| Location: | California |
|---|---|
| Posted: | Nov 16, 2025 |
| Due: | Nov 25, 2025 |
| Agency: | Ventura County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | WW26-19(I) |
| Publication URL: | To access bid details, please log in. |
Project Description: Removal of an existing 7-inch diameter HDPE wastewater force main pipeline inside of a casing pipe and installation of a replacement 6-inch diameter HDPE pipeline and final connections including Water Pollution Control, Unclassified Minor Excavation, HDPE Pipeline Fusion and Pressure Testing, Cement Sand Slurry Backfill, Surface Backfill and Compaction, and appurtenant work.

With GovernmentContracts, you can:
...Basic Information Title Reinforced concrete pipe trenchless installation method. Agency Department...
State Government of California
Bid Due: 11/10/2026
...Water Line and Replacement on S Center and Crane A The work consists, ...
City of Turlock
Bid Due: 11/04/2026
...Water Line and Replacement on S Center and Crane A The work consists, ...
City of Turlock
Bid Due: 11/04/2026
...and ductile iron pipes and their associated pipe supports; replacement or installation of ...
East Bay Municipal Utility District
Bid Due: 11/18/2026