| Location: | Washington |
|---|---|
| Posted: | Jun 1, 2026 |
| Due: | Jun 15, 2026 |
| Agency: | City of Spokane |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Bid Date | 6/15/26 1:00pm |
Spokane, WA
This project consists of the construction of approximately 1300 square yards of pavement repair excavation including haul, 70 linear feet of storm sewer, 5 drainage structures, 1100 square yards of concrete sidewalk, 1 driver feedback sign system, 2 traffic signal systems, 3 rectangular rapid flashing beacon systems, sundry utility adjustments, and other related miscellaneous items.

With GovernmentContracts, you can:
.../restoration, channelization, signing, concrete bike barriers, driveways, traffic signals, landscaping, storm... drainage, and ...
City of Seattle
Bid Due: 11/04/2026
...882 10# This contract provides for the construction of: Sidewalks, curb and gutter, ...
City of Lakewood
Bid Due: 10/21/2026
...facility, storm drainage inlet, conveyance piping, and pump station, located at Located at ...
Sammamish Plateau Water
Bid Due: 10/28/2026
...streets to paved streets with curb, gutter, sidewalks, storm drainage, street lighting, and ...
Moses Lake city
Bid Due: 11/03/2026