| Location: | California |
|---|---|
| Posted: | Jun 25, 2026 |
| Due: | Jul 16, 2026 |
| Agency: | Marin County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The Civic Center Green Stormwater Infrastructure Project is a multi-phase project to build green stormwater infrastructure to treat many of the campus parking lots. The current project being advertised is Phase1 which includes construction of two bioretention systems adjacent to the Civic Center “panhandle” parking lot located south of the Marin County Corporation Yard (4 Peter Behr Dr. San Rafael, CA 94903).
There is a mandatory pre-bid conference scheduled for this project on July 1, 2026 at 10:00 a.m. at the Civic Center Campus, 3501 Civic Center Dr. Bidders shall meet at the “panhandle” parking lot south of the Civic Center Corporation Yard, which is located at 4 Peter Behr Dr. San Rafael, CA 94903.Exact location here: https://maps.app.goo.gl/4fZ4JgYBCzTizEaPA
See 41GSI2301 RFP - 41GSI2301 Civic Center Green Stormwater Infrastructure Project- Phase 1 for full details.

With GovernmentContracts, you can:
...Department of Public Works, Facilities, and Parks (PWFP). 10980 - Stormwater And Flood ...
Monterey County
Bid Due: 7/20/2026
...On-Call Professional Engineering Services for Stormwater Toxic Total Maximum Daily Load Compliance... facilitate ...
City of Los Angeles
Bid Due: 8/11/2026
...of monuments, and the necessary stormwater protection and traffic control. Timeline Release Project ...
City of Monterey
Bid Due: 7/21/2026
...Camino Real Stormwater and Drainage Improvements Project (Phase 1) Town of Atherton Standard... ...
Town of Atherton
Bid Due: 7/20/2026