| Location: | California |
|---|---|
| Posted: | Nov 16, 2025 |
| Due: | Nov 25, 2025 |
| Agency: | Ventura County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | WW26-19(I) |
| Publication URL: | To access bid details, please log in. |
Project Description: Removal of an existing 7-inch diameter HDPE wastewater force main pipeline inside of a casing pipe and installation of a replacement 6-inch diameter HDPE pipeline and final connections including Water Pollution Control, Unclassified Minor Excavation, HDPE Pipeline Fusion and Pressure Testing, Cement Sand Slurry Backfill, Surface Backfill and Compaction, and appurtenant work.

With GovernmentContracts, you can:
...CLIN 0002 Option 1, Repair AC Paving, Area 1 Consisting of Prep, Slurry ...
DEPT OF DEFENSE
Bid Due: 9/24/2026
...CLIN 0002 Option 1, Repair AC Paving, Area 1 Consisting of Prep, Slurry ...
DEPT OF DEFENSE
Bid Due: 9/24/2026
...CLIN 0002 Option 1, Repair AC Paving, Area 1 Consisting of Prep, Slurry ...
DEPT OF DEFENSE
Bid Due: 9/24/2026
...sealing, slurry seal, re-painting parking stalls, and other stencils such as handicap, charging ...
Eastern Municipal Water District
Bid Due: 10/06/2026