| Location: | Arizona |
|---|---|
| Posted: | Aug 16, 2026 |
| Due: | Sep 24, 2026 |
| Agency: | City of Prescott |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Airport Taxiway "F" Realignment Phase 1
Addenda: 0
Release Date: 8/14/2026
Due Date: 9/24/2026
The City of Prescott Regional Airport, Ernest A. Love Field Taxiway "F" Realignment project will reconstruct a portion of Taxiway "F" and Connector "F3" to Airplane Design Group (ADG) 2 geometric standards including grading and drainage improvements, utility adjustments, lighting and signage improvements, and pavement markings. All in strict adherence to Federal Aviation Administration (FAA) design standards. Major items of work associated with the project include, familiarity and knowledge of working at a part 139 Certificated Airport, removal of asphalt concrete pavement, unclassified excavation materials and airfield lighting.
Taxiway "F" is mis-aligned and has caused runway incursions with aircraft and ground vehicles. The project is the first phase of a two phase project to realign Taxiway "F" for improved operational safety.

With GovernmentContracts, you can:
...Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and ...
TRANSPORTATION, DEPARTMENT OF
Bid Due: 11/17/2026
...guardrail, and placement of a final asphalt rubber asphaltic concrete friction course for ...
Yavapai County
Bid Due: 12/31/2099
...2026, 11:00 AM MST Project Description: The project includes removal of existing 72,554 ...
City of Yuma
Bid Due: 11/05/2026
.... yards of existing asphalt pavement and construction of the building foundation, and ...
City of Safford
Bid Due: 11/12/2026