Pybus South Parking Lot Improvements
| Location: |
Washington |
| Posted: |
Jul 22, 2026 |
| Due: |
Aug 5, 2026 |
| Agency: |
City of Wenatchee |
| Type of Government: |
State & Local |
| Category: |
- Y - Construction of Structures and Facilities
|
| Solicitation No: |
10285366 |
| Publication URL: |
To access bid details, please log in. |
|
Post Date
|
07/22/2026
|
|
Quest Number
|
10285366
|
|
Category Code
|
Aggregate,Concrete Walkway,Concrete/Formed/Flatwork/Foundation,Conduit/Electrical/Telemetry,Construction,Control Panels Replacement/Repair/New Installation,Curbs,Electric Charging Stations/Vehicle,Electrical,Electrical Installation/Construction,Excavation,Grade and Surface,Grubbing & Clearing,Parking Lots/Ramps,Pavement - Marking,Paving (Parking Lot Paving),Sitework/Excavating and Grading
|
|
Bid/Request Name
|
Pybus South Parking Lot Improvements
|
|
Bid Closing Date
|
08/05/2026 11:00 AM PDT
|
|
City
|
Wenatchee
|
|
County
|
Chelan
|
|
State
|
WA
|
|
Owner
|
Wenatchee WA, City of
|
|
Soliciator
|
Wenatchee WA, City of
|
|
Posting Type
|
Construction Project
|
Location Details
|
Site Address:
|
101 South Worthen Street
|
|
|
City:
|
Wenatchee
|
|
|
County:
|
Chelan
|
|
|
State/Province:
|
WA
|
|
|
Site Directions:
|
Traveling westbound on the SR 285 George Sellar Memorial Bridge, take the first off ramp north onto S. Wenatchee Ave. Continue northbound until Thurston St. Turn right, then continue to S Columbia St. Turn left and then take the first right towards the Thurston Street underpass. Continue to the intersection of Thurston St and Worthen St. Turn Left on Worthen Street, continue to Orondo Street. This is the unimproved parking area for Pybus Market and the northern limit of the project.
|
|
Project Details
|
Closing Date:
|
Wed, 08/05/2026 11:00 AM PDT
|
|
|
Project Bid Received By & Opening Information:
|
Nataliann Tutino, Senior Financial Analyst Wenatchee City Hall 301 Yakima St Wenatchee, WA 98801
|
|
|
Est. Value Notes:
|
$530,000 to $620,000
|
|
|
Est. Completion Date:
|
Sept. 30, 2026
|
|
Project Description
|
Project Owner Number:
|
CPN 2317
|
|
|
Project Category Code:
|
Paving (Parking Lot Paving), Pavement - Marking, Aggregate, Construction, Concrete/Formed/Flatwork/Foundation, Concrete Walkway, Electrical Installation/Construction, Control Panels Replacement/Repair/New Installation, Grade and Surface, Excavation, Electrical, Parking Lots/Ramps, Conduit/Electrical/Telemetry, Sitework/Excavating and Grading, Curbs, Electric Charging Stations/Vehicle, Grubbing & Clearing
|
|
|
Description:
|
The purpose of this project is to provide improved access to the Pybus South Parking Lot necessary to accommodate Electric Vehicle Chargers provided through funding by Washington’s Climate Commitment Act and grading the entire site to final subgrade elevations along Worthen Street south of Orondo Street. The construction provides for the underground utility preparation for the electric charging units that the city has obtained and for future development phases. All work shall be completed in accordance with the contract plans, special provisions, and the 2026 WSDOT Standard Specifications.
|
|
|
Additional Description:
|
The Electrical Utility preparation includes installation of Chelan PUD primary electrical line extension for 480V 3 Phase transformer and the purchasing of 1200A Switchboard compatible with PUD metering and purchasing 600A Panel board cabinet and preparing foundations for EVC installed by others. Preparing a 120V lighting control cabinet for future parking lot lighting.
|
|
Primary Contact Information
Owner Details
|
Owner Name:
|
Wenatchee WA, City of
|
|
|
Address:
|
301 Yakima Street, Wenatchee, WA - 98801
|
|
|
Phone:
|
509-888-3296
|
|
|
Contact:
|
Nataliann Tutino
|
|
|
Email:
|
ntutino@wenatcheewa.gov
|
|
Solicitor Details
|
Solicitor Name:
|
Wenatchee WA, City of
|
|
|
Design Discipline:
|
Soliciting agent
|
|
|
Address:
|
301 Yakima Street, Wenatchee, WA - 98801
|
|
|
Phone:
|
509-888-3296
|
|
|
Fax:
|
509-888-3201
|
|
|
Contact:
|
Nataliann Tutino
|
|
|
Email:
|
ntutino@wenatcheewa.gov
|
|
Project Document Information
|
Document Information:
|
Please see attached.
|
|
|
Quest eBidDoc™ Delivery Info:
|
Download delivery fee is $22.00 , file size is 84 MB .
Preview
Download
|
|
You must be a plan holder to enter an Online Bid. Do you want to continue?
Yes No
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
See also
...and Water Construction,Sidewalks/Curbs/Gutters,Signage,Sitework/Excavating and Grading,Storm Drain.../Roadway Reconstruction , Asphalt Overlay, Rehab. and/or Maint., ...
City of Wenatchee
Bid Due: 9/16/2026
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.