Pohick Bay Regional Park Pirates Cove Waterline Extension Addendum 1

Location: Virginia
Posted: Feb 19, 2026
Due: Feb 26, 2026
Agency: Northern Virginia Regional Park Authority
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
Pohick Bay Regional Park Pirates Cove Waterline Extension Addendum 1

Attachment Preview

ADDENDUM NO. __1_
TO BID PACKAGE
Project: Pirates Cove Waterline Extension
Date: 2/19/26
This Addendum is issued to address Requests for Information (RFIs) received during the
bidding period. The following questions have been submitted by prospective bidders.
Responses will be incorporated into the Contract Documents as applicable. All other
requirements of the Bid Documents remain unchanged.
QUESTIONS & RESPONSES
Q1: What type of pipe is the existing 3-inch water line from the well?
A1: The existing pipe is Cast Iron
Q2: What type of pipe is the existing lateral that runs toward the pool from the existing line?
A2: The existing pipe is Cast Iron
Q3: Does the Engineer have a specification for connecting HDPE pipe to the existing pipe
material from the well?
A3: We’re proposing a new 3”x3” DIP TEE at the location where the 2 existing 3” Cast Iron
Pipes (mentioned in questions 1 & 2 above) come together with the proposed 4” HDPE
waterline. (see connection detail on sheet 7 of the latest plan) The existing 3” CI pipes will
require a good cleaning but should be compatible with the proposed TEE and 3” gate
valves. The proposed 4” HDPE pipe will connect to a 4”x3” DIP reducer with 3” gate valve
prior to connecting to the TEE. The HDPE pipe has the same basic inner and outer pipe
diameter/dimensions as DIP pipe and the connection between the 4” HDPE watermain and
the 4”x3” DIP reducer can be made with a mechanical joint connection. We propose that
all of the connections at the proposed 3”x3” TEE be made with mechanical joint
connections.
Q4: Will a backflow preventer be required between the existing well line and the new water
lines?
A4: No
Q5: The Contractor is to replace the existing water line between the well and the building.
Does this mean the open trench will encompass the entire gray, “L”-shaped Limits of
Disturbance (LOD) shown on Sheet 7?
A5: Yes, that is correct. Trench disturbance should be located within the LOD but shouldn’t
take up the full LOD.
Q6: Will a specification be provided for thrust block design?
A6: Spec attached.
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Solicitation Number: SPM4A5-09-R-0499 Notice Type: Presolicitation Synopsis: Added: Mar 13, 2009 7:55 am

Defense Logistics Agency

Bid Due: 8/13/2029

IFB 11_0010 - AD for WJCC SCHOOLS HVAC REPLACEMENT BERKELEY MS

James City County

Bid Due: 2/02/2043

Bid Number NIGP Class Description Pre-Bid Date/Time Date/Time Due Buyer Actions IFB1944 91036

York County

Bid Due: 3/12/2030

Bid Number NIGP Class Description Pre-Bid Date/Time Date/Time Due Buyer Actions IFB1944 91036

York County

Bid Due: 4/14/2030

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.