| Location: | California |
|---|---|
| Posted: | Nov 16, 2025 |
| Due: | Nov 25, 2025 |
| Agency: | Ventura County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | WW26-19(I) |
| Publication URL: | To access bid details, please log in. |
Project Description: Removal of an existing 7-inch diameter HDPE wastewater force main pipeline inside of a casing pipe and installation of a replacement 6-inch diameter HDPE pipeline and final connections including Water Pollution Control, Unclassified Minor Excavation, HDPE Pipeline Fusion and Pressure Testing, Cement Sand Slurry Backfill, Surface Backfill and Compaction, and appurtenant work.

With GovernmentContracts, you can:
..., preparing the sewer for UVCIPP liner installation, re-establishing lateral sewers and house ...
City of Los Angeles
Bid Due: 9/02/2026
...projects related, but not limited, to the design, engineering, fabrication, purchase, installation... Construction ...
City of Los Angeles
Bid Due: 10/06/2026
...replacement; curb ramp installation; asphalt concrete patch repair; concrete intersection gutter... Professional, Scientific, ...
City of Los Angeles
Bid Due: 9/02/2026
...site is anticipated to consist of removing the discharge pipes that currently go ...
DEPT OF DEFENSE
Bid Due: 9/04/2026