CITY OF NORTH POLE
2026-2027 SNOW PLOWING REQUEST FOR PROPOSAL
The City of North Pole is seeking proposals for the plowing and/or removal of snow and hardpack from
approximately 19.5 miles (39 lane miles) of city streets plus city facilities. In addition to the attachments
identified above, this proposal package contains a Contractor Proposal Form, Attachment A (City Streets
and Facilities to be Plowed), Attachment B (Special Plowing Instruction), Attachment C (Alternative #1, #
2, #3, not required to bid), and Attachment D (standard contract). Bids are due to the North Pole City Hall
by 2:00 p.m., Friday, September 4th, 2026.
I. SCOPE OF WORK
1. The scope of work entails the plowing and/or removal of snow and/or hardpack from all City streets
and City facilities (listed in attachment A and Attachment B) pursuant to the order and instructions
in Attachment B on an as requested basis. It is the Contractor’s responsibility to familiarize
themselves with the City’s streets and alleys, the parking lots of City facilities, and this Scope of
Work in preparation of their proposal.
2. Response Times and Timely Completion of Work. Upon award:
A. The Contractor must be available to plow/remove snow at any time of the day or night. The
Contractor agrees by submitting its proposal, they shall begin snow removal within 24 hours
or sooner after notification has been given. The City would prefer that snow plowing started
around 2am and complete before 8am, but not required.
B. The Contractor is allowed thirty-six (36) hours from the time plowing commences to complete
plowing of all City streets and facilities.
C. Response and completion times may be extended by the City, in its sole discretion, under
extraordinary circumstances but in no case will this time be extended because of the
Contractor’s obligation or decision to provide services to another client. The Contractor shall
not be excused from timely performance because of other commitments. Compliance with
these time limits is a material term and failure to comply with these time limits may, at the
option of the City, be deemed a material breach.
3. Coordination and Traffic Control Neighborhood Notification Plan.
A. The Contractor is responsible for coordinating work with the North Pole Police Department
and the North Pole Fire Department to ensure that public safety vehicles and apparatus have
access to the streets during the performance of the work.
B. All work must be performed using a City-approved Traffic Control Neighborhood Notification
Plan (TCNNP). The Proposer must submit a TCNNP along with their proposal. The TCNNP
must explain how the Contractor plans to control traffic in the neighborhoods during plowing
operations and the means and methods the Contractor will use to provide residents with
advance notice. The purpose of this requirement is to ensure, to the maximum extent possible,
that no children or adults are present on or around snow piles or the roadway during
snowplowing activity. Advance notice will also help to inform residents and encourage them to
remove vehicles from the roadway.
C. The City may consider the proposed TCNNPs in evaluating and ranking proposals.
1
4. Other Specifications and Requirements Relevant to Scope of Work.
A. No more than one (1) inch of snow, hardpack snow, or ice shall remain on the roadway surface
after each call out for snow plowing.
B. Any requested hardpack removal shall be cleared to the ground surface. The Contractor and
designated City representative may negotiate a multi-phased removal of the hardpack to take
advantage of periods of daylight and temperature that facilitate hardpack removal.
C. The cleared width shall not be allowed to narrow as consecutive plowings occur. If Contractor
must push snow back during the winter to maintain roadway width, this work shall be at the
Contractor’s expense.
D. Snow berms shall be winged back at road intersection radii to a maximum height of thirty (30)
inches as measured from the roadway centerline to ensure clear sight distances.
E. Contractor shall provide a front-end loader to remove berms concurrently with the plowing of
snow. Any berms or residual berm blocking driveways or located in front of fire hydrants
(regardless of setback), sewer lift stations, and cluster mailboxes shall be removed within an
hour after plowing.
F. No snow shall be dumped within ten feet of any pipe bollards.
G. The roadway surface shall be cleared of snow from roadway shoulder to roadway shoulder each
time roadways are plowed.
H. Special Plowing Instructions are attached as Attachment B.
I. If snow is removed (as opposed to plowed) Contractor shall provide their own snow disposal site.
II. MINIMUM EQUIPMENT REQUIREMENTS
1. The minimum equipment required to bid on this proposal consists of: (i) one motor grader with a
minimum gross weight of 34,000 lbs, (ii) one 4-wheel-drive front-end loader with a minimum two (2)
cubic yard bucket size, (iii) chains for grader and loader drive wheels when necessary, (iv) a snow gate,
and (v) necessary equipment to remove hardpack snow and ice from the roadway (e.g., an ice cutting
edge).
2. The City reserves the right to evaluate equipment and reject a proposal if, at the sole discretion of
the City, the equipment is inadequate for full performance.
III. EVALUATION FACTORS
1. Proposals will be ranked, weighted, and scored according to the following equal criteria:
A. Cost of Services. These are weighted as follows: snow plowing cost 80% and hard pack
removal 20%. To the extent the RFP requires prices for other work, this pricing may be
included in a contract but will not be included as an evaluation factor.
2
B. Experience. This will be ranked based on previous snow plowing and hard pack removal
experience, including consideration of the similarity of previous work experience to scope of
work. This factor includes the previous experience of the Contractor and that of the employees
who will be performing the work.
C. Past performance. This will be ranked based on the quality of previous work, and previous
contract performance based on the assessments of previous customers.
D. Overall Capacity. This will be ranked based on the equipment and other resources available
to the Contractor that will ensure a timely response to call outs and prompt, efficient completion
of the work.
IV. OTHER TERMS AND CONDITIONS
1. The standard City contract is attached as Attachment D with the other required terms and
conditions. Contractor agrees to the terms and conditions in Attachment D unless the Contractor
specifically proposes alternative language in the proposal. The City may reject a proposal if the
alternative language unreasonably increases the City’s costs or risk exposure, in which case the
City may negotiate with the next highest proposer.
V. PROPOSAL PACKAGE
To be considered, a proposal package MUST include the following three (3) completed items.
1. Contractor Proposal Form
2. Alaska Business License
3. Traffic Control Neighborhood Notification Plan
Should addenda be issued, the proposal form must acknowledge receipt of such addenda.
VI. PROPOSAL SUBMISSION AND ACCEPTANCE
1. Receipt of Bid. Bids must be received by 2:00 p.m., Friday, September 4th, 2026, at the North Pole
City Hall, 125 Snowman Lane, North Pole, Alaska 99705. Bids will be opened and made public at
that time. It is the sole responsibility of the contractor to see that their proposal is submitted on time.
Any proposal received after the scheduled opening time will not be considered and will be held
unopened. No responsibility will be attached to any officer or City employee for the premature
opening of or failure to open a proposal that is not properly addressed and identified.
2. Right to Reject or Cancel. The City of North Pole reserves the right to reject any or all bids, to
waive any informality in the procedures, or to cancel the solicitation if it is in the best interest of the
City. The City shall have the right to reject any proposal from a contractor determined by the
City, at its discretion, to be not responsible or not qualified to perform the proposal specifications.
A determination that a contractor is not responsible may be made solely based on previous failures
to perform properly or to complete contracts.
3. Addenda. If any addenda are issued pertaining to the proposal documents and subject addenda are
not acknowledged, the proposal will be considered non-responsive. The Proposal Form provides a
space for acknowledgement of receipt of addenda.
3
4. Form of Delivery. All proposals shall be made on the forms provided by the City of North Pole or
copy thereof and shall be signed by the contractor with signature in full. Due to the confidential
nature of the proposal process, telegraphic or electronically received proposals will not be considered.
Each proposal MUST be enclosed in a sealed envelope and clearly marked 2026-2027 Snow
Removal RFP and addressed to:
City Clerk
125 Snowman Lane
North Pole, AK 99705
5. Withdrawal or Modification of Proposal. Any Proposer may withdraw, modify, or correct their
proposal after it has been delivered to the City of North Pole. Such requests for withdrawal,
modifications, or correction must be received by the City in writing, in a sealed envelope with bidder’s
name describing whether it’s a modification or withdrawal request, before the time set for the opening of
proposals. The original proposal, as modified by such written means will be considered; the
proposal submitted by the contractor must include, withdrawal, modification, or correction with the
signature of the proposer and placed in the mail or hand delivered and received by the submission
date and time prior to the date and time set for the proposal closing. The City of North Pole
expressly reserves the right to reject any and all proposals and to not award the proposed agreement,
if it is in the City’s best interest.
VI. NOTICE OF INTENT TO AWARD AND NOTICE OF AWARD.
As provided in NPMC 4.16.040, award shall be made to the responsible offeror whose proposal is
determined in writing to be the most advantageous to the City taking into consideration price and the
evaluation facts set forth in the request for proposals. Award of the contract, for the Proposal or for the
Proposal plus any or all of the proposed alternates, is at the sole discretion of the North Pole City Council.
Upon authorization of the proposal and/or any combination of the alternates, the Proposer will be sent a
Notice of Intent to Award. The Proposer will have ten (10) business days to submit the following four (4)
items:
1. Performance Bond
2. Proof of Insurance
3. City of North Pole Business License
4. Approved Traffic Control/Neighborhood Notification Plan
Failure to submit these items within this timeframe may lead to the city’s acceptance of another lower-
ranked proposer.
Upon acceptance of the Performance Bond, Proof of Insurance, City of North Pole Business License, and
approved Traffic Control Neighborhood Notification Plan the Proposer will receive a Notice of Award and
provided with a contract for signature.
4
CITY OF NORTH POLE 2026-2027 SNOWPLOW
CONTRACTOR PROPOSAL FORM
1. PRICE SCHEDULE. (Note: Description of requested services are only for the purposes of the RFP
and are not guarantees that the work will be requested)
(1) Snow plowing of all required City
streets and facilities (single plowing)
(2) Hardpack plowing of required City
streets and facilities (single plowing)
Proposal Base Alternate #1
attc A&B Bid attc. C Bid
XXXX
Alternate #2 Alternate #3
attc. C Bid attc. C Bid
XXXX XXXX
(3) Snow hauling rate per hour
(4) Snow hauling rate per load (list
cubic yard per load)
XXXX XXXX XXXX
XXXX XXXX XXXX
2. PRIOR EXPERIENCE. Please describe the Proposer’s prior experience with snow and hardpack
plowing and removal (list dates, description of work and identification of client) and identify and list all
employees who will be performing the Scope of Work. For each employee provide their resume which
specifically and fully identifies that employee’s relevant experience. All descriptions of prior experience
by contractor or by employee shall specifically identify, if any, experience similar to the scope of work
required here (e.g., plowing/removal of snow/hardpack on city streets and/or governmental facilities in
Interior Alaska).
3. PAST PERFORMANCE. Please provide at least three references who can attest to the quality of your
previous snow plowing and removal work and whom you authorize to provide to the person or person’s
ranking your proposal with their candid evaluation and assessment of your previous contractual
performance. If you performed this work for the City in the past 10 years, the city must be specifically listed
as one of your references.
5
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.