| Location: | California |
|---|---|
| Posted: | Nov 16, 2025 |
| Due: | Nov 25, 2025 |
| Agency: | Ventura County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | WW26-19(I) |
| Publication URL: | To access bid details, please log in. |
Project Description: Removal of an existing 7-inch diameter HDPE wastewater force main pipeline inside of a casing pipe and installation of a replacement 6-inch diameter HDPE pipeline and final connections including Water Pollution Control, Unclassified Minor Excavation, HDPE Pipeline Fusion and Pressure Testing, Cement Sand Slurry Backfill, Surface Backfill and Compaction, and appurtenant work.

With GovernmentContracts, you can:
...the remaining existing pavement with the underlying base material and/or soil to produce ...
La County
Bid Due: 9/29/2026
...pavement and the upper 18 inches of soil (which includes 12-14 inches of ...
State Government of California
Bid Due: 10/05/2026