| Location: | Arizona |
|---|---|
| Posted: | Aug 16, 2026 |
| Due: | Sep 24, 2026 |
| Agency: | City of Prescott |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Airport Taxiway "F" Realignment Phase 1
Addenda: 0
Release Date: 8/14/2026
Due Date: 9/24/2026
The City of Prescott Regional Airport, Ernest A. Love Field Taxiway "F" Realignment project will reconstruct a portion of Taxiway "F" and Connector "F3" to Airplane Design Group (ADG) 2 geometric standards including grading and drainage improvements, utility adjustments, lighting and signage improvements, and pavement markings. All in strict adherence to Federal Aviation Administration (FAA) design standards. Major items of work associated with the project include, familiarity and knowledge of working at a part 139 Certificated Airport, removal of asphalt concrete pavement, unclassified excavation materials and airfield lighting.
Taxiway "F" is mis-aligned and has caused runway incursions with aircraft and ground vehicles. The project is the first phase of a two phase project to realign Taxiway "F" for improved operational safety.

With GovernmentContracts, you can:
...of existing asphaltic concrete pavement, reconstruction and widening of portions of the project... ...
Yavapai County
Bid Due: 12/31/2099
...hydrants. Construction of new pavement consisting of a structural section with 3 inches ...
City of Yuma
Bid Due: 11/05/2026
...: Total Small Business Set-Aside (FAR 19.5) Product Service Code: Y1LB - CONSTRUCTION ...
TRANSPORTATION, DEPARTMENT OF
Bid Due: 11/17/2026
...: Total Small Business Set-Aside (FAR 19.5) Product Service Code: Y1LB - CONSTRUCTION ...
TRANSPORTATION, DEPARTMENT OF
Bid Due: 11/17/2026