Ainger Creek Park Renovation

Location: Florida
Posted: Sep 11, 2026
Due: Sep 23, 2026
Agency: Charlotte County
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: 26-604
Publication URL: To access bid details, please log in.
File No:

26-604
Description:

Ainger Creek Park Renovation
Contact:

stacey.trowbridge@charlottecountyfl.gov
File number:

20260604
Due Date:
9/23/2026 2:00:00 PM
Notice:
266041
Package:
266042
Registered Vendors Notified:
266043
Presubmittal Sign-in:
266040
Tabulation:
Recommendation:
Addendum:
266046a 266046b
Commodity Codes:

90900, 90925, 91000, 91051, 91200, 91300, 91345, 91347, 91356, 91361, 91366, 91368, 91381, 91389, 91392, 91400, 91430, 91455, 92500, 92519, 92548, 92900, 92930, 95900, 95926, 95935, 95939, 95950, 95951, 95990, 96200, 96296, 96800, 96834, 96873, 98800, 98814

Attachment Preview

COUNTY OF CHARLOTTE
PURCHASING DIVISION
Charlotte County Administration Center
18500 Murdock Circle
Port Charlotte, Florida 33948-1094
(941) 743-1378
TO: PROSPECTIVE BIDDERS
DATE: SEPTEMBER 11, 2026
RE: ADDENDUM #2 - BID NO. 20260604 - AINGER CREEK PARK RENOVATION
BID OPENING DATE: SEPTEMBER 23, 2026, AT 2:00 p.m. (EST)
Bidders are hereby notified that this Addendum shall be made a part of the documents. The intent is to add to, modify, or clarify
the documents. Should any of these items have an effect on price, such changes shall be included in the price bid. These items
have the same force and effect as if contained in the original.
ITEM 1: QUESTION/ANSWER
Q1. Will irrigation plans be available for use in bidding? If not, please see the following irrigation questions:
a) Will the Bahia sod be irrigated?
b) What is the water source (well, potable meter, reclaimed, etc.)?
c) If well, what is the GPM/PSI?
d) What is the size of the water source?
e) Where is the water source located?
A1. No permanent irrigation is proposed. The contractor is responsible for watering landscape until it is established. The
establishment period will be 90 days after project completion. Please refer to revised Landscape Plans.
a) No, but sod needs to be watered by the contractor until it is established in accordance with revised Landscape Plans.
b) Water source is potable meter.
c) N/A
d) For the size of water source, see Civil Utility Plan, Sheet 14.
e) For the location of water source, see Civil Utility Plan, Sheet 14.
Q2. The civil site plan sheet 6 shows 'future kiosk (by others)', but bid schedule contains a line item for a kiosk (item A-2).
Please confirm if this kiosk is part of the current project scope. If so, please provide a specification.
A2. Correction on Bid Form, page 48 - Summary of Pay Items: Please strike through lines for Bid Item A-2 KIOSK and A-2A Kiosk.
Sheet 6 of the Civil Plans is correct.
Q3. Is there a Geo Report for the pile penetrations on the marine side?
A3. A rock probe survey was conducted to ascertain the presence of subsurface rock. No rock was found at locations probed.
See Sheet 3 of the Marine Plans for further details.
Q4. What is the minimum embedment for the Truline Panels? All I see is a note that says 8ft long min.
A4. Truline piles associated with the retaining walls shall be a minimum of 8ft long. If refusal is encountered, contractor shall
notify County and Engineer for approval prior to cutting pile. No more than three (3) consecutive piles shall be less than 8ft
in length. Truline piles associated with the CIP concrete access walkways shall be a minimum of 4ft long as shown on the
revised Marine Plans.
Q5. What are the CIP/Concrete Vinyl Sheet Piles and the Vinyl sheet piles/grout in the bid schedule in reference to?

A5. Bid Item No. M-5H CIP Concrete/Vinyl Sheet Piles refers to the cast-in-place concrete access walkways with integrated
vinyl sheet piles. Bid Item No. M-5I Vinyl Sheet Piles/Grout refers to the vinyl sheet piles installed parallel to the pre-cast
boat ramp slabs and the required grout.
Q6. Drawings call for an Aluminum scab plate. Aluminum cannot be in contact with treated lumber it will corrode
rapidly. Please have this changed to timber.
A6. Aluminum scab plate shall be insulated from pressure treated lumber by 0.60 mil high density polyethylene sheeting.
Refer to Sheet 9 of the Marine Plans for notes associated with Aluminum Scab Plate.
Q7. IPE lumber is being used in the handrail and being mixed with composite railing. IPE is incredibly costly. Please
consider changing to standard treated timbers.
A7. Stanchions are to be IPE.
Q8. There are precast panels for the boat ramp and for the seawall. On sheet # 8 it shows a 16ft panel. My understanding
is that the seawall is 8ft tall panels where do the 16ft tall seawall panels go?
A8. The seawall requires 16ft precast panels (Marine Plans Sheet 8). The terminal ends of the concrete access walkways
associated with the boat ramp require 8ft precast bulkhead panels (Marine Plans Sheet 7).
Q9. Sheet #7, Are the precast panels for the ramp required to have the traction pattern or just the CIP concrete?
A9. The traction pattern is required on precast ramp panels and the CIP concrete as shown on sheet 6 of the Marine Plans.
Q10. Sheet #7 (D-D) Are we to lay down a layer of grout prior to installing pre-cast panel or are we just filling the holes till
they run out?
A10. Precast ramp panels are to be installed prior to grouting. Refer to Sheet 6 of the Marine Plans for details on the grouting
process.
Q11. In the Special Provisions, SP-21, notes "The General Contractor may sublet portions of the work but shall perform with
his own organization not less than 51% of the total Contract work scheduled." This clause will significantly reduce the
number of GC's that can bid on the project. Can the required percentage be reduced to allow more general contractors
to be able to submit a bid on the project? Or will this requirement be enforced as written?
A11. Due to the complex nature of the project pertaining to marine construction, the County has decided to keep the 51% requirement.
Q12. Is the reinforcement rebar uncoated?
A12. All reinforcing steel shall be hot dipped galvanized as noted on the Marine Plans.
ITEM 2: DELETIONS/ADDITIONS:
DELETE: Please delete the previously provided Landscape Plans (3 pages).
ADDITION: Please add the revised Landscape Plans attached (3 pages).
The warranty period has been updated on Sheet 2.
DELETE: Please delete the previously provided Marine Plans (11 pages).
ADDITION: Please add the revised Marine Plans attached (11 pages).
Truline pile length and subgrade preparation for the boat ramp have been updated.
This addendum is binding and is to be considered as if contained within the original bid documents of Bid No. 20260604. Bidders
are required to acknowledge receipt of this addendum on their bid forms.
Kimberly A. Corbett, C.P.M., CPPB
Senior Division Manager-Purchasing
KAC/st

Scale: 1" =30' 30 15 0 30 AINGER CREEK PLACIDA ROAD EXISTING TREE LEGEND EXISTING TREES TO BE REMOVED QUANTITY CALIPER TYPE TOTAL 1 12" OAK 12" EXISTING OAK TREE 1 20" OAK 20" 1 4" GUMBO LIMBO 4" 1 6" GUMBO LIMBO 6" EXISTING GUMBO LIMBO TREE 1 8" GUMBO LIMBO 8" ALL TREES THAT ARE TO BE PRESERVED OR REMOVED MUST BE IN 1 10" GUMBO LIMBO 10" ACCORDANCE WITH CHAPTER 3-9, ARTICLE IV, TREE EXISTING PINE TREE REQUIREMENTS. TREE PERMITS MUST BE OBTAINED PRIOR TO 2 11" GUMBO LIMBO 22" ANY LAND CLEARING / FILL ACTIVITY OR THE ISSUANCE OF ANY 1 13" GUMBO LIMBO 13" BUILDING PERMITS. AT TIME OF APPLICATION TO THE COUNTY FOR A TREE PERMIT, THE APPLICANT MUST PROVIDE A TREE SURVEY / 1 16" PINE 16" EXISTING MISCELLANEOUS TREE INVENTORY OF TREES WITH A 4" CALIPER AND GREATER. 1 18" PINE 18" 1 8" BUTTONWOOD 8" (REFER TO PLAN FOR TYPE) 2 5" SILVER BUTTONWOOD 10" 2 6" SILVER BUTTONWOOD 12" 2 5" SEA GRAPE 10" EXISTING CABBAGE PALM 1 8" SEA GRAPE 8" 1 12" SEA GRAPE 12" 4 12" SEA GRAPE 48" 24 TOTAL TREES TO BE REMOVED EXISTING TREE TO BE REMOVED TOTAL CALIPER 237" The seal appearing on this document was authorized by: John T. Swen, R.L.A., L.A. No. 0001032, State of Florida, on the date adjacent to the seal. 94933 68500062 NEWS T LF C ,ettolrahC E T CL I H moc.liamg@alrnewsnhoj troP C R ,664494 A .T xoB E P NHOJ .O.P A C ,.A.P S 5637-626 D ,NEWS N A )149( L .T NHOJ
nalP eerT gnitsixE noitavoneR daoR adirolF kraP adicalP ,doowelgnE keerC 1102 regniA
105 tinU 25933 5611-526 ,5 CLL .gdlB LF ROF ,ettolrahC ,llewtA ,liarT )149( imaimaT :enohP troP 1614
Revisions:
Rev. Warranty 09/09/2026
-
-
-
-
-
-
-
Date: 12/17/2025
Scale: 1"=30'
Drawn By: ---
Checked By: JTS
Project #: 21105
The seal appearing on this document was authorized by: John T. Swen, R.L.A., L.A. No. 0001032, State of Florida, on the date adjacent to the seal. SHEET L1
QUANTITY CALIPER TYPE
1 12" OAK
1 20" OAK
1 4" GUMBO LIMBO
1 6" GUMBO LIMBO
1 8" GUMBO LIMBO
1 10" GUMBO LIMBO
2 11" GUMBO LIMBO
1 13" GUMBO LIMBO
1 16" PINE
1 18" PINE
1 8" BUTTONWOOD
2 5" SILVER BUTTONWOO
2 6" SILVER BUTTONWOO
2 5" SEA GRAPE
1 8" SEA GRAPE
1 12" SEA GRAPE
4 12" SEA GRAPE
24
TOTAL CALIPER

AINGER CREEK
PLACIDA ROAD
-
-
-
-
-
-
12/17/2025
1"=30'
---
JTS
21105
L1
ROF
nalP
eerT
gnitsixE
CLL
,llewtA
Revisions:
Date:
Scale:
Drawn By:
Checked By:
Project #:
SHEET
noitavoneR
kraP
keerC
regniA
105
tinU
,5
.gdlB
,liarT
imaimaT
1614
25933
LF
,ettolrahC
troP
daoR
adicalP
1102
5611-526
)149(
:enohP
adirolF
,doowelgnE
The seal appearing on this document was authorized by:
John T. Swen, R.L.A., L.A. No. 0001032, State of Florida,
on the date adjacent to the seal.
NEWS
.T
NHOJ
T
C
E
T
I
H
C
R
A
E
P
A
C
S
D
N
A
L
94933
LF
,ettolrahC
troP
,664494
xoB
.O.P
,.A.P
,NEWS
.T
NHOJ
68500062
CL
moc.liamg@alrnewsnhoj
5637-626
)149(
Scale: 1" =30'
30 15 0 30
EXISTING TREE LEGEND
EXISTING TREES TO BE REMOVED
QUANTITY CALIPER TYPE TOTAL
1 12" OAK 12"
EXISTING OAK TREE
1 20" OAK 20"
1 4" GUMBO LIMBO 4"
1 6" GUMBO LIMBO 6"
EXISTING GUMBO LIMBO TREE
1 8" GUMBO LIMBO 8"
ALL TREES THAT ARE TO BE PRESERVED OR REMOVED MUST BE IN
1 10" GUMBO LIMBO 10"
ACCORDANCE WITH CHAPTER 3-9, ARTICLE IV, TREE
EXISTING PINE TREE REQUIREMENTS. TREE PERMITS MUST BE OBTAINED PRIOR TO 2 11" GUMBO LIMBO 22"
ANY LAND CLEARING / FILL ACTIVITY OR THE ISSUANCE OF ANY 1 13" GUMBO LIMBO 13"
BUILDING PERMITS. AT TIME OF APPLICATION TO THE COUNTY FOR
A TREE PERMIT, THE APPLICANT MUST PROVIDE A TREE SURVEY / 1 16" PINE 16"
EXISTING MISCELLANEOUS TREE INVENTORY OF TREES WITH A 4" CALIPER AND GREATER. 1 18" PINE 18"
1 8" BUTTONWOOD 8"
(REFER TO PLAN FOR TYPE) Rev. Warranty 09/09/2026
2 5" SILVER BUTTONWOOD 10"
2 6" SILVER BUTTONWOOD 12" -
2 5" SEA GRAPE 10"
EXISTING CABBAGE PALM
1 8" SEA GRAPE 8"
1 12" SEA GRAPE 12"
4 12" SEA GRAPE 48"
24 TOTAL TREES TO BE REMOVED
EXISTING TREE TO BE REMOVED
TOTAL CALIPER 237"

Central leader. (See crown observations detail). PLANT LIST Top of root ball shall be flush with SYMBOL BOTANICAL(COMMON NAME) DESCRIPTION QUANTITY COMMENTS finished grade. Mulch to be kept 6" away from base of tree. TREES Prior to mulching, lightly tamp soil around the root ball in 6" lifts to Trunk caliper shall B.s. Bursera simaruba(Gumbo Limbo) 10-12'H x 5-6'Spr., 2"Cal. 5 N / FF meet ANSI Z60 current brace tree. Do not over compact. When the planting hole has been edition for root ball size. backfilled, pour water around the C.d. Coccoloba diversifolia(Pigeon Plum) 10-12'H x 5-6'Spr., 2"Cal. 16 N / FF root ball to settle the soil. Root ball modified as C.e.1 Conocarpus erectur sericeus(Silver Buttonwood) 8-10'H x 4-5'Spr., 2"Cal., Single-Trunk 8 N / FF required. Dig and turn the soil to reduce compaction to the area and Round-topped PALMS soil berm 4" high x 8" wide depth shown. above root ball surface 3" layer of mulch, min. 3' dia. C.n. Cocos nucifera 'Green Malayan'(Coconut Palm) 5-6' G.W. 4 shall be constructed around No more than 1" of mulch on FF the root ball. Berm shall top of root ball. begin at root ball periphery. S.p. Sabal palmetto(Cabbage Palm) 8-14'C.T., Staggered Heights, Remove Boots 34 N / FF GENERAL NOTES Finished grade. SHRUBS Existing soil. All plant materials shall be Florida Grade No. 1 or better, as specified in GRADES AND Slope sides of loosened C.e. Conocarpus erectus(Green Buttonwood) 48-54"H x 24-30"Spr., 15 gal., 48"OC, Full 82 STANDARDS FOR NURSERY PLANTS, Parts I and II, by the Division of Plant Industry, soil. N / FF Florida Department of Agriculture and Consumer Services, and shall conform to current Bottom of root ball rests on C.es. 18-24"H x 12-18"Spr., 3 gal., 30"OC, Full 42 N / FF American Association of Nurseryman STANDARDS FOR NURSERY STOCK, unless existing or recompacted Conocarpus erectur sericeus(Silver Buttonwood) otherwise specified on the plans and plant list. soil. 3x widest dimension of root ball. C.g. Clusia guttifera(Small Leaf Clusia) 18-24"H x 12-18"Spr., 3 gal., 30"OC, Full 243 FF C.i. Chrysobalanus icaco 'Red Tip'(Cocoplpum) 14-18"H & Spr., 3 gal., 30"OC, Full 18 All plant materials shall be guaranteed for a period of 90 days (90 days) after final N / FF TREE/PALM PLANTING DETAIL acceptance. All replacement materials shall be guaranteed for an additional 90 days. Contractor shall be responsible for watering the proposed landscaping through the warranty M.c. Muhlenbergia capillaris(Muhly Grass) 24-30"H & Spr., 3 gal., 36"OC, Full 59 N / FF SCALE: NOT TO SCALE and replacement warranty period and shall establish an acceptable schedule that will ensure the survival of the plant materials. If non-potable water is used it will be from a clean, fresh S.a. Schefflera arboricola 'variegata'(Var. Dwarf Schefflera) 18-24"H & Spr., 3 gal., 30"OC, Full 15 FF water source. Brackish or salt water shall not be acceptable. Contractor may hand water or S.r. Strelitzia reginae(Bird of Paradise) 36"H x 24"Spr., 15 gal., 36"OC, Full 9 FF install a temporary irrigation system that adequately waters the landscaping. Regardless of GROUNDCOVER the water method chosen, the Contractor shall be responsible for the warranty of the plant 3" layer of mulch. materials. No more than 1" of mulch on top of root ball. Rootball. C.m. Carissa macrocarpa 'Emerald Blanket'(Dwarf Natal Plum) 12-16"Spr., 3 gal., 24"OC 66 N / FF All planting beds shall be mulched with Mixed Hardwood Mulch, to a depth of three (3) H.d. Helianthus debilis(Dune Sunflower) 8-12"Spr., 1 gal., 18"OC 224 inches. All trees in sod areas shall have a 36" min. radius mulched tree ring. Sod shall be 4" high x 8" wide round - topped soil N / FF berm above root ball surface shall be Paspalum notatum 'Bahia' sod. constructed around the root ball. Finished grade. Berm shall begin at root ball periphery. I.M. Ixora 'Maui'(Orange Ixora) 12-14"H & Spr., 3 gal., 24"OC 76 FF Xeriscape principles shall be utilized as outlined by the Southwest Florida Water Managment Prior to mulching, lightly tamp soil I.v. Ilex vomitoria 'Stokes Dwarf'(Dwarf Yaupon Holly) 8-12"H & Spr., 3 gal., 24"OC 209 N / FF District. around the root ball in 6" lifts to brace Slope sides of shrub. Do not over compact. When the MISCELLANEOUS loosened soil. planting hole has been backfilled, pour The Contractor shall identify each tree with a plastic tag, identifying its species, and retained Dig and turn the soil water around the root ball to settle the Mixed Hardwood Mulch 3" Depth Min. 9,500 SF until the Certificate of Occupancy is granted. to reduce the soil. compaction to the Existing soil. area and depth Paspalum notatum'Bahia' Sod Weed Free, Sand Grown 2,235 SY All landscape areas shall be protected from vehicular encroachment by wheelstops and/or shown. curbing where immediately abutted by pavement. Staking and Guying Per Details 29 Trees / 34 Palms Root ball rests on Australian Pine, Brazilian Pepper, Melaleuca and Downy Rose Myrtle located on the property existing or 3x widest dimension recompacted soil. of root ball. Rip-Rap 4-6" Dia., 6"Depth, 2' Wide, Install with Filter Fabric 894 SF shall be removed during site preparation. PLANT LIST LEGEND SHRUB & GROUNDCOVER PLANTING DETAIL Multi-trunk trees required to be 2" Cal., shall have a minimum of one (1) 2" Cal. trunk. N - Native SCALE: NOT TO SCALE The quantities indicated on the plant list are intended as a guide for comparison bidding and FF - Florida Freindly does nor relieve the CONTRACTOR from providing a comprehensive material take off. In the event that a discrepancy occurs between the quantities listed in the plant list and the quantities indicated on the plan, the quantities indicated on the plan shall govern, and the Prevailing wind. contractor shall notify the LANDSCAPE ARCHITECT of the discrepancy. Lodge pole stakes. Any alterations to this landscape plan will require prior written permission of the Growth Remove nursery stake. If LANDSCAPE REQUIREMENTS Management Department of Charlotte County. central leader needs to be straightened or held erect, it is The 20' x 20' & 30' x 30' Visibility Triangles maintain a clear space with no obstructions to acceptable to attach a 1 2" x 8' PERIMETER LANDSCAPE BUFFER REQUIREMENTS bamboo pole to the central leader vision between a height of two (2) feet and a height of six (6) feet above grade; trees shall be PLACIDA ROAD/CR-775 (Perimeter Parking Buffer) - Buffer Length - 736 LF, Buffer Width - 8' and trunk. permitted in the clear space as ;long as there is no foliage between these heights. Trees Required (1 per 35 LF) = 736 / 35 = 21 32" long non-abrasive rubber ties. Trees Provided - 21 Rubber tree ties. Walls/fences when required as part of the landscape buffer requirements shall be: a minimum PLAN VIEW Shrubs/Hedge Required - Yes of six (6) feet in height from finished grade; opaque; decorative; and made of one (1) of the Shrubs/Hedge Provided - Yes following materials, concrete aggregate, stucco finish (either painted or colored), brick, stone, Three (3") two inch lodge pole wood, vinyl or plastic. When required as part of a landscape buffer, chain link fences and stakes. Install approximately 2" away from the edge of the root EAST PROPERTY LINE(Type 'C' Buffer) - Buffer Length - 364 LF, Buffer Width - 7' walls constructed of bare concrete block, even if painted, are prohibited. ball. Stake location shall not interfere with permanent branches. Canopy Trees Required (4 per 100 LF) - 364 / 100 = 3.64 x 4 = 14.56 x .80 = 12 "0-'6 Canopy Trees Provided - ( See approved deviation below) 1* Accent Trees Required (2 per 100 LF) - 364 / 100 = 3.64 x 2 = 7.28 x .80 = 6 Accent Trees Provided - ( See approved deviation below) 1* MAINTENANCE AND IRRIGATION Shrubs Required (20 per 100 LF) - 364 / 100 = 3.64 x 20 = 72.8 x .80 = 59 Shrubs Provided - ( See approved deviation below) 1* (1) Plantings, fences, walls, berms and irrigation systems required by this section must be Wall/Fence Required - Yes "0-'2 maintained in good repair. Landscaped and buffers must be kept free of weeds, litterand Wall/Fence Provided - No ( See approved deviation below) 1* debris. INTERIOR LANDSCAPE REQUIREMENTS (2) Damage to any of the landscaping or structures required by Section 3-9-100, shall be replanted or replaced, as applicable, within 90 days or one growing season, whichever is Interior Landscape Islands Required - 10 sooner. Damage to a required fence or wall by a natural disaster shall be repaired within 180 TREE STAKING DETAIL (2" CALIPER OR LESS) Interior Landscape Islands Provided - 8 ( See approved deviation below) days. 2* SCALE: NOT TO SCALE Interior Trees Required - 14 (3) It is unlawful to violate any of the provisions of Section 3-9-100. Interior Trees Provided - 21 (4) The Department (Zoning) may enforce compliance with Section 3-9-100 as provided by law and may perform reasonable inspections to insure continued compliance. TREE REQUIREMENTS (5) All required landscaping and buffers may be served by an automatic irrigation system TREE POINTS REQUIRED(One (1) Tree Point per 2000 SF of Development Area) designed to eliminate the application of water to impervious areas and reduce impacts to A miminum of three fronds Limits of Development Area - 85,419 SF / 4,000 SF = 21.3 existing native vegetation. All required landscaping and buffers shall be irrigated during the shall remain after pruning. Tree Points Required - 21.2 establishment period. The applicant may use a temporary irrigation system or hand watering if Do not damage bud. Tree Points Provided - 29.0 the applicant can demonstrate that such an approach will provide adequate water for plant survival. All alternative plans of irrigation must be approved by the Zoning Official or his/her No scars on trunk. duB designee. TREE POINTS Irrigation design standards. The following standards shall apply to the design installation and 5 Layers of burlap, (5) 2"x4"x16" wood batten maintenance of the irrigation systems. connected with (2) 3/4" QUANT. DESCRIPTION CALIPER TREE POINTS TOTAL TREE POINTS steel bands. thgieH Automatic rain and soil moisture sensing devices shall be installed with irrigation systems in PROPOSED TREES accordance with industry standards. 2"x4"x8' Wood brace knurT (Min. of 3), Toenail to batten. 5 Gumbo Limbo 2" Cal. 1.0 5.0 Drip or micro-jet irrigation should be used where possible. raelC 16 Pigeon Plum 2" Cal. 1.0 16.0 Low trajectory spray nozzles are encouraged. 8 Silver Buttonwood 2" Cal. 1.0 8.0 No above ground impact heads are permitted. Finished grade. TOTAL TREE POINTS 29.0 Irrigation systems shall use the lowest quality water available which will adequately and safely meet the water needs of the landscaping. Planted detention areas and undisturbed natural areas do not require irrigation systems, 1* DUE TO SPACE LIMITATIONS AND POTENTIAL SEAWALL provided however that the property owner is responsible for providing irrigation for 3x widest dimension of root ball. DAMAGE THE APPLICANT REQUESTS A MODIFICATION supplemental plants within natural areas and plants within detention areas. FROM THE REQUIRED 'C' BUFFER UNDER SEC. 3-9-100(d)(6). PALM STAKING DETAIL THE REQUESTED MODIFICATIONS ARE AS FOLLOWS: Irrigation systems must be properly maintained and operated in a manner consistent with 1. SUBSTITUTE CABBAGE PALMS FOR THE CANOPY AND watering restrictions established by the applicable water management district or local authority, UNDERSTORY TREES TO ELIMINATE THE POTENTIAL whichever are stricter. SCALE: NOT TO SCALE ROOT DAMAGE TO THE SEAWALL. 2. SUBSTITUTE SHRUBS 4' HT FOR THE REQUIRED OPAQUE WALL/FENCE AND SHRUB REQUIREMENTS, WHICH WILL BE REQUIRED FOR MAINTENANCE OF THE BUFFER. 2* DUE TO VISUAL AND MANEUVERABILITY LIMITATIONS THE APPLICANT REQUESTS TO RELOCATE THE (2) INTERIOR LANDSCAPE ISLANDS UNDER SEC. 3-9-100(d)(6) TO THE DASHED AREA. The seal appearing on this document was authorized by: John T. Swen, R.L.A., L.A. No. 0001032, State of Florida, on the date adjacent to the seal. 94933 68500062 NEWS T LF C ,ettolrahC E T CL I H moc.liamg@alrnewsnhoj troP C R ,664494 A .T xoB E P NHOJ .O.P A C ,.A.P S 5637-626 D ,NEWS N A )149( L .T NHOJ
nalP epacsdnaL noitavoneR daoR adirolF kraP adicalP ,doowelgnE keerC 1102 regniA
105 tinU 25933 5611-526 ,5 CLL .gdlB LF ROF ,ettolrahC ,llewtA ,liarT )149( imaimaT :enohP troP 1614
Revisions:
Rev. Warranty 09/09/2026
-
-
-
-
-
-
-
Date: 12/17/2025
Scale: NTS
Drawn By: ---
Checked By: JTS
Project #: 21105
The seal appearing on this document was authorized by: John T. Swen, R.L.A., L.A. No. 0001032, State of Florida, on the date adjacent to the seal. SHEET L2
PLANT LIST
SYMBOL BOTANICAL(COMMON NAME) DESCRIPTION QUANTITY COMMENTS
TREES
B.s. C.d. Bursera simaruba(Gumbo Limbo) Coccoloba diversifolia(Pigeon Plum) 10-12'H x 5-6'Spr., 2"Cal. 10-12'H x 5-6'Spr., 2"Cal. 5 16 N / FF N / FF
C.e.1 Conocarpus erectur sericeus(Silver Buttonwood) 8-10'H x 4-5'Spr., 2"Cal., Single-Trunk 8 N / FF
PALMS
C.n. Cocos nucifera 'Green Malayan'(Coconut Palm) 5-6' G.W. 4 FF
S.p. Sabal palmetto(Cabbage Palm) 8-14'C.T., Staggered Heights, Remove Boots 34 N / FF
SHRUBS
C.e. C.es. Conocarpus erectus(Green Buttonwood) Conocarpus erectur sericeus(Silver Buttonwood) 48-54"H x 24-30"Spr., 15 gal., 48"OC, Full 18-24"H x 12-18"Spr., 3 gal., 30"OC, Full 82 42 N / FF N / FF
C.g. Clusia guttifera(Small Leaf Clusia) 18-24"H x 12-18"Spr., 3 gal., 30"OC, Full 243 FF
C.i. Chrysobalanus icaco 'Red Tip'(Cocoplpum) 14-18"H & Spr., 3 gal., 30"OC, Full 18 N / FF
M.c. Muhlenbergia capillaris(Muhly Grass) 24-30"H & Spr., 3 gal., 36"OC, Full 59 N / FF
S.a. Schefflera arboricola 'variegata'(Var. Dwarf Schefflera) 18-24"H & Spr., 3 gal., 30"OC, Full 15 FF
S.r. Strelitzia reginae(Bird of Paradise) 36"H x 24"Spr., 15 gal., 36"OC, Full 9 FF
GROUNDCOVER
C.m. Carissa macrocarpa 'Emerald Blanket'(Dwarf Natal Plum) 12-16"Spr., 3 gal., 24"OC 66 N / FF
H.d. Helianthus debilis(Dune Sunflower) 8-12"Spr., 1 gal., 18"OC 224 N / FF
I.M. Ixora 'Maui'(Orange Ixora) 12-14"H & Spr., 3 gal., 24"OC 76 FF
I.v. Ilex vomitoria 'Stokes Dwarf'(Dwarf Yaupon Holly) 8-12"H & Spr., 3 gal., 24"OC 209 N / FF MISCELLANEOUS
Mixed Hardwood Mulch Paspalum notatum'Bahia' Sod Staking and Guying 3" Depth Min. Weed Free, Sand Grown Per Details 9,500 SF 2,235 SY 29 Trees / 34 Palms
Rip-Rap 4-6" Dia., 6"Depth, 2' Wide, Install with Filter Fabric 894 SF
PLANT LIST LEGEND
N - Native
FF - Florida Freindly
TREE POINTS
QUANT. DESCRIPTION CALIPER TREE POINTS TOTAL TREE POINTS
PROPOSED TREES
5 Gumbo Limbo 2" Cal. 1.0 5.0
16 Pigeon Plum 2" Cal. 1.0 16.0
8 Silver Buttonwood 2" Cal. 1.0 8.0

-
-
-
-
-
-
12/17/2025
NTS
---
JTS
21105
L2
ROF
nalP
epacsdnaL
CLL
,llewtA
Revisions:
Date:
Scale:
Drawn By:
Checked By:
Project #:
SHEET
noitavoneR
kraP
keerC
regniA
105
tinU
,5
.gdlB
,liarT
imaimaT
1614
25933
LF
,ettolrahC
troP
daoR
adicalP
1102
5611-526
)149(
:enohP
adirolF
,doowelgnE
The seal appearing on this document was authorized by:
John T. Swen, R.L.A., L.A. No. 0001032, State of Florida,
on the date adjacent to the seal.
NEWS
.T
NHOJ
T
C
E
T
I
H
C
R
A
E
P
A
C
S
D
N
A
L
94933
LF
,ettolrahC
troP
,664494
xoB
.O.P
,.A.P
,NEWS
.T
NHOJ
68500062
CL
moc.liamg@alrnewsnhoj
5637-626
)149(
Central leader. (See crown
observations detail).
PLANT LIST
Top of root ball shall be flush with
SYMBOL BOTANICAL(COMMON NAME) DESCRIPTION QUANTITY COMMENTS finished grade. Mulch to be kept 6"
away from base of tree.
TREES Prior to mulching, lightly tamp soil
around the root ball in 6" lifts to
Trunk caliper shall
B.s. Bursera simaruba(Gumbo Limbo) 10-12'H x 5-6'Spr., 2"Cal. 5 N / FF meet ANSI Z60 current brace tree. Do not over compact.
When the planting hole has been
edition for root ball size. backfilled, pour water around the
C.d. Coccoloba diversifolia(Pigeon Plum) 10-12'H x 5-6'Spr., 2"Cal. 16 root ball to settle the soil.
Root ball modified as
C.e.1 Conocarpus erectur sericeus(Silver Buttonwood) 8-10'H x 4-5'Spr., 2"Cal., Single-Trunk 8 N / FF required. Dig and turn the soil to reduce
compaction to the area and
Round-topped
PALMS soil berm 4" high x 8" wide depth shown.
above root ball surface
3" layer of mulch, min. 3' dia.
C.n. Cocos nucifera 'Green Malayan'(Coconut Palm) 5-6' G.W. 4 shall be constructed around No more than 1" of mulch on
the root ball. Berm shall
top of root ball.
begin at root ball periphery.
GENERAL NOTES
SHRUBS
Finished grade.
Existing soil.
All plant materials shall be Florida Grade No. 1 or better, as specified in GRADES AND
Slope sides of loosened
C.e. Conocarpus erectus(Green Buttonwood) 48-54"H x 24-30"Spr., 15 gal., 48"OC, Full 82 STANDARDS FOR NURSERY PLANTS, Parts I and II, by the Division of Plant Industry, soil.
Florida Department of Agriculture and Consumer Services, and shall conform to current Bottom of root ball rests on
C.es. 18-24"H x 12-18"Spr., 3 gal., 30"OC, Full 42 N / FF American Association of Nurseryman STANDARDS FOR NURSERY STOCK, unless existing or recompacted
otherwise specified on the plans and plant list. soil. 3x widest dimension of root ball.
C.g. Clusia guttifera(Small Leaf Clusia) 18-24"H x 12-18"Spr., 3 gal., 30"OC, Full 243
C.i. Chrysobalanus icaco 'Red Tip'(Cocoplpum) 14-18"H & Spr., 3 gal., 30"OC, Full 18 All plant materials shall be guaranteed for a period of 90 days (90 days) after final TREE/PALM PLANTING DETAIL
acceptance. All replacement materials shall be guaranteed for an additional 90 days.
Contractor shall be responsible for watering the proposed landscaping through the warranty
SCALE: NOT TO SCALE
and replacement warranty period and shall establish an acceptable schedule that will ensure
the survival of the plant materials. If non-potable water is used it will be from a clean, fresh
water source. Brackish or salt water shall not be acceptable. Contractor may hand water or
install a temporary irrigation system that adequately waters the landscaping. Regardless of
GROUNDCOVER the water method chosen, the Contractor shall be responsible for the warranty of the plant 3" layer of mulch.
materials. No more than 1" of
mulch on top of
root ball. Rootball.
All planting beds shall be mulched with Mixed Hardwood Mulch, to a depth of three (3)
H.d. Helianthus debilis(Dune Sunflower) 8-12"Spr., 1 gal., 18"OC 224 inches. All trees in sod areas shall have a 36" min. radius mulched tree ring. Sod shall be 4" high x 8" wide round - topped soil
berm above root ball surface shall be
Paspalum notatum 'Bahia' sod.
constructed around the root ball.
Finished grade. Berm shall begin at root ball periphery.
Xeriscape principles shall be utilized as outlined by the Southwest Florida Water Managment
Prior to mulching, lightly tamp soil
District. around the root ball in 6" lifts to brace
Slope sides of shrub. Do not over compact. When the
MISCELLANEOUS loosened soil. planting hole has been backfilled, pour
The Contractor shall identify each tree with a plastic tag, identifying its species, and retained
Dig and turn the soil water around the root ball to settle the
Mixed Hardwood Mulch 3" Depth Min. 9,500 SF until the Certificate of Occupancy is granted. to reduce the soil.
compaction to the
Existing soil.
area and depth
Paspalum notatum'Bahia' Sod Weed Free, Sand Grown 2,235 SY All landscape areas shall be protected from vehicular encroachment by wheelstops and/or shown.
curbing where immediately abutted by pavement.
Staking and Guying Per Details 29 Trees / 34 Palms Root ball rests on
Australian Pine, Brazilian Pepper, Melaleuca and Downy Rose Myrtle located on the property existing or 3x widest dimension
recompacted soil. of root ball.
shall be removed during site preparation.
PLANT LIST LEGEND SHRUB & GROUNDCOVER PLANTING DETAIL
Multi-trunk trees required to be 2" Cal., shall have a minimum of one (1) 2" Cal. trunk.
N - Native
SCALE: NOT TO SCALE
The quantities indicated on the plant list are intended as a guide for comparison bidding and
FF - Florida Freindly does nor relieve the CONTRACTOR from providing a comprehensive material take off. In
the event that a discrepancy occurs between the quantities listed in the plant list and the
quantities indicated on the plan, the quantities indicated on the plan shall govern, and the Prevailing wind.
contractor shall notify the LANDSCAPE ARCHITECT of the discrepancy.
Lodge pole stakes.
Any alterations to this landscape plan will require prior written permission of the Growth
Remove nursery stake. If
LANDSCAPE REQUIREMENTS Management Department of Charlotte County. central leader needs to be
straightened or held erect, it is
The 20' x 20' & 30' x 30' Visibility Triangles maintain a clear space with no obstructions to acceptable to attach a 1 2" x 8'
PERIMETER LANDSCAPE BUFFER REQUIREMENTS bamboo pole to the central leader
vision between a height of two (2) feet and a height of six (6) feet above grade; trees shall be PLACIDA ROAD/CR-775 (Perimeter Parking Buffer) - Buffer Length - 736 LF, Buffer Width - 8' and trunk.
permitted in the clear space as ;long as there is no foliage between these heights.
Trees Required (1 per 35 LF) = 736 / 35 = 21
32" long non-abrasive rubber ties.
Trees Provided - 21 Rubber tree ties.
Walls/fences when required as part of the landscape buffer requirements shall be: a minimum
PLAN VIEW
Shrubs/Hedge Required - Yes of six (6) feet in height from finished grade; opaque; decorative; and made of one (1) of the
Shrubs/Hedge Provided - Yes following materials, concrete aggregate, stucco finish (either painted or colored), brick, stone, Three (3") two inch lodge pole
wood, vinyl or plastic. When required as part of a landscape buffer, chain link fences and stakes. Install approximately 2"
away from the edge of the root
EAST PROPERTY LINE(Type 'C' Buffer) - Buffer Length - 364 LF, Buffer Width - 7' walls constructed of bare concrete block, even if painted, are prohibited. ball. Stake location shall not
Canopy Trees Required (4 per 100 LF) - 364 / 100 = 3.64 x 4 = 14.56 x .80 = 12
interfere with permanent branches.
Canopy Trees Provided - ( See approved deviation below)
Accent Trees Required (2 per 100 LF) - 364 / 100 = 3.64 x 2 = 7.28 x .80 = 6
Accent Trees Provided - ( See approved deviation below)
MAINTENANCE AND IRRIGATION
Shrubs Required (20 per 100 LF) - 364 / 100 = 3.64 x 20 = 72.8 x .80 = 59
Shrubs Provided - ( See approved deviation below)
(1) Plantings, fences, walls, berms and irrigation systems required by this section must be
Wall/Fence Required - Yes
maintained in good repair. Landscaped and buffers must be kept free of weeds, litterand
Wall/Fence Provided - No ( See approved deviation below)
debris.
INTERIOR LANDSCAPE REQUIREMENTS (2) Damage to any of the landscaping or structures required by Section 3-9-100, shall be
replanted or replaced, as applicable, within 90 days or one growing season, whichever is
Interior Landscape Islands Required - 10 sooner. Damage to a required fence or wall by a natural disaster shall be repaired within 180
TREE STAKING DETAIL (2" CALIPER OR LESS)
Interior Landscape Islands Provided - 8 ( See approved deviation below) days.
SCALE: NOT TO SCALE
Interior Trees Required - 14 (3) It is unlawful to violate any of the provisions of Section 3-9-100.
Interior Trees Provided - 21
(4) The Department (Zoning) may enforce compliance with Section 3-9-100 as provided by
law and may perform reasonable inspections to insure continued compliance.
TREE REQUIREMENTS
(5) All required landscaping and buffers may be served by an automatic irrigation system
TREE POINTS REQUIRED(One (1) Tree Point per 2000 SF of Development Area)
designed to eliminate the application of water to impervious areas and reduce impacts to
Limits of Development Area - 85,419 SF / 4,000 SF = 21.3 existing native vegetation. All required landscaping and buffers shall be irrigated during the
Tree Points Required - 21.2 establishment period. The applicant may use a temporary irrigation system or hand watering if
Tree Points Provided - 29.0 the applicant can demonstrate that such an approach will provide adequate water for plant
survival. All alternative plans of irrigation must be approved by the Zoning Official or his/her
designee.
TREE POINTS Irrigation design standards. The following standards shall apply to the design installation and
maintenance of the irrigation systems.
QUANT. DESCRIPTION CALIPER TREE POINTS TOTAL TREE POINTS
Automatic rain and soil moisture sensing devices shall be installed with irrigation systems in
PROPOSED TREES accordance with industry standards.
5 Gumbo Limbo 2" Cal. 1.0 5.0 Drip or micro-jet irrigation should be used where possible.
16 Pigeon Plum 2" Cal. 1.0 16.0
Low trajectory spray nozzles are encouraged.
No above ground impact heads are permitted.
TOTAL TREE POINTS 29.0
Irrigation systems shall use the lowest quality water available which will adequately and safely
meet the water needs of the landscaping.
Planted detention areas and undisturbed natural areas do not require irrigation systems,
provided however that the property owner is responsible for providing irrigation for
supplemental plants within natural areas and plants within detention areas.
Irrigation systems must be properly maintained and operated in a manner consistent with
watering restrictions established by the applicable water management district or local authority,
whichever are stricter.
"0-'6
"0-'2
A miminum of three fronds
shall remain after pruning.
Do not damage bud.
No scars on trunk.
5 Layers of burlap,
(5) 2"x4"x16" wood batten
connected with (2) 3/4"
steel bands.
2"x4"x8' Wood brace
(Min. of 3), Toenail to
batten.
Finished grade.
3x widest dimension of root ball.
PALM STAKING DETAIL
SCALE: NOT TO SCALE
thgieH
knurT
raelC
duB
N / FF
FF
S.p. Sabal palmetto(Cabbage Palm) 8-14'C.T., Staggered Heights, Remove Boots 34 N / FF
N / FF
Conocarpus erectur sericeus(Silver Buttonwood)
FF
N / FF
M.c. Muhlenbergia capillaris(Muhly Grass) 24-30"H & Spr., 3 gal., 36"OC, Full 59 N / FF
S.a. Schefflera arboricola 'variegata'(Var. Dwarf Schefflera) 18-24"H & Spr., 3 gal., 30"OC, Full 15 FF
S.r. Strelitzia reginae(Bird of Paradise) 36"H x 24"Spr., 15 gal., 36"OC, Full 9 FF
C.m. Carissa macrocarpa 'Emerald Blanket'(Dwarf Natal Plum) 12-16"Spr., 3 gal., 24"OC 66 N / FF
N / FF
I.M. Ixora 'Maui'(Orange Ixora) 12-14"H & Spr., 3 gal., 24"OC 76 FF
I.v. Ilex vomitoria 'Stokes Dwarf'(Dwarf Yaupon Holly) 8-12"H & Spr., 3 gal., 24"OC 209 N / FF
Rip-Rap 4-6" Dia., 6"Depth, 2' Wide, Install with Filter Fabric 894 SF
1*
1*
1*
1*
2*
8 Silver Buttonwood 2" Cal. 1.0 8.0
1* DUE TO SPACE LIMITATIONS AND POTENTIAL SEAWALL
DAMAGE THE APPLICANT REQUESTS A MODIFICATION
Rev. Warranty 09/09/2026
FROM THE REQUIRED 'C' BUFFER UNDER SEC. 3-9-100(d)(6).
-
THE REQUESTED MODIFICATIONS ARE AS FOLLOWS:
1. SUBSTITUTE CABBAGE PALMS FOR THE CANOPY AND
UNDERSTORY TREES TO ELIMINATE THE POTENTIAL
ROOT DAMAGE TO THE SEAWALL.
2. SUBSTITUTE SHRUBS 4' HT FOR THE REQUIRED
OPAQUE WALL/FENCE AND SHRUB REQUIREMENTS,
WHICH WILL BE REQUIRED FOR MAINTENANCE OF
THE BUFFER.
2*
DUE TO VISUAL AND MANEUVERABILITY
LIMITATIONS THE APPLICANT REQUESTS TO RELOCATE THE
(2) INTERIOR LANDSCAPE ISLANDS UNDER SEC. 3-9-100(d)(6)
TO THE DASHED AREA.

Scale: 1" =30' 30 15 0 30 D D F T 1 U A R 2 H . E M . O E A T M R O G S E T U R E S O S H U Q W N O U P T P E B U D H O B H A A S E E R S I T C E Q C T S R E T E I D H U T A T S I Q T E A E P U L T W U U D I M P O T M W I T I R E L A L R M I E A I T E L G C Y C O L A S D B E A A L T D T H E N / ' B R T C I I F R O F T B O R E E ' U I N A B C E E R N T B S G U A Q S E C H S F E T Q A U E T E F I 4 N I U O O P A R E ' S D E A H N N R E E E S L T S D P D A L M U T O I F W A M S F S N S O T R O H A D I A E N F R E R L R E O N A M L U T A R M T T R . H O S B I E S A A E T D F R E I L T H N I O R E C F H E S T E I L Q . E C E E L C 3 Q U A A N O P - A U I 9 T W A R O W N - I I 1 N R E O T A O S 0 C E M E L N P : 0 D L E N E ( Y d T N O ) A I ( T A F 6 N S L ) D . , BUFFER. AINGER CREEK THE BUF B T F U Y E F P R F E L E ' E C R N ' W B G U I T D F H T F H - E 3 R - 6 7 4 ' LF 4 2 - ' 6 W " I D D I E A , . I R N I S P T R A A L P L , W 6" IT D H EPTH, FILTER FABRIC SOD 4-6" DIA. RIP RAP, 6" DEPTH, 2' WIDE, INSTALL WITH C.n. FILTER FABRIC C.e. 3 S.p. 82 C.m. 22 12 B.s. SOD 1 SOD C.es. C.m. 11 S.a. M 1 . 6 c. H 22 .d 4 . C.e 3 .1 M 2 . 2 c. S. 1 p. 8 S 1 .p. 15 C.es. I.M. 15 C.m. SOD 18 DUE TO VISUAL AND MANEUVERABILITY 7 B.s. LIMITATIONS THE APPLICANT REQUESTS TO I.v. B.s. 5 RELOCATE THE (2) INTERIOR LANDSCAPE 12 1 ISLANDS UNDER SEC. 3-9-100(d)(6) TO THE S.p. C.es. DASHED AREA. C.m. I.v. 1 10 I.M. 4-6" DIA. RIP RAP, 6" DEPTH, 25 46 17 2' WIDE, INSTALL WITH I.v. M.c. FILTER FABRIC S.p. 7 11 SOD 3 I.M. B 1 .s. C.m. I.v. B 1 .s. C 7 .i. S 2 .p. 41 S.p. I 6 .v 4 . M 7 .c. 14 76 1 SOD C.es. SOD S.p. 6 3 C.i. C.n. 11 1 SOD M.c. DUE TO VISUAL AND MANEUVERABILITY SOD 7 LIMITATIONS THE APPLICANT REQUESTS TO S.r. SOD RELOCATE THE (2) INTERIOR LANDSCAPE 9 ISLANDS UNDER SEC. 3-9-100(d)(6) TO THE SOD DASHED AREA. SOD SOD C.d. 3 C.e.1 C.g. 1 C.d. C.g. 64 50 C.d. 2 3 C.e.1 1 20'x20' VISIBILITY C.d. C.e.1 C.d. TRIANGLE 2 1 C.d. C.e.1 C.d. C.e.1 C.g. 2 2 1 2 1 129 PERIMETER LANDSCAPE BUFFER BUFFER LENGTH - 736 LF BUFFER WIDTH - 8' PLACIDA ROAD The seal appearing on this document was authorized by: John T. Swen, R.L.A., L.A. No. 0001032, State of Florida, on the date adjacent to the seal. 94933 68500062 NEWS T LF C ,ettolrahC E T CL I H moc.liamg@alrnewsnhoj troP C R ,664494 A .T xoB E P NHOJ .O.P A C ,.A.P S 5637-626 D ,NEWS N A )149( L .T NHOJ
nalP epacsdnaL noitavoneR daoR adirolF kraP adicalP ,doowelgnE keerC 1102 regniA
105 tinU 25933 5611-526 ,5 CLL .gdlB LF ROF ,ettolrahC ,llewtA ,liarT )149( imaimaT :enohP troP 1614
Revisions:
Rev. Warranty 09/09/2026
-
-
-
-
-
-
-
Date: 12/17/2025
Scale: 1"=30'
Drawn By: ---
Checked By: JTS
Project #: 21105
The seal appearing on this document was authorized by: John T. Swen, R.L.A., L.A. No. 0001032, State of Florida, on the date adjacent to the seal. SHEET L3

D D F T 1 U A R 2 H . E M . O E A T M R O G S E T U R E S O S H U Q W N O U P T P E B U D H O B H A A S E E R S I T C E Q C T S R E T E I D H U T A T S I Q T E A E P U L T W U U D I M P O T M W I T I R E L A L R M I E A I T E L G C Y C O L A S D B E A A L T D T H E N / ' B R T C I I F R O F T B O R E E ' U I N A B C E E R N T B S G U A Q S E C H S F E T Q A U E T E F I 4 N I U O O P A R E ' S D E A H N N R E E E S L T S D P D A L M U T O I F W A M S F S N S O T R O H A D I A E N F R E R L R E O N A M L U T A R M T T R . H O S B I E S A A E T D F R E I L T H N I O R E C F H E S T E I L Q . E C E E L C 3 Q U A A N O P - A U I 9 T W A R O W N - I I 1 N R E O T A O S 0 C E M E L N P : 0 D L E N E ( Y d T N O ) A I ( T A F 6 N S L ) D . ,
AINGER CREEK THE
BUFFER.
BUF B T F U Y E F P R F E L E ' E C R N ' W B G U I T D F H T F H - E 3 R - 6 7 4 ' LF 4 2 - ' 6 W " I D D I E A , . I R N I S P T R A A L P L , W 6" IT D H EPTH,
FILTER FABRIC
SOD
4-6" DIA. RIP RAP, 6" DEPTH,
2' WIDE, INSTALL WITH
C.n. FILTER FABRIC C.e.
3 S.p. 82 C.m.
22 12
B.s.
SOD 1
SOD
C.es.
C.m.
11
S.a. M 1 . 6 c. H 22 .d 4 . C.e 3 .1 M 2 . 2 c. S. 1 p. 8 S 1 .p.
15
C.es.
I.M. 15 C.m. SOD
18 DUE TO VISUAL AND MANEUVERABILITY 7
B.s.
LIMITATIONS THE APPLICANT REQUESTS TO I.v. B.s. 5
RELOCATE THE (2) INTERIOR LANDSCAPE
12 1 ISLANDS UNDER SEC. 3-9-100(d)(6) TO THE
S.p. C.es. DASHED AREA. C.m. I.v.
1 10 I.M. 4-6" DIA. RIP RAP, 6" DEPTH, 25 46
17 2' WIDE, INSTALL WITH
I.v.
M.c. FILTER FABRIC S.p. 7 11 SOD 3 I.M.
B 1 .s. C.m. I.v. B 1 .s. C 7 .i. S 2 .p. 41 S.p. I 6 .v 4 . M 7 .c.
14 76 1 SOD
C.es. SOD S.p.
6 3 C.i. C.n.
11 1 SOD
M.c. DUE TO VISUAL AND MANEUVERABILITY
SOD 7 LIMITATIONS THE APPLICANT REQUESTS TO S.r. SOD
RELOCATE THE (2) INTERIOR LANDSCAPE 9
ISLANDS UNDER SEC. 3-9-100(d)(6) TO THE
SOD DASHED AREA.
SOD SOD
C.d.
3
C.e.1
C.g. 1
C.d.
C.g. 64
50 C.d. 2
3 C.e.1
1 20'x20' VISIBILITY
C.d. C.e.1 C.d. TRIANGLE
2 1 C.d. C.e.1 C.d. C.e.1 C.g. 2
2 1 2 1 129
PERIMETER LANDSCAPE BUFFER
BUFFER LENGTH - 736 LF
BUFFER WIDTH - 8'
PLACIDA ROAD
-
-
-
-
-
-
12/17/2025
1"=30'
---
JTS
21105
L3
ROF
nalP
epacsdnaL
CLL
,llewtA
Revisions:
Date:
Scale:
Drawn By:
Checked By:
Project #:
SHEET
noitavoneR
kraP
keerC
regniA
105
tinU
,5
.gdlB
,liarT
imaimaT
1614
25933
LF
,ettolrahC
troP
daoR
adicalP
1102
5611-526
)149(
:enohP
adirolF
,doowelgnE
The seal appearing on this document was authorized by:
John T. Swen, R.L.A., L.A. No. 0001032, State of Florida,
on the date adjacent to the seal.
NEWS
.T
NHOJ
T
C
E
T
I
H
C
R
A
E
P
A C S D N
A
L
94933
LF
,ettolrahC
troP
,664494
xoB
.O.P ,.A.P ,NEWS
.T
NHOJ
68500062
CL
moc.liamg@alrnewsnhoj
5637-626
)149(
Scale: 1" =30'
30 15 0 30
Rev. Warranty 09/09/2026
-

AINGER CREEK PARK RENOVATION CONSTRUCTION PLANS PREPARED FOR: CHARLOTTE COUNTY BOARD OF COMMISSIONERS PROJECT LOCATION SHEET INDEX CHARLOTTE COUNTY NORTH N.T.S. 1. COVER SHEET 2. EXISTING CONDITIONS PLAN 3. PROPOSED OVERALL PLAN 4. PROPOSED PIER, BOAT RAMP AND DREDGE PLAN 5. DREDGE CROSS SECTIONS 6. BOAT RAMP DETAILS AND SECTIONS 7. BOAT RAMP DETAILS AND SECTIONS 8. SEAWALL DETAILS AND SECTIONS 9. TIMBER PIER DETAILS AND SECTIONS 10. PROJECT SPECIFICATIONS 11. PROJECT SPECIFICATIONS PROJECT PUBLISHED TIDAL INFORMATION: LOCATION TIDAL DATUMS AT ENGLEWOOD, LEMON BAY ARE BASED ON FLORIDA 872 5747 TIME PERIOD = MARCH 1976 - FEB. 1977 TIDAL EPOCH = 1983 - 2001 CONTROL TIDE STATION = NAPLES, GULF OF MEXICO (872 5110) ELEVATIONS OF TIDAL DATUMS ARE REFERENCED IN NAVD 1988. MEAN HIGHER HIGH WATER (MHHW) = +0.13 FT NAVD MEAN HIGH WATER (MHW) = -0.13 FT NAVD MEAN LOW WATER (MLW) = -1.14 FT NAVD MEAN LOWER LOW WATER (MLLW) = -1.44 FT NAVD PROJECT LOCATION N.T.S. NOTES 1. TOPOGRAPHIC AND RESOURCE SURVEY COMPLETED BY COASTAL ENGINEERING CONSULTANTS, INC., ON 1/10/2023. 2. PLANE COORDINATES ARE BASED ON THE TRANSVERSE MERCATOR PROJECTION FOR THE WEST ZONE OF FLORIDA AND REFERENCED TO THE NORTH AMERICAN DATUM OF 1983 (NAD 83). 3. ELEVATIONS SHOWN HEREON ARE IN FEET AND TENTHS AND REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88). REFERENCE BENCHMARK: FLDEP R635 2005, PID: DJ3451, ELEV: 8.92 FT NAVD88, N: 945679.52, E: 546177.32 4. TIDAL REDUCTIONS WERE OBTAINED UTILIZING REAL-TIME KINEMATIC GPS AND REFERENCED TO NAVD. 5. SURVEY ACCURACY STANDARDS, QUALITY CONTROL, AND QUALITY ASSURANCE REQUIREMENTS WERE FOLLOWED DURING THIS SURVEY IN ACCORDANCE WITH USACE EM 1110-2-1003, HYDROGRAPHIC SURVEYING MANUAL, 11/30/2013. 6. INFORMATION SHOWN HEREON REFLECTS CONDITIONS AS THEY EXISTED ON THE SURVEY DATE SHOWN AND CAN ONLY BE CONSIDERED INDICATIVE OF CONDITIONS AT THAT TIME. 7. AERIAL PHOTOGRAPHY PROVIDED BY KUCERA INTERNATIONAL, INC., DATED 9/20/2024. 8. PARK SHALL BE CLOSED FOR DURATION OF CONSTRUCTION. 9. CONTRACTOR SHALL HAVE ACCESS TO ENTIRE PROPERTY FOR STAGING EQUIPMENT AND MATERIALS. SI LATSAOC ,ECIVRES STI DNA RO FO ICEC YB FO ESUER NOITATPADA OT TNEMURTSNI YTILIBAIL .DERAPERP DNA TUOHTIW NA SA SAW NOITAZIROHTUA ,NIEREH TI EB HCIHW LLAHS DETNESERP ROF SEIRAIDISBUS NETTIRW TNEILC SNGISED TUOHTIW DNA STI ESOPRUP RO DNA TNEMUCOD )ICEC( STPECNOC CIFICEPS .CNI SIHT ,STNATLUSNOC EHT EHT NO DNA ROF ECNAILER ,TNEMUCOD YLNO GNIREENIGNE .SEIRAIDISBUS DEDNETNI REPORPMI SIHT SNOITACIFIRALC DNA SNOISIVER RONIM NOITPIRCSED NOISIVER
TVG YB
6202/9/9 ETAD
1 .ON
DETON SA :ELACS .B. .GP .GNR
.PWT
SRENOISSIMMOC FO DRAOB YTNUOC ETTOLRAHC :TNEILC NOITAVONER TEEHS KRAP REVOC KEERC REGNIA :ELTIT
GNIREENIGNE SECIVRES GNIPPAM 4642 4642 4232-346)932( 3411-346)932( moc.gnireenignelatsaoc.www moc.lficec@ofni AC BL :GNIREENIGNE :GNIYEVRUS DNA LACIGOLOEG :ENOHP :XAF ENIRAM YEVRUS :liaM-E & LATSAOC & LATNEMNORIVNE 7791 ecniS STNATLUSNOC GNIREENIGNE seitinummoC 53143 LATSAOC DVLB latsaoC SGNISSORC ADIROLF .CNI gnivreS ,SGNIRPS ATINOB ATI 12
NOB 482 SHEET 1 FILE NO.: 21327-C-1

:TNEILC
:ELTIT
SHEET 1
FILE NO.: 21327-C-1
SI
,ECIVRES
FO
TNEMURTSNI
NA
SA
,NIEREH
DETNESERP
SNGISED
DNA
STPECNOC
EHT
DNA
,TNEMUCOD
SIHT
:ELACS
:ETAD
GNIREENIGNE
ENIRAM
&
LATSAOC
LATSAOC
DNA
FO
ESUER
.DERAPERP
SAW
TI
HCIHW
ROF
TNEILC
DNA
ESOPRUP
CIFICEPS
EHT
ROF
YLNO
DEDNETNI
DETON
SA
6202/71/8
SRENOISSIMMOC
FO
DRAOB
YTNUOC
ETTOLRAHC
LATSAOC
YB
NOITATPADA
DNA
NOITAZIROHTUA
NETTIRW
TUOHTIW
TNEMUCOD
SIHT
NO
ECNAILER
REPORPMI
SECIVRES
LACIGOLOEG
&
LATNEMNORIVNE
STI RO
ICEC
OT
YTILIBAIL
TUOHTIW
EB
LLAHS
SEIRAIDISBUS
STI
RO
)ICEC(
.CNI
,STNATLUSNOC
GNIREENIGNE
GNIREENIGNE
.SEIRAIDISBUS
.B.F
BDS
:NWARD
GNIPPAM
DNA
YEVRUS
4642
AC
:GNIREENIGNE
STNATLUSNOC
.GP
:DEKCEHC
4642
BL
:GNIYEVRUS
TVG
.CNI
NOITAVONER
KRAP
KEERC
REGNIA
.GNR
.PWT
.CES
4232-346)932(
:ENOHP
.ON
DACA
TEEHS
REVOC
7791
ecniS
seitinummoC
latsaoC
gnivreS
gwd.C-72312
3411-346)932(
:XAF
moc.gnireenignelatsaoc.www
DVLB
SGNISSORC
ATINOB
12482
.ON
.FER
NOITPIRCSED
NOISIVER
YB
ETAD
.ON
723.12
moc.lficec@ofni
:liaM-E
53143
ADIROLF
,SGNIRPS
ATINOB
AINGER CREEK PARK RENOVATION
CONSTRUCTION PLANS
PREPARED FOR:
CHARLOTTE COUNTY BOARD OF COMMISSIONERS
PROJECT
LOCATION
SHEET INDEX
CHARLOTTE COUNTY NORTH
N.T.S.
1. COVER SHEET
2. EXISTING CONDITIONS PLAN
3. PROPOSED OVERALL PLAN
4. PROPOSED PIER, BOAT RAMP AND DREDGE PLAN
5. DREDGE CROSS SECTIONS
6. BOAT RAMP DETAILS AND SECTIONS
7. BOAT RAMP DETAILS AND SECTIONS
8. SEAWALL DETAILS AND SECTIONS
9. TIMBER PIER DETAILS AND SECTIONS
10. PROJECT SPECIFICATIONS
11. PROJECT SPECIFICATIONS
PROJECT
PUBLISHED TIDAL INFORMATION: LOCATION
TIDAL DATUMS AT ENGLEWOOD, LEMON BAY
ARE BASED ON FLORIDA 872 5747
TIME PERIOD = MARCH 1976 - FEB. 1977
TIDAL EPOCH = 1983 - 2001
CONTROL TIDE STATION = NAPLES, GULF OF MEXICO
(872 5110)
ELEVATIONS OF TIDAL DATUMS ARE REFERENCED IN
NAVD 1988.
MEAN HIGHER HIGH WATER (MHHW) = +0.13 FT NAVD
MEAN HIGH WATER (MHW) = -0.13 FT NAVD
MEAN LOW WATER (MLW) = -1.14 FT NAVD
MEAN LOWER LOW WATER (MLLW) = -1.44 FT NAVD PROJECT LOCATION
N.T.S.
NOTES
1. TOPOGRAPHIC AND RESOURCE SURVEY COMPLETED BY COASTAL ENGINEERING CONSULTANTS, INC., ON 1/10/2023.
2. PLANE COORDINATES ARE BASED ON THE TRANSVERSE MERCATOR PROJECTION FOR THE WEST ZONE OF FLORIDA
AND REFERENCED TO THE NORTH AMERICAN DATUM OF 1983 (NAD 83).
3. ELEVATIONS SHOWN HEREON ARE IN FEET AND TENTHS AND REFERENCED TO THE NORTH AMERICAN VERTICAL
DATUM OF 1988 (NAVD88). REFERENCE BENCHMARK: FLDEP R635 2005, PID: DJ3451, ELEV: 8.92 FT NAVD88, N:
945679.52, E: 546177.32
4. TIDAL REDUCTIONS WERE OBTAINED UTILIZING REAL-TIME KINEMATIC GPS AND REFERENCED TO NAVD.
5. SURVEY ACCURACY STANDARDS, QUALITY CONTROL, AND QUALITY ASSURANCE REQUIREMENTS WERE FOLLOWED
DURING THIS SURVEY IN ACCORDANCE WITH USACE EM 1110-2-1003, HYDROGRAPHIC SURVEYING MANUAL, 11/30/2013.
6. INFORMATION SHOWN HEREON REFLECTS CONDITIONS AS THEY EXISTED ON THE SURVEY DATE SHOWN AND CAN
ONLY BE CONSIDERED INDICATIVE OF CONDITIONS AT THAT TIME.
7. AERIAL PHOTOGRAPHY PROVIDED BY KUCERA INTERNATIONAL, INC., DATED 9/20/2024.
8. PARK SHALL BE CLOSED FOR DURATION OF CONSTRUCTION.
9. CONTRACTOR SHALL HAVE ACCESS TO ENTIRE PROPERTY FOR STAGING EQUIPMENT AND MATERIALS.
SNOITACIFIRALC
DNA
SNOISIVER
RONIM
TVG
6202/9/9
1

3.8' NAVD 1'-4" 3.1' NAVD 8" 1'-6" 0 15 30 60 2.0' NAVD 1'-3" 1'-6" LEGEND 5' x 8.6' x 5" P R E C A S T -3 = 1 / 1 0 / 2 0 2 3 B A T H Y M E T R IC C ONTOUR (FT NAVD) BLVD S E A W A L L 5' x 8 .8 ' x 8" 1' OHU = O V E R H E A D U T I L I T Y L IN E PINEBAY P A N EL P R E C A S T = C O N C R E T E P O W E R P O L E OHU S E A W A L L = WOOD POWER POLE PANEL = GUY WIRE = LIGHT POLE MHW (-0.13' NAVD) MHW (-0.13' NAVD) MHW (-0.13' NAVD) W = WATER VALVE 5' x 10.7' x 4" S = SANITARY SEWER MANHOLE PRECAST ELEC = ELECTRICAL CABINET -1.4' NAVD SEAWALL PANEL -2.6' NAVD -3.3' NAVD 000,449:N 005,349:N WOOD FENCE E:546,900 E:546,900 SECTION EX1 SECTION EX2 SECTION EX3 SCALE: 1" = 2' SCALE: 1" = 2' SCALE: 1" = 2' -4 TEMPORARY BENCHMARK PKD STAMPED CEC LB 2464 N: 943,466.37 MANGROVE NOTES E: 546,839.27 1. MANGROVES ARE NOT TO BE REMOVED UNLESS SPECIFICALLY IDENTIFIED IN PERMITS AND PLANS. SEAWALL TO BE X1' MANGROVE TO EL: 3.63' NAVD88 OYSTER BAR REMOVED (TYP) E 2. DAMAGING OF MANGROVE BRANCHES BY EQUIPMENT SHALL NOT BE PERMITTED. BE REMOVED (10% LIVE) PROPERTY LINE 3. CONTRACTOR MAY TRIM MANGROVES WITH A CERTIFIED MANGROVE TRIMMER. -3 4. A MINIMUM BUFFER OF 5 FEET SHALL BE MAINTAINED FROM MANGROVE ROOTS DURING DREDGING X1 E -4 OPERATIONS. LIFT STATION -3 MANGROVE TO BE REMOVED (TYP) X -4 -2 X X X X X X X X X X ELE C ELE C X X -2 X X X X X X X X -3 X -2 TIMBER DECK TO -4 -3 S BE REMOVED X -4 X CONCRETE EX2' W X BLOCK MAT TO W BE REMOVED TIMBER PILE SEAWALL TO BE EX2 X X -4 X X -5 -3 -2 -2 - 3 - 4 - 4 -1 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X REMOVED (TYP) BOARDING PIER TO OHU BE REMOVED (TYP) OHU BOAT RAMP TO OHU BE REMOVED EX3' DILAPIDATED CONCRETE OHU BLOCK WALL TO BE REMOVED OHU OHU EX3 OHU OHU OHU OHU X TIMBER PILE W/ OHU X BLUEWAY SIGN X OHU X X OHU X X X X X X X X OHU UPLAND IMPROVEMENTS OHU MANGROVE (TYP) (SEE CIVIL PLANS) OHU OHU OHU X OHU X X OHU X OHU X OHU X TIMBER PIERS TO X X OHU X X BE REMOVED (4) OHU X OHU -3 X X OHU X OHU X X OHU -4 X X - 2 OHU X OHU OAD X X X X MEAN HIGH WATER OOHHUU OOHHUU OOHHUU OOHHUU OOHHUU PLACI S D R A -7 R 75 X OOHHUU OH HU U OHU O O H H U U O OHU OHU OHU OHU CATCH BASIN (TYP) W OHU OHU OHU OHU OHU OHU CO OHU OHU OHU OHU GUARD RAIL VAULT FIBER VAULT 005,349:N TEMPORARY BENCHMARK FPKD STAMPED QGMA E:546,500 N: 944,123.85 E: 546,515.26 EL: 12.21' NAVD88 BRIDGE CLEARANCE AT MHW = 9.0' APPROXIMATE BRIDGE BENTS (TYP) 000,449:N E:546,400 SI LATSAOC ,ECIVRES STI DNA RO FO ICEC YB FO ESUER NOITATPADA OT TNEMURTSNI YTILIBAIL .DERAPERP DNA TUOHTIW NA SA SAW NOITAZIROHTUA ,NIEREH TI EB HCIHW LLAHS DETNESERP ROF SEIRAIDISBUS NETTIRW TNEILC SNGISED TUOHTIW DNA STI ESOPRUP RO DNA TNEMUCOD )ICEC( STPECNOC CIFICEPS .CNI SIHT ,STNATLUSNOC EHT EHT NO DNA ROF ECNAILER ,TNEMUCOD YLNO GNIREENIGNE .SEIRAIDISBUS DEDNETNI REPORPMI SIHT SNOITACIFIRALC DNA SNOISIVER RONIM NOITPIRCSED NOISIVER
TVG YB
6202/9/9 ETAD
1 .ON
DETON SA :ELACS .B.F .GP .GNR
.PWT
C FO DRAOB YTNUOC ETTOLRAHC :TNEILC KRAP TIDNOC KEERC GNITSIXE REGNIA :ELTIT
GNIREENIGNE SECIVRES GNIPPAM 4642 4642 4232-346)932( 3411-346)932( moc.gnireenignelatsaoc.www moc.lficec@ofni AC BL :GNIREENIGNE :GNIYEVRUS DNA LACIGOLOEG :ENOHP :XAF ENIRAM YEVRUS :liaM-E & LATSAOC & LATNEMNORIVNE 7791 ecniS STNATLUSNOC GNIREENIGNE seitinummoC 53143 LATSAOC DVLB latsaoC SGNISSORC ADIROLF .CNI gnivreS ,SGNIRPS ATINOB ATI 12
NOB 482 SHEET 2 FILE NO.: 21327-C-2
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...surveys of the Atlantic coastal waters of Florida and Georgia annually from December ...

State Government of Florida

Bid Due: 10/01/2026

...System(GIS) Solution for Pavement Condition Survey(PCS) Advertisement Number: RFP-DOT-10/11-9015-JP...

State Government of Florida

Bid Due: 10/11/2090

...Bid Title: 26-065 Port of Pensacola Berth 6 Structural Sustainability Survey Category: Requests...

City of Pensacola

Bid Due: 10/20/2026

...surveyed? Do they require additional survey prior to use? A1: Detailed geophysical surveys ...

Charlotte County

Bid Due: 9/30/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.