| Location: | California |
|---|---|
| Posted: | Jun 25, 2026 |
| Due: | Jul 16, 2026 |
| Agency: | Marin County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The Civic Center Green Stormwater Infrastructure Project is a multi-phase project to build green stormwater infrastructure to treat many of the campus parking lots. The current project being advertised is Phase1 which includes construction of two bioretention systems adjacent to the Civic Center “panhandle” parking lot located south of the Marin County Corporation Yard (4 Peter Behr Dr. San Rafael, CA 94903).
There is a mandatory pre-bid conference scheduled for this project on July 1, 2026 at 10:00 a.m. at the Civic Center Campus, 3501 Civic Center Dr. Bidders shall meet at the “panhandle” parking lot south of the Civic Center Corporation Yard, which is located at 4 Peter Behr Dr. San Rafael, CA 94903.Exact location here: https://maps.app.goo.gl/4fZ4JgYBCzTizEaPA
See 41GSI2301 RFP - 41GSI2301 Civic Center Green Stormwater Infrastructure Project- Phase 1 for full details.

With GovernmentContracts, you can:
...Project ID: Title: Green Island Road Class I Project Addenda: 0 Release Date: ...
City of American Canyon
Bid Due: 10/08/2026
...to transform a 1.7-mile stretch of the Imperial Highway median into a multi-benefit ...
City of Los Angeles
Bid Due: 10/15/2026
...Basic Information Title C5613381-D Food and Green Waste Recycling and Recovery Services Agency... ...
State Government of California
Bid Due: 10/16/2026
...90815R1 - 90815R1 Scattergood GS. Units 1&2 Green Hydrogen-Ready Modernization Status Stage...
City of Los Angeles
Bid Due: 9/30/2026