Repair Fire Suppression
Active
Contract Opportunity
Notice ID
W50S8W-25-Q-A004
Related Notice
W50S8W-25-Q-0008
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
NATIONAL GUARD BUREAU
Office
W7N9 USPFO ACTIVITY WYANG 153
Looking for contract opportunity help?
General Information
-
Contract Opportunity Type: Solicitation (Original)
-
Original Published Date: Apr 09, 2025 02:05 pm MDT
-
Original Date Offers Due: Apr 25, 2025 10:00 am MDT
-
Inactive Policy: 15 days after date offers due
-
Original Inactive Date:
May 10, 2025
-
Initiative:
Classification
-
Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
-
Product Service Code: 4820 - VALVES, NONPOWERED
-
NAICS Code:
-
238220 - Plumbing, Heating, and Air-Conditioning Contractors
-
Place of Performance:
Cheyenne
,
WY
82009
USA
Description
Fire Pump Inspection and Isolation
-
Contractor shall perform a visual inspection of the fire pump(s), including but not limited to:
-
Pump casing for signs of leaks, cracks, or corrosion
-
Pump shaft and bearings for signs of wear or damage
-
Suction and discharge valves for proper operation
-
Pressure gauges and flow switches for proper function
-
Contractor shall isolate the fire pump(s) from the fire suppression system, ensuring the system remains operational through backup or temporary means during the work.
-
Contractor shall obtain client approval before proceeding with any work.
Seal and Solenoid Replacement
-
Contractor shall replace the following components on each fire pump:
-
All mechanical seals
-
All solenoid valves
-
Contractor shall use only new, manufacturer-recommended replacement parts.
-
Contractor shall clean and inspect all mating surfaces before installing new seals and solenoids.
-
Contractor shall follow manufacturer specifications and industry best practices for installation and torquing procedures.
Clean Up and Demobilization
-
After replacing the seals and solenoids, the contractor shall reinstate the fire pump(s) into the fire suppression system.
-
Contractor shall perform a comprehensive test of the fire pump(s) and associated systems, including but not limited to:
-
Flow tests to verify pump performance
-
Pressure tests to verify system integrity
-
Alarm and control system functionality
-
Contractor shall record and submit all test results to the client for review and approval.
Attachments/Links
Contact Information
Contracting Office Address
-
KO FOR WYANG DO NOT DELETE 217 DELL RANGE BLVD
-
CHEYENNE , WY 82009-4799
-
USA
Secondary Point of Contact
History
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.