| Location: | California |
|---|---|
| Posted: | May 10, 2026 |
| Due: | May 26, 2026 |
| Agency: | City of West Sacramento |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 26-048-ITB |
| Publication URL: | To access bid details, please log in. |
Project ID: 26-048-ITB
Title: City Hall - Galleria Floor Concrete Refinishing - Rebid
Addenda: 0
Release Date: 5/8/2026
Due Date: 5/26/2026
The City of West Sacramento is accepting sealed responses for City Hall - Galleria Floor Concrete Refinishing - Rebid to be received no later than Tuesday, May 26, 2026 at 2:00 pm .
The bid specifications, including instructions on how to bid, standards for a responsive bid, and project specifications, are attached hereto in Attachments and incorporated herein by reference as if set forth in full
The City of West Sacramento is a vibrant riverfront community in Northern California, located along the Sacramento River and home to the Port of Sacramento via the deep-water ship canal. Incorporated in 1987, the City encompasses approximately 22 square miles and serves a population of over 55,000 residents. West Sacramento operates under a Council/Manager form of government, with four City Council Members elected by district and a Mayor elected at large.
Located at 1110 West Capitol Avenue, the West Sacramento City Hall Galleria serves as the central hub of the City Hall complex and a focal point for civic engagement. Completed in the early 2000s, the Galleria was designed as a modern, open, and light-filled public space that accommodates community gatherings, public meetings, and civic events. Its prominent location and flexible design make it one of the most visible and frequently used spaces within City Hall.
Recent geotechnical testing has determined that the concrete slab within the Galleria area exhibits elevated moisture levels. This condition has led to significant deterioration of the existing decorative epoxy flooring system and visible clouding and discoloration in the polished concrete surfaces.
To address these issues, the City retained a professional flooring consultant to evaluate existing conditions and develop a comprehensive technical specification. The recommended improvements include:
Installation of a proven moisture mitigation system to control vapor transmission through the slab
Preparation of existing floor surfaces in accordance with industry standards
Application of a durable, high-performance flooring system suitable for high-traffic public environments
The objective of this project is to restore the aesthetic quality and functional performance of the Galleria flooring while ensuring long-term durability. This scope will include the floor in the lobby areas and hallways of the First, Second and Third floors. The selected flooring system shall provide a minimum service life of 15 years and be resistant to future moisture-related damage.
Given the Galleria’s prominence and frequent public use, maintaining a high-quality, resilient finish is essential to preserving the City’s professional image and supporting ongoing civic activities.

With GovernmentContracts, you can:
...Project: Live Oak Canal Bridge Replacement at Sanders and Larkin Roads Ref. #: ...
Sutter County
Bid Due: 6/25/2026
...Project: Live Oak Canal Bridge Replacement at Sanders and Larkin Roads Ref. #: ...
Sutter County
Bid Due: 6/25/2026
...Contracting Office Address KO CONTRACTING DIVISION 100 CANAL STREET MOBILE , AL 36602-3630 ...
DEPT OF DEFENSE
Bid Due: 6/02/2026
...for the purpose of operating and maintaining the Friant-Kern Canal, (FKC), a component ...
Friant Water Authority
Bid Due: 6/26/2026