| Location: | Nevada |
|---|---|
| Posted: | Oct 31, 2024 |
| Due: | |
| Agency: | AGRICULTURE, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 1240LT25R0006 |
| Publication URL: | To access bid details, please log in. |
Inclement Weather – Seasonal Site Visit
Kalamazoo Campground Reconstruction
Humboldt-Toiyabe National Forest
General Information
Solicitation No.: 1240LT25R0006
Document Type: Site Visit
Posted Date: 10/29/2024
Site Visit Date: 11/05/2024
Site Visit Meeting Time: 9 AM (PST)
Description of Work
“THIS PRESOLICITATION NOTICE IS ISSUED FOR INFORMATIONAL PURPOSES ONLY TO PROVIDE AN OPPORTUNITY FOR VENDORS TO ASSESS THE PROJECT SITE PRIOR TO INCLEMENT WEATHER OR SEASONAL CLOSURES AND PRIOR TO ISSUANCE OF THE SOLICITATION. THIS IS NOT A REQUEST FOR PROPOSAL/QUOTE OR BID. The Forest Service anticipates issuing a full solicitation at a time when the project site will be unavailable due to seasonal closures/weather. Interested vendors are encouraged to visit the site for a full understanding and, if desired, take photos or videos.”
The Government does not intend to award a contract(s) based solely on this site visit nor does it intend to pay for any costs incurred in response to this announcement. The intent of this notice is to ensure that prospective vendors may see the areas prior to heavy snowfall and issuing the solicitation. This is not a final solicitation or scope of work . This project is in draft and is subject to change when the solicitation comes out
Site Visit Location:
The project is located in the Ely Ranger District of the Humboldt-Toiyabe National Forest, White Pine County, NV, in Section 30, T 20 N, R 66 E. It is located approximately 27 miles northeast of Ely, NV. The project may be accessed from traveling south on US-50 (Great Basin Blvd.) for approximately 28 miles, then turn left on NV-892 north for approximately 38 miles, then turn left onto Kalamazoo Road for approximately 3.5 miles. [GPS Coordinates: 39.5711177,-114.5919697]
*Note: COR Recommends traveling the longer route (south) rather than trying to go over the mountain if coming from Ely, Nevada.
[SEE ATTACHED NOTICE INCLUDING A ROUTE MAP FOR REFERENCE]
Those participating in the site visit must furnish their own transportation. Please inform Kevin Wilmot, Project Engineer, if you plan to attend, by e-mailing him at Kevin.Wilmot@usda.gov by noon of the day before the site visit.
Magnitude of the Proposed Project: In accordance with FAR 36.204, the estimated magnitude of construction for this project is between $250,000 and $500,000.
Point of Contact: Kevin Wilmot
Kevin.Wilmot@usda.gov
FAR 52.237-1 Site Visit.
Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
| Oct 29, 2024 | [Special Notice (Original)] Kalamazoo Campground Reconstruction |

With GovernmentContracts, you can:
Follow Z2DA--Solicitation No. 36C26126R0041 Project 593-26-103, Renovate Education Building Training Hub Active Contract
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/08/2026
xSolicitation: RFB #94-B-02-26-TL Status: Active Title: Districtwide Water Treatment Services Scope of Work/Services:
Washoe County School District
Bid Due: 7/09/2026
Location Details Site Address: 100 North Carson Street City: Carson City County: Carson
State Government of Nevada.
Bid Due: 6/16/2026
Rosewood Lakes Nature Study Concessionaire Department: Finance RFP Number: RFP 2026-09 Start Date:
City of Reno
Bid Due: 6/18/2026