Board Chambers Countertop Installation Project

Location: California
Posted: Sep 13, 2026
Due: Sep 21, 2026
Agency: San Benito County
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.


Project ID:

Title: Board Chambers Countertop Installation Project

Addenda: 0

Release Date: 9/11/2026

Due Date: 9/21/2026

Follow
Board Chambers Countertop Installation Project
Request For Quotation
Capital Improvement Projects
Project ID: PWB-2637.1
Release Date: Friday, September 11, 2026
· Due Date: Monday, September 21, 2026 2:00pm
Posted Friday, September 11, 2026 8:30am
All dates & times in Pacific Time - Los Angeles
Draft Response Events RSVP No Bid7 days, 19 hours, 34 minutes


Post Information

Posted At:Fri, Sep 11, 2026 8:30 AM
Sealed Bid Process:No
Private Bid:No
Overview


Summary

The County of San Benito is requesting quotes from qualified contractors to furnish, fabricate, finish, and install a new fixed wood countertop at the County Board Chambers, including the Supervisors’ main dais and Clerk of the Board return area. The work includes field verification, fabrication, finishing, installation, associated supports and hardware, and all incidental work necessary to provide a complete and finished installation.

Refer to Attachment A – Board Chambers Countertop Installation Scope of Work and Conceptual Detail for the complete project requirements, materials, dimensions, and installation requirements.



Background

The County of San Benito is seeking a qualified contractor to furnish and install a new fixed wood countertop within the County Board Chambers. The new countertop will be installed along the existing pony wall serving the Supervisors’ main dais and Clerk of the Board return area. The project is intended to provide a durable, functional, and professionally finished countertop that matches and complements the existing furniture and wood finishes within the Board Chambers.

The Board Chambers is an existing operational facility with electrical outlets, microphones, monitors, cabling, furniture, and other equipment located within and adjacent to the proposed work area. Contractors shall account for these existing conditions and shall field verify all dimensions, elevations, clearances, and other conditions affecting fabrication and installation prior to ordering materials or beginning fabrication.

The County has provided Attachment A – Board Chambers Countertop Installation Scope of Work and Conceptual Detail to establish the project requirements and design intent. Dimensions shown in Attachment A are conceptual and shall be verified in the field by the selected contractor. The contractor shall coordinate the work with County staff to minimize disruption to Board Chambers operations and protect existing improvements and equipment throughout the work.

The quote shall be submitted as a lump-sum price for the complete scope of work and shall include all labor, materials, fabrication, delivery, equipment, tools, hardware, supports, finishing, installation, field verification, cleanup, applicable taxes and fees, and incidental costs necessary to complete the work described in Attachment A.

Project Summary

Project Name: Board Chambers Countertop Installation Project

Project Location: 481 4th Street, Hollister, CA 95023

Project Scope: The project consists of furnishing, fabricating, finishing, and installing a new fixed wood countertop at the County Board Chambers, including the Supervisors’ main dais and Clerk of the Board return area. The countertop shall be stained and finished to match and complement the existing furniture and wood finishes within the Board Chambers, subject to County approval of the final stain/finish. The work includes field verification of existing conditions and final dimensions, fabrication of the countertop, stain and protective finish, metal support brackets and associated hardware, openings/penetrations for microphones and cables, and complete installation.

Refer to Attachment A – Board Chambers Countertop Installation Scope of Work and Conceptual Detail for the complete project requirements, dimensions, materials, and installation requirements. Attachment A is incorporated into this Request for Quotes and shall be included in the contractor’s proposed price. All dimensions shown in Attachment A are conceptual and subject to final field verification by the selected contractor prior to fabrication.

The quote shall be submitted as a lump-sum price for the complete scope of work and shall include all labor, materials, fabrication, delivery, equipment, tools, hardware, supports, finishing, installation, field verification, cleanup, applicable taxes and fees, and all incidental costs necessary to complete the work described in Attachment A.

Project Timeline: 30 calendar days from Notice to Proceed

Project Cost: TBD

Please Note

  • All work to be performed at Prevailing Wage.
  • As of April 1, 2015, no contractor or subcontractor may bid or work on a public works project unless registered with the Department of Industrial Relations. Proof of DIR registration and compliance is required to be submitted with all bids. https://www.dir.ca.gov/public-works/PublicWorksSB854.html . Local, Minority and Disabled Veterans Businesses are specifically encouraged to respond.
  • At all times during the performance of this contract, the CONTRACTOR shall possess current and valid license(s) and shall comply with all terms and conditions of such license(s).
  • At all times during the performance of this contract, the CONTRACTOR shall possess necessary Insurance Coverage.


Timeline

RFQu Release Date:
September 11, 2026
Non-Mandatory Site Walk (Non-Mandatory):
September 14, 2026, 11:30am
481 4th Street, Hollister, CA 95023
Questions Submission Deadline:
September 15, 2026, 4:00pm
County Responses to Questions:
September 17, 2026, 4:00pm
Quotation Submission Deadline:
September 21, 2026, 2:00pm
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...signage design, fabrication, and installation projects. Scope clarification: The selected... signs vary significantly ...

Alameda County

Bid Due: 10/19/2026

...projects related, but not limited, to the design, engineering, fabrication, purchase, installation...

City of Los Angeles

Bid Due: 10/06/2026

...chemical and electric propulsion systems throughout the design, development, integration, test... architecture and ...

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

Bid Due: 10/02/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.