| Location: | North Carolina |
|---|---|
| Posted: | Sep 3, 2025 |
| Due: | Oct 2, 2025 |
| Agency: | City of Charlotte |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | FY26-ITBCON-15 |
| Publication URL: | To access bid details, please log in. |
Project Description: The Project will be located at the Sugar Creek Wastewater Resource Recovery Facility at the site address 5301 Closeburn Rd, Charlotte, NC 28210. The Work is in proximity of the Influent Pump Station Building located at the north of the facility. Work to be performed under this Contract entails constructing improvements to arrest the settlement of the Influent Pump Station Building Electrical Room and Dumpster Room. Improvements include, but are not limited to, installation and attachment of helical screw foundation piles or micropiles to the existing foundations, pressure grouting of annual space beneath the Electrical Room, concrete crack repair, masonry repointing, and all other Work required in accordance with the Contract Documents.

With GovernmentContracts, you can:
...and landscaping; structural concrete and steel; masonry and exterior wall systems; roofing; doors...; ...
State Government of North Carolina
Bid Due: 12/08/2026
...Masonry, BP-06A Casework, BP-07A Waterproofing & Air Barrier, BP-07B Roofing, BP-07C Fireproofing...
Wake County Public School System
Bid Due: 11/10/2026
... 21A Fire Protection 04A Masonry 22A Plumbing 05A ...
State Government of North Carolina
Bid Due: 11/19/2026
...Residence Hall 1 - Full Building Round 2 Bidding from prequalified firms on ...
University of North Carolina System
Bid Due: 11/12/2026