicable environmental regulations, including Washington State Department of Ecology standards.

Work areas must be secured to ensure public safety during maintenance activities.

Deliverables:

Inspection and cleaning of all designated catch basins and oil-water separators.

Submission of comprehensive service reports and disposal documentation.

Identification of repair needs or system deficiencies.

Schedule:

Services should be scheduled to minimize disruption to Tacoma Housing Authority operations and resident access.

Performance Standards:

Maintain compliance with all environmental and safety regulations.

Achieve thorough cleaning and functionality restoration of all serviced infrastructure.

Respond promptly to Tacoma Housing Authority requests for additional services or follow-up actions.

Evaluation and Payment:

Payment will be made upon satisfactory completion of services and receipt of all deliverables.

The contractor must submit an invoice with supporting documentation for review and approval.

IV. Proposal Requirements:

For the proposals to be considered responsive, vendors should submit the following with their bid packet:

  • Cover Letter
  • Company Profile and Qualifications
  • Completed Contractor/Vendor Intake Form – Exhibit C
  • OMWBE Certification if applicable
  • MWBE Self Attestation if applicable

*Please include a pricing list submission with your proposal

V. Evaluation Criteria:
Complete Proposal Packet 20 pts.
Cover letter 10 pts.
Company Profile and Qualifications 30 pts.
MWBE Certification if applicable
OMWBE certified businesses, if not certified, a self-attestation form must be completed attached)
10 pts.
Price List 30 pts.
VI. Proprietary Proposal Material:

Any records or materials submitted to Tacoma Housing Authority become public records under Washington State law (see RCW Chapter 42.56, the Public Disclosure Act at https://apps.leg.wa.gov/rcw/default.aspx?cite=42.56 .

VII. Exhibits to RFP:Exhibit A: Contractor/Vendor Intake Form
New Contractor Intake Instructions Download
Exhibit B:  MWBE Self Attestation Form
Self-Attestation: MWBE Business Owners Download
Exhibit C: THA Insurance Requirements
Insurance Requirements for Vendors Download
Exhibit D:  THA Sample Contract
Sample Service Contract for Taxable Properties Download
Sample Service Contract for Non-Taxable Properties Download

Contact Information:

If you have any questions or require additional information, please contact THA’s contracting team at contracts@tacomahousing.org .

All proposals should be submitted to contracts@tacomahousing,org . In the event that electronic submission isn’t possible, THA will accept proposals directly at our Administration Building:

902 S L St. Tacoma, WA 98405

All submissions must be received prior to the due date and time.

Notice of award will be sent to all applicants and posted on our website under the RFP name.

SHARE
Facebook LinkedIn Email
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...as a Request for Quotation (RFQ) for mitigating contamination issues with a persistent ...

AGRICULTURE, DEPARTMENT OF

Bid Due: 6/10/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.