General Project Description: This project consists of furnishing all work necessary for the completion of milling and hot mix asphalt overlay, along with necessary incidentals, on various streets in the Town of Normal, Illinois. The proposed improvement consists of the following approximate quantities: 14,945 SY Hot-Mix Asphalt Surface Removal, 2
1
/
4
”; 7,484 SY Hot-Mix Asphalt Surface Removal, 3”; 1,785 SY PCC Surface Removal, Variable Depth, 0 to 1
1
/
2
”; 11,335 SY PCC Surface Removal, Variable Depth, 1” to 2 3/4”; 1,406 SY PCC Surface Removal, 1
1
/
4
” to 2
3
/
4
”; 114 SY PCC Surface Removal, Variable Depth, 1
1
/
2
” to 3”; 12,000 SY Area Reflective Crack Control; 2,112 feet Full Depth Saw Cut for Crack and Seat; 4,256 SY Crack and Seat Existing PCC Pavement; 661 SY PCC Pavement Removal, Special; 404 SY HMA Pavement Removal, Special; 135 tons Aggregate Base Course, Type B; 18,000 pounds Bituminous Materials (Prime Coat); 18,500 pounds Bituminous Materials (Tack Coat); 15,000 feet Longitudinal Joint Sealant; 628 tons Polymerized HMA Binder Course, IL-4.75, N50; 651 tons HMA Binder Course, IL-9.5FG, N50; 1,417 tons Polymerized HMA Binder Course, IL-9.5FG, N90; 1,906 tons HMA Surface Course, Mix C, N50; 1,480 tons Polymerized HMA Surface Course, SMA, 9.5, Mix E, N80; 325 SY Driveway Pavement Removal; 440 SY PCC Driveway Pavement; 1,300 SF Sidewalk Removal; 2,500 SF PCC Sidewalk, 6”; 275 SF Concrete Median; 2,300 feet Combination Curb & Gutter Removal; 2,300 feet Combination Concrete Curb & Gutter, Type B-6.18, Special; 3,300 feet Combination Concrete Curb and Gutter Removal and Replacement, Special; adjustment, removal, removal & replacement, rehabilitation, or relocation of 90 water and sewer structures; 22,500 feet Short-term Pavement Markings – Paint; 5,800 feet Short-term Pavement Markings – Tape; 11,500 feet Paint Pavement Marking – Line 6”; 250 feet Paint Pavement Marking – Line 12”; 250 feet Paint Pavement Marking – Line 24”; 1,200 SF Paint Pavement Marking – Letters & Symbols; and all other necessary items and incidentals required to complete this project according to the plans and specifications.
|