Transportation Maintenance Deltona - Replace Fuel Island and Tanks

Location: Florida
Posted: Jun 29, 2026
Due: Jul 15, 2026
Agency: Volusia County Schools
Type of Government: State & Local
Category:
  • J - Maintenance, Repair, and Rebuilding of Equipment
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: Project No. 2648210
Publication URL: To access bid details, please log in.
Transportation Maintenance Deltona - Replace Fuel Island and Tanks - Project No. 2648210
Mandatory Prebid Meeting: June 25, 2026 at  11:30 AM
Bid: July 15, 2026 at  1:30 PM
Project Bid Documents: Plans
Project Manual
Prebid Sign-in
Estimate: $1,323,828.10
Consultant: Kimley-Horn and Associates, Inc.
Jeremy Demboski

(813) 620-1460
Owner: VCS Project Manager
Jim Bott

(386) 947-8786
Bid Status: Active

Attachment Preview

VOLUSIA
COUNTY SCHOOLS
"LEADING WITH GRACE AND RESPECT"
THE SCHOOL BOARD OF VOLUSIA
COUNTY FLORIDA
200 North Clara Avenue
DeLand, Florida 32720
TRANSPORTATION / MAINTENANCE -
DELTONA
REPLACE FUEL ISLAND AND TANKS
VCS Project NO. 2648210
2101 EUSTACE AVE DELTONA, FL 32725
SCHOOL BOARD
MEMBERS
RUBEN COLON
KRISTA GOODRICH
DONNA BROSEMER
JAMIE HAYNES
JESSIE THOMPSON
DR. CARMEN J. BALGOBIN
BOARD CHAIR
VICE BOARD CHAIR
MEMBER
MEMBER
MEMBER
SUPERINTENDENT
201 N FRANKLIN ST
SUITE 1400
TAMPA, FL 33602
PHONE: 813.620.1460
REGISTRY NO. 35106
This document is an instrument of service prepared
solely for Kimley-Horn's client and for a particular
purpose. Any other use or reliance is without liability to
Kimley-Horn.
DESCRIPTION OF WORK
REPLACE AND RELOCATE EXISTING 6,000 GALLON UNLEADED AND 12,500 GALLON DIESEL UNDERGROUND STORAGE TANKS
WITH 12,000 GALLON UNLEADED AND 12,500 GALLON DIESEL ABOVEGROUND STORAGE TANKS FOR THE BASE BID, ALSO
REPLACE EXISTING 20,000 GALLON DIESEL ABOVEGROUND STORAGE TANK WITH NEW 20,000 GALLON DIESEL
ABOVEGROUND STORAGE TANK AS AN ADD ALTERNATE. ALL PIPING WILL BE REPLACED AND ROUTED ABOVEGROUND WITH
CARBON STEEL PIPE AND EXTERIOR COATINGS FOR THE BASE BID AND STAINLESS STEEL PIPE AS AN ADD ALTERNATE. THE
EXISTING CANOPY WILL BE REPLACED AND RELOCATED. THE FUELING MANAGEMENT SYSTEM WILL BE REPLACED AND
RELOCATED. THE 2 DISPENSERS (4 TOTAL HOSES) WILL BE REPLACED WITH 3 DISPENSERS (6 TOTAL HOSES).
Architect's Statement of Compliance
To the best of my knowledge, these drawings and the project manual are complete and comply with
the Florida Building Code.
LOCATION MAP
ENGINEERS & CONSULTANTS
PLUMBING / FUEL OIL
KIMLEY-HORN
201 N. FRANKLIN ST., SUITE 1400
TAMPA, FL 33602
(813) 556 - 6670
JEREMY DEMBOSKI
JEREMY.DEMBOSKI@KIMLEY-HORN.COM
WWW.KIMLEY-HORN.COM
ELECTRICAL
KIMLEY-HORN
201 N. FRANKLIN ST., SUITE 1400
TAMPA, FL 33602
(813) 467 - 7527
JIMMY NGUYEN
JIMMY.NGUYEN@KIMLEY-HORN.COM
WWW.KIMLEY-HORN.COM
STRUCTURAL
KIMLEY-HORN
11601 KEW GARDENS AVE, SUITE 200
PALM BEACH GARDENS, FL 33410
(561) 840 - 0281
SHEILA PREBLE
SHEILA.PREBLE@KIMLEY-HORN.COM
WWW.KIMLEY-HORN.COM
CIVIL
KIMLEY-HORN
6876 MARWICK LANE, SUITE 350
ORLANDO, FL 32827
(407) 409 - 7003
BLAKE WAGNER
BLAKE.WAGNER@KIMLEY-HORN.COM
WWW.KIMLEY-HORN.COM
NOT TO SCALE
PROJECT SHEET INDEX
SHEET NUMBER
SHEET NAME
.GENERAL
G000
COVER SHEET
.PLUMBING
P000
P001
P101
PD102
P201
P300
P301
P302
P303
FUEL OIL SYMBOLS, ABBREVIATIONS, SHEET SPECS AND NOTES
FUEL OIL EQUIPMENT LIST
FUEL OIL NEW PLAN
FUEL OIL DEMO PLAN
FUEL OIL ISOMETRIC PLANS
FUEL OIL DETAILS
FUEL OIL DETAILS
FUEL OIL SCHEMATIC DIAGRAMS
FUEL OIL SITE SCHEMATIC PLAN
CIVIL
C100
C200
C300
C310
C400
C500
C600
GENERAL NOTES
STORMWATER POLLUTION PREVENTION PLAN
OVERALL EXISTING CONDITIONS AND DEMOLITION PLAN
EXISTING CONDITIONS AND DEMOLITION PLAN
SITE PLAN
PAVING AND GRADING PLAN
GENERAL CONSTRUCTION DETAILS
ELECTRICAL
E000
E001
ED101
E101
E102
E201
E500
E600
E601
ELECTRICAL SYMBOLS, ABBREVIATIONS, AND NOTES
ELECTRICAL SPECIFICATIONS
ELECTRICAL DEMO POWER PLAN
OVERALL POWER PLAN
ENLARGED POWER PLAN FUEL CANOPY
ELECTRICAL LIGHTING PLAN
ELECTRICAL RISR DIAGRAM
ELECTRICAL DETAILS
HAZARD CLASSIFICATIONS
STRUCTURAL
S100
S200
S201
S202
STRUCTURAL GENERAL NOTES
CANOPY DETAILS
FUEL TANK SLAB DETAILS 1 OF 2
FUEL TANK SLAB DETAILS 2 OF 2
CONSTRUCTION DOCUMENTS - 03/23/2026
ARCH/ENGR OF RECORD
JEREMY DEMBOSKI
DESIGNED BY
JTD
DRAWN BY
SRM
ISSUE DATE
3/23/2026
AE PROJECT NUMBER
145642003
SHEET TITLE
COVER SHEET
DRAWING NO.
G000
PLUMBING SYMBOLS AND LEGEND
SYMBOL
ABBREVIATION DESCRIPTION
BV
CS
BFV
GV
CHV
GLV
ANV
TDV
HB
HV
BP
GPR
BALL VALVE
CIRCUIT SETTER OR FLOW CONTROL VALVE
BUTTERFLY VALVE
GATE VALVE
CHECK VALVE
GLOBE VALVE
ANGLE VALVE
TRIPLE DUTY VALVE
HOSE BIB
3/4" HOSE END DRAIN VALVE
BACKFLOW PREVENTOR
GAS PRESSURE REGULATOR
STR
STR
PTR
RV
WHA
PG
TH
FCO/GCO
WCO
PD
PU
PU
PD
COP
FLS
FD
VTR
STRAINER
STRAINER WITH 3/4" HOSE END DRAIN VALVE
PRESSURE - TEMPERATURE RELIEF VALVE
PRESSURE RELIEF VALVE
2-WAY CONTROL VALVE
3-WAY CONTROL VALVE
UNION
REDUCER
WATER HAMMER ARRESTOR
PRESSURE GAGE WITH GAUGE COCK
THERMOMETER
FLOOR OR GRADE CLEANOUT
WALL CLEANOUT
PIPING TEE DOWN
PIPING TEE UP
PIPING ELBOW UP
PIPING ELBOW DOWN
BRANCH - TOP CONNECTION
BRANCH - BOTTOM CONNECTION
CAP ON END OF PIPE
ARROW INDICATES DIRECTION OF EACH FLOW
FLOOR SINK
FLOOR DRAIN
PLUMBING VENT THRU ROOF
FLORIDA DEPARTMENT OF ENVIRONMENTAL
PROTECTION APPROVED STORAGE TANK SYSTEM
EQUIPMENT
EQ-352 MODERN WELDING, FIREGUARD DOUBLE-WALL ABOVEGOUND TANK
EQ-527 MORRISON 918 AST CLOCK GAUGE WITH AN ALARM SYSTEM
EQ-356 MORRISON 9095A OVERFILL PROTECTION VALVE
EQ-535 MORRISON 515 REMOTE FILL SPILL CONTAINMENT
EQ-628 VEEDER-ROOT MAG SENSOR HYDROSTATIC TEST AND SECONDARY
CONTAINMENT VACUUM SENSING SYSTEM
EQ-876 VEEDER-ROOT TLS4 CONSOLE
NOTE:
THE STORAGE TANK SYSTEM INSTALLATION PLAN MEETS THE
REQUIREMENTS OF CHAPTER 62-762 FLORIDA ADMINISTRATIVE CODE AND
ALL THE APPLICABLE REFERENCE GUIDELINES.
FUEL OIL SHEET LIST
SHEET #
P000
P001
P101
P201
P300
P301
P302
P303
PD102
SHEET NAME
FUEL OIL SYMBOLS, ABBREVIATIONS, SHEET SPECS AND NOTES
FUEL OIL EQUIPMENT LIST
FUEL OIL NEW PLAN
FUEL OIL ISOMETRIC PLANS
FUEL OIL DETAILS
FUEL OIL DETAILS
FUEL OIL SCHEMATIC DIAGRAMS
FUEL OIL SITE SCHEMATIC PLAN
FUEL OIL DEMO PLAN
PLUMBING PIPING LEGEND
SYMBOL
ST
ST
ODL
ODL
CD
TW
TP
G
MPG
HPG
LPG
CA
ABBREVIATION DESCRIPTION
CW
COLD WATER
HWS
HOT WATER SUPPLY
HWR
HOT WATER RETURN
W
SANITARY WASTE
W
SANITARY WASTE (ABOVE GRADE)
GLW
GREASE LADEN WASTE
V
VENT PIPING
ST
STORM OR ROOF DRAIN PIPING
ST
STORM OR ROOF DRAIN PIPING (ABOVE GRADE)
ODL
OVERFLOW ROOF DRAIN PIPING
ODL
OVERFLOW ROOF DRAIN PIPING (ABOVE GRADE)
CD
CONDENSATE DRAIN PIPING
TW
TEMPERED WATER (105* F)
TP
TRAP PRIMER WATER PIPING
G
GAS - LOW PRESSURE (7"-14" WC)
MPG
GAS - MEDIUM PRESSURE (2-3 PSI)
HPG
GAS - HIGH PRESSURE (5 PSI AND ABOVE)
LPG
GAS - LIQUIFIED PETROLEUM
CA
COMPRESSED AIR PIPING
PLUMBING ANNOTATIONS
SYMBOL ABBREVIATION DESCRIPTION
RTU
MECHANICAL EQUIPMENT - (SEE MECHANICAL SCHEDULE)
X
1
M6.1
DETAIL REFERENCE CALLOUT, DETAIL NUMBER AND SHEET
1
P0.00
L-1
?
SECTION VIEW CALLOUT, DETAIL NUMBER AND SHEET
POC
AP
POINT OF CONNECTION - NEW ITEMS TO EXISTING ITEMS
PLUMBING FIXTURE SCHEDULE - (SEE SCHEDULE)
SHEET KEYNOTES
ACCESS PANEL
APPLICABLE CODES
1.
2023 FLORIDA BUILDING CODE
2023 FLORIDA BUILDING CODE, PLUMBING
2023 FLORIDA BUILDING CODE, MECHANICAL
2023 FLORIDA BUILDING CODE, FUEL GAS
2023 FLORIDA BUILDING CODE, ENERGY CONSERVATION
2.
FLORIDA DEPARTMENT OF ENVIRONMENTAL QUALITY
62-762 F.A.C. ABOVEGROUND FUEL TANK INSTALLATIONS.
3.
NATIONAL FIRE PROTECTION ASSOCIATION:
30: FLAMMABLE AND COMBUSTIBLE LIQUID CODE
30A: AUTOMOTIVE SERVICE STATION CODE
70: NATIONAL ELECTRIC CODE
4.
AMERICAN PETROLEUIM INSTITUTE
1604: CLOSURE OF UNDERGROUND PETROLEUM STORAGE TANKS
334: GUIDE TO LEAK DETECTION FOR ABOVEGROUND STORAGE TANKS
340: LIQUID RELEASE PREVENTION AND DETECTION MEASURES FOR
ABOVEGROUND STORAGE FACILITIES
5.
PETROLEUM EQUIPMENT INSTITUTE:
RP 200 INSTALLATION OF ABOVEGROUND STORAGE SYSTEMS
RP 500 INSPECTION & MAINTENANCE OF MOTOR FUEL DISPENSING EQUIPMENT
RP 600 OVERFILL PREVENTION FOR ASTS
6.
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION:
CONSTRUCTION SAFETY AND HEALTH REGULATIONS SUBPART P, 1902.50 THRU
1926.653
7.
MANUFACTURER'S STANDARDIZATION SOCIETY
MSS SP-58: PIPE HANGERS AND SUPPORTS
FUEL DISPENSER REGULATIONS
AND LABELING
1.
DISPENSERS MUST BE INSTALLED IN ACCORDANCE WITH LOCAL AND STATE
REGULATIONS.
2.
THE FOLLOWING REGULATION IS APPLICABLE TO THE UNLEADED FUEL DISPENSING
SYSTEM AND MUST TAKE PRECEDENCE OVER ALL INDICATED DATA ON THIS
DRAWING:
A.
16 CFR PART 306 - AUTOMOTIVE FUEL RATINGS, CERTIFICATION, AND
POSTING.
3.
ALL LABELS MUST BE RESISTANT TO FUEL, GREASE, OIL, SOLVENTS, AND
DETERGENTS AND MUST BE ABLE TO WITHSTAND EXTREME WEATHER CONDITIONS
FOR AT LEAST ONE YEAR.
4.
ACCEPTABLE LABELS INCLUDE LABELS APPROVED BY THE CONTRACTING OFFICER
AND STANDARD TO THE INDUSTRY
PLUMBING ABBREVIATIONS
ABBREVIATION
@
ADA
AFF
AHJ
API
APPROX.
AST
ATG
AUX.
AV
AW
BHP
BOP
BTU/H
COMB.
CONN.
CS
CSDL.
DBL.
D.C.
DIA
DIM.
DSL
(E)
EFF
ELECT.
ELD
ELL
EMT
E.S.O.
F
F-24
F.G.
FLA
FLEX
FNPT
FO-D
FO-UL
FPM
FRP
FSP
GA
GAL.
GPM
HD
H.P.
I.D.
KW
LBS.
MBH
MAX.
MCA
MFRS
MGS
MIN.
MNPT
MOCP
MW
(N)
N/A
N/C
NEC
NFPA
NPT
N/O
NO.
N.T.S.
O.D.
OFCI
P
PD
PRV
PSI
PVC
Q
RD
REF.
REQD.
RPM
RSG.
SEC.
SPECS
SS
S.T.P.
T.L.M.
TYP.
U.B.C.
U.F.C.
U.G.
U.L.
U.M.C.
UNL
U.P.C.
U.S.T.
V
VPR
VAC.
VFD
V.R.
W/
W.C.
WVS
DESCRIPTION
AT
AMERICANS WITH DISABILITIES ACT
ABOVE FINISHED FLOOR
AUTHORITY HAVING JURISDICTION
AMERICAN PETROLEUM INSTITUTE
APPROXIMATELY
ABOVEGROUND STORAGE TANK
AUTOMATIC TANK GAUGE
AUXILIARY
ACID VENT
ACID WASTE
BRAKE HORSE POWER
BOTTOM OF PIPE
BRITISH THERMAL UNIT PER HOUR
COMBINATION
CONNECTION
CARBON STEEL
CONTINUOUS STATISTICAL LEAK DETECTION
DOUBLE
DIRECT CURRENT
DIAMETER
DIMENSION
DIESEL FUEL
EXISTING
EFFICIENCY
ELECTRICAL
ENHANCED LEAK DETECTION
ELBOW
ELECTRICAL METALLIC TUBING
EMERGENCY SHUT OFF
FILL
JET FUEL
FIBERGLASS
FULL LOAD AMPS
FLEXIBLE
FEMALE NATIONAL PIPE THREAD
FUEL OIL - DIESEL
FUEL OIL - UNLEADED
FEET PER MINUTE
FIBERGLASS REINFORCED PLASTIC
FUEL SAMPLE POINT
GAGE OR GAUGE
GALLON
GALLONS PER MINUTE
HEAD PRESSURE
HORSEPOWER
INSIDE DIAMETER
KILOWATT
POUNDS
ONE THOUSAND BTUH
MAXIMUM
MINIMUM CICUIT AMPS
MANUFACTURER'S
MOGAS FUEL
MINIMUM
MALE NATIONAL PIPE THREAD
MAXIMUM OVER CURRENT PROTECTION
MONITOR WELL
NEW
NOT APPLICAPLE
NORMALLY CLOSED
NATIONAL ELECTRIC CODE
NATIONAL FIRE PROTECTION ASSOCIATION
NATIONAL PIPE THREAD
NORMALLY OPEN
NUMBER
NOT TO SCALE
OUTSIDE DIAMETER
OWNER FURNISHED, CONTRACTOR INSTALLED
PRODUCT LINE
PRESSURE DROP
PRESSURE REDUCING VALVE
POUNDS PER SQUARE INCH
POLYVINYL CHLORIDE
QUANTITY
ROOF DRAIN
REFERENCE
REQUIRED
REVOLUTIONS PER MINUTE
RIGID STEEL GALVANIZED
SECTION
SPECIFICATIONS
STAINLESS STEEL
SUBMERGED TURBINE PUMP
TANK LEVEL MONITOR
TYPICAL
UNIFORM BUILDING CODE
UNIFORM FIRE CODE
UNDER GROUND
UNDERWRITER'S LABORATORY
UNIFORM MECHANICAL CODE
UNLEADED
UNIFORM PLUMBING CODE
UNDERGROUND STORAGE TANK
VAPOR LINE
VAPOR FUEL
VOLT AMP CURRENT
VARIABLE FREQUENCY DRIVE
VAPOR RECOVERY
WITH
WATER COLUMN
WASTE VENT STACK
FUEL OIL GENERAL NOTES
GENERAL:
A.
CONTRACTOR SHALL HAVE A MINIMUM OF 5 YEARS EXPERIENCE INSTALLING FLEET FUEL
SYSTEMS AND MUST HAVE THE FOLLOWING CERTIFICATIONS IN ORDER TO BID ON THIS PROJECT
OR BE INVOLVED ON ANY CONSTRUCTION.
a.
OPW FUEL MANAGEMENT CERTIFICATION
b.
GILBARCO / VEEDER-ROOT CERTIFICATION
B.
ALL PIPING WILL BE PRIMARY PIPING WITHIN SECONDARY PIPING. SIZES TO BE SPECIFIED ON
DRAWINGS. PIPING TO BE INSTALLED PER MANUFACTURERS INSTRUCTIONS.
C.
ALL ABOVEGROUND PIPING WILL BE LISTED IN ACCORDANCE WITH UL/ULC 1369.
D.
THE INFORMATION INDICATED ON THESE DRAWINGS AS EXISTING IS BASED UPON INFORMATION
TAKEN FROM AS-BUILT DRAWINGS, FIELD INVESTIGATION, AND INFORMATION OBTAINED FROM
EXISTING SUBMITTAL DATA, ETC. THE PLANS DO NOT GUARANTEE ACCURACY BUT ARE ONLY AN
INDICATION OF EXISTING CONDITIONS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD
VERIFY EXACT CONDITIONS SUCH AS EQUIPMENT PLACEMENT, PIPING (SIZE, ROUTING, AND
ELEVATION), ETC. THE DRAWINGS ARE INTENDED TO PROVIDE THE CONTRACTOR AN INDICATION
OF THE SYSTEM INSTALLED IN THE FACILITY TO DATE. IT WILL BE THE CONTRACTOR'S
RESPONSIBILITY TO MAKE ADJUSTMENTS TO THE DRAWING INFORMATION AS REQUIRED TO
MATCH EXISTING FIELD CONDITIONS.THE GENERAL CONTRACTOR ACCEPTS FULL
RESPONSIBILITY FOR PROPER HANDLING AND INSTALLATION OF PIPING SYSTEM. THE GENERAL
CONTRACTOR SHALL ENSURE THAT GOOD WORKMANSHIP AND CONSTRUCTION PROCEDURES
ARE FOLLOWED THROUGHOUT THE INSTALLATION, REGARDLESS OF INCLUSION OR OMISSION OF
ANY APPLICABLE SUGGESTION IN THESE INSTRUCTIONS OR ON THE DRAWINGS.
RESPONSIBILITY:
A.
ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL ALL POWER WIRING, EQUIPMENT
DISCONNECTS, LOW VOLTAGE WIRING, ATG SENSOR, AND PROBE WIRING TO MAKE SYSTEM
OPERATIONAL
B.
FUEL OIL CONTRACTOR TO PROVIDE, CALIBRATE, AND INSTALL DISPENSERS, TANKS, PUMPS, AND
PIPING.
C.
FUEL OIL CONTRACTOR, ELECTRICAL CONTRACTOR, CONSTRUCTION MANAGER, AND NETWORK
SUPPLIER MUST BE ON SITE ON DAY OF SYSTEM STARTUP.
SETTLEMENT:
THE USE OF SPECIFIED MATERIALS AND SPECIFIED PROCEDURES WILL ENSURE THAT TANK
SETTLEMENT, TANK DISTORTION, MOVEMENT IN CONCRETE SLAB, OR INSTALLATION FAILURE DO
NOT OCCUR. SHOULD ANY INSTALLATION FAILURE BE MADE APPARENT, THE CONTRACTOR WILL
ASSUME RESPONSIBILITY FOR NOT FOLLOWING THE SPECIFIED PROCEDURES AND WILL INCUR
ANY ADDITIONAL COSTS ASSOCIATED WITH THE CORRECTIVE MEASURES, INCLUDING COMPLETE
REMOVAL AND RESETTING OF ALL ABOVEGROUND TANKAGE AT THE SITE. IF IT IS DETERMINED
THAT MOVEMENT, SETTLEMENT, OR DISTORTION HAS BEEN CAUSED BY FACTORS BEYOND THE
CONTRACTOR'S CONTROL, THE COST OF REMEDIAL MEASURES WILL BE BORNE BY OTHERS. THE
FUEL OIL INSTALLATION CONTRACTOR DOES HEREBY AGREE TO GUARANTEE THE
ABOVEGROUND TANKAGE INSTALLATION AGAINST FAILURE AS OUTLINED HERIN ABOVE, FOR A
PERIOD OF ONE (1) YEAR FROM DATE OF FINAL ACCEPTANCE.
TANK, DISPENSER, AND PIPES:
A.
THE DRAWINGS AND SPECIFICATIONS WILL DETERMINE THE EXACT LOCATION, NUMBER, SIZE,
AND TYPE OF EQUIPMENT TO BE INSTALLED AND INSTALLATION TO BE FOLLOWED.
B.
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE MANUFACTURER'S, FEDERAL, STATE, AND
ALL OTHER APPLICABLE CODES, RULES, AND LOCAL REQUIREMENTS.
C.
CONTRACTOR ASSUMES RESPONSIBILITY FOR ALL NECESSARY PERMITS, INSPECTIONS, AND
TESTS AND SHALL INCLUDE THE COST OF THESE REQUIREMENTS IN THEIR BID.
D.
CONTRACTOR TO INSTALL AND TEST ALL ALL TANKS, PIPING, DISPENSERS, AND MONITORING
EQUIPMENT PER MANUFACTURER'S INSTRUCTIONS, INCLUDING THE INSTALLATION OF STAGE I
VAPOR RECOVERY.
E.
CONTRACTOR SHALL INSTALL ALL ABOVEGROUND PIPING SHOWN ON THE DRAWINGS, WITH A
MINIMUM NUMBER OF BENDS/ELBOWS.
F.
NEW ABOVEGROUND FUEL PIPING MUST BE SINGLE WALL CARBON STEEL MATERIAL WITH
EXTERIOR COATINGS.
G.
ABOVEGROUND TANKS AND PIPES MUST USE COLOR CODING, BANDING, PRODUCT NAMES, AND
DIRECTION OF FLOW TO IDENTIFY PRODUCT SERVICE.
H.
PROVIDE LOW POINT DRAINS AT ALL LOW POINTS AND HIGHT POINT VENTS AT ALL HIGHT POINTS.
INSTALL FUEL PIPING WITH A MINIMUM SLOPE OF 0.2% DOWN FROM THE HIGH POINTS TO THE
LOW POINTS, UNLESS OTHERWISE INDICATED.
I.
PIPE SUPPORTS WELDED TO CARBON STEEL MUST BE EXTERIOR COATED CARBON STEEL. ALL
OTHER PIPE SUPPORTS AND OTHER MISCELLANEOUS METAL SHAPES MUST BE HOT DIPPED
GALVANIZED CARBON STEEL, UNLESS OTHERWISE INDICATED.
FINISH:
ALL PRODUCTS TO BE SHERWIN-WILLIAMS. BOLLARDS AND ISLAND FORMS (IF REQUIRED BY AHJ)
TO MATCH EXISTING.
CANOPY:
CANOPY IS A PREFAB STEEL STRUCTURE, REFER TO STRUCTURAL DRAWINGS FOR MORE
INFORMATION.
CONTRACTOR:
A.
CONTRACTOR IS RESPONSIBLE FOR REVIEWING ALL DRAWINGS AND SPECIFICATIONS
ASSOCIATED WITH THIS PROJECT SCOPE AND WILL NOTIFY THE PROJECT ENGINEER IN WRITING
PRIOR TO THE INITIATION OF CONSTRUCTION. IF A CONFLICT WITH THE DOCUMENTS RELATIVE
TO THE SPECIFICATIONS OR APPLICABLE CODES IS FOUND. FAILURE BY THE CONTRACTOR TO
NOTIFY THE PROJECT ENGINEER SHALL CONSTITUTE ACCEPTANCE OF FULL RESPONSIBILITY BY
THE CONTRACTOR TO COMPLETE THE SCOPE OF WORK AS DEFINED BY THE DRAWINGS AND IN
FULL CONFORMANCE WITH LOCAL REGULATIONS AND CODES.
B.
THE CONTRACTOR ACCEPTS FULL RESPONSIBILITY FOR PROPER HANDLING AND INSTALLATION
OF THE ASTS, DISPENSERS, AND ALL EQUIPMENT AND SHALL ENSURE THAT GOOD
WORKMANSHIP PRACTICES AND CONSTRUCTION PROCEDURES ARE FOLLOWED REGARDLESS
OF THE INCLUSION OR OMISSION OF ANY INSTRUCTION.
C.
UNKNOWN SITUATIONS OR CONDITIONS NOT COVERED IN THESE AND THE MANUFACTURER'S
INSTRUCTIONS ARE THE RESPONSIBILITY OF THE CONTRACTOR, REGARDLESS OF THE
PRESENCE OF THE MANUFACTURER, ENGINEER, OR OWNER AT THE INSTALLATION SITE.
D.
ABOVEGROUND TANKS MUST BE INSTALLED PER THESE SPECIFICATIONS, DRAWINGS,
MANUFACTURER'S INSTRUCTIONS, AND NFPA 30 AND 30A. ANY LOCAL CODES THAT APPLY MUST
BE FOLLOWED. FAILURE TO FOLLOW THESE INSTALLATION INSTRUCTIONS WILL VOID THE
WARRANTY AND WILL RESULT IN TANK FAILURE. PROPER INSTALLATION OF ASTS HELP PREVENT
TANK DAMAGE AND SHOULD ENSURE LONG-TERM CORROSION-PROOF SERVICE.
E.
THE INSTALLATION PROCEDURE SHALL COMPLY WITH BOTH THESE SPECIFICATIONS AND THE
RESPECTIVE TANK MANUFACTURER'S SPECIFICATIONS. IF THE CONTRACTOR FINDS A CONFLICT
IN BETWEEN THESE TWO SPECIFICATIONS, IT IS THEIR RESPONSIBILITY TO CONTACT THE
ENGINEER OF RECORD FOR CLARIFICATION AND GUIDANCE.
F.
AN INTERSTITIAL INTEGRITY TEST SHALL BE PERFORMED ON EACH DOUBLE-WALLED STORAGE
TANK WITH A CLOSED INTERSTICE AFTER IT IS DELIVERED AND PLACED AT ITS FINAL LOCATION
AT THE FACILITY, AND BEFORE THE STORAGE TANK IS PLACED INTO SERVICE. TEST SHALL BE
PERFORMED IN ACCORDANCE WITH THE MANUFACTURERS TESTING SPECIFICATIONS. TEST
RESULTS SHALL BE PROVIDED TO EOR, CLIENT, AND ENVIRONMENTAL.
G.
ALL OVERFILL PROTECTION DEVICES SHALL BE TESTED FOR OPERABILITY AT INSTALLATION AND
TEST RESULTS SHALL BE MAINTAINED AND AVAILABLE FOR INSPECTION BY THE DEPARTMENT OR
COUNTY IN ACCORDANCE WITH RULE 62-762.711, F.A.C.
H.
PRESSURIZED SMALL DIAMETER INTEGRAL PIPING SYSTEMS CONNECTED TO DISPENSERS SHALL
BE INSTALLED WITH SHEAR VALVES OR EMERGENCY SHUTOFF VALVES IN ACCORDANCE WITH
SECTION 6.3 OF NFPA 30A, CODE FOR MOTOR FUEL DISPENSING FACILITIES AND REPAIR
GARAGES, REQUIREMENTS FOR DISPENSING DEVICES, 2021 EDITION. THESE VALVES SHALL BE
DESIGNED TO CLOSE AUTOMATICALLY IF A DISPENSER IS DISPLACED FROM ITS NORMAL
POSITION. THE VALVES SHALL BE RIGIDLY ANCHORED INDEPENDENTLY OF THE DISPENSER. THE
VALVES SHALL BE TESTED IN ACCORDANCE WITH PEI/RP1200-19, 2019 EDITION, INCORPORATED
BY REFERENCE IN SUBPARAGRAPH 62-762.501(1)(B)8., F.A.C., AT THE TIME OF INSTALLATION BY A
CERTIFIED CONTRACTOR TO CONFIRM THAT THE AUTOMATIC CLOSING FUNCTION OF THE VALVE
OPERATES PROPERLY, AND THAT THE VALVE IS PROPERLY ANCHORED.
I.
RELEASE DETECTION DEVICES SHALL BE INSTALLED AND TESTED IN ACCORDANCE WITH
62-762.701(4) F.A.C.
J.
CONTRACTOR SHALL PROVIDE TANK EXCAVATION HOLE PROTECTION WHEN REMOVING
EXISTING FUEL TANKS UNTIL PAVING IS IN PLACE PER OSHA STANDARD 1910. COVERS AND / OR
GUARDRAILS SHALL BE PROVIDED TO PROTECT PERSONNEL FROM THE HAZARDS OF OPEN PITS,
TANK VATS, DITCHES, ETC.
K.
CONTRACTOR SHALL PROVIDE WRITTEN NOTIFICATION TO FDEP BETWEEN 30-45 DAYS BEFORE
INSTALLATION OF THE ABOVE GROUND STORAGE TANKS TO COMPLY WITH FAC 62-762.
L.
NOTIFICATION SHALL BE RECEIVED BY THE COUNTY IN WRITING OR ELECTRONIC FORMAT
BETWEEN 30 AND 45 DAYS BEFORE THE INITIATION OF THE WORK RELATED TO THE CLOSURE OF
THE EXISTING UNDERGROUND STORAGE TANKS.
M.
CONTRACTOR SHALL SUBMIT COMPLETED REGISTRATION FORM IN PAPER OR ELECTRONIC
FORMAT TO THE DEPARTMENT WITHIN 10 DAYS AFTER COMPLETION OF THE DEMOLITION OF THE
TWO UNDERGROUND FUEL STORAGE TANKS PER 62-762.802(3)(B)8., F.A.C. FOR CLOSURE OF
FUEL TANKS.
N.
A CLOSURE INTEGRITY EVALUATION REPORT FORM FOR ASTS 62-762.901(7), MUST BE PROVIDED
TO THE COUNTY WITH THE NOTIFICATION OF CLOSURE.
O.
CONTRACTOR SHALL TAKE FULL RESPONSIBILITY OF THE ABOVE GROUND STORAGE TANKS.
PROVIDE CERTIFICATE OF LIABILITY FOR THE TANKS UNTIL VCS TAKES OWNERSHIP.
201 N FRANKLIN ST
SUITE 1400
TAMPA, FL 33602
PHONE: 813.620.1460
REGISTRY NO. 35106
This document is an instrument of service prepared
solely for Kimley-Horn's client and for a particular
purpose. Any other use or reliance is without liability to
Kimley-Horn.
ARCH/ENGR OF RECORD
JEREMY DEMBOSKI
DESIGNED BY
JTD
ISSUE DATE
3/23/2026
DRAWN BY
SRM
AE PROJECT NUMBER
145642003
SHEET TITLE
FUEL OIL SYMBOLS,
ABBREVIATIONS, SHEET
SPECS AND NOTES
DRAWING NO.
P000
TAG
(N)AST-2
(N)AST-3
(N)AST-1
STP-1
RF-1
RF-2
VC-1
VC-2
TLS
ISENS
INT-CAP
DISP
FM
FE
PART DESCRIPTION
EQUIPMENT LIST
MANUFACTURER
TANK EQUIPMENT
MODEL NUMBER
ABOVEGROUND STORAGE TANK, U.L. 2085 LABELED - BASE BID
ABOVEGROUND STORAGE TANK, U.L. 2085 LABELED - BASE BID
ABOVEGROUND STORAGE TANK, U.L. 2085 LABELED - ADD ALTERNATE
MODERN WELDING
MODERN WELDING
MODERN WELDING
TANK SUMP EQUIPMENT
FIREGUARD, 12,000 GALLON CAPACITY
FIREGUARD, 12,500 GALLON CAPACITY
FIREGUARD, 20,000 GALLON CAPACITY
2 HP FIXED SPEED STP - STPM200-VL2-00
FACTORY INCLUDED THREADED RISER PIPE - ONE PER STP
2"x18" MxMS FIRESHILED FLEX CONNECTOR
2" FULL PORT BALL VALVE
3" FULL PORT BALL VALVE
FE PETRO
FE PETRO
HOSE MASTER
MORRISON
MORRISON
SPILL CONTAINMENT
4" VAPOR SWIVEL ADAPTOR
DURATUFF STAGE VAPOR RECOVER CAP
OPW
OPW
AST VALVES AND FITTINGS
AST PEDESTAL & 1 STABILIZER BAR; W/27.5" Lx 15" W OPENING
AST OVERFILL VALVE 3" FILL 6" INSTALLATION PIPE
SOLENOID VALVE 2" VITON WITH 120 VOLT COIL
15 GALLON REMOTE SPILL CONTAINER WITH (2) 3" OPENING
15 GALLON REMOTE SPILL CONTAINER WITH (1) 3" OPENING
3" DUCTILE IRON SWING CHECK VALVE
3" DRY BREAKS 927
DUST CAP
2" DUCTILE IRON EXTERNAL EMERGENCY VALVE
CLOCK GAUGE WITH BATTERY OPERATED OVERFILL ALARM & 2" FLOAT
2" ATMOSPHERIC VENT CAP
2" PRESSURE/VAC VENT CAP
MORRISON
MORRISON
MORRISON
MORRISON
MORRISON
MORRISON
MORRISON
MORRISON
MORRISON
MORRISON
OPW
OPW
402520901
FSMS180200
691---0800 1V
691---1000 1V
61VSA-1020-EVR
1711T-7085-EVR
434X--17001 AK
9095AA3300AVEVR
710---0200 1V
515---2300 AC
515---0300 AC
246ADI0600 AV
927---0300AAEVR
735DC-4000ACEVR
346DI-0500 AV
918---0100 AG
23-0033
623V-2203
TANK MONITORING EQUIPMENT - VEEDER ROOT TLS 4B SYSTEM
TLS4B CONSOLE, COLOR TOUCH SCREEN DISPLAY, EDIM, UL
TLS4B APPLICATION SOFTWARE, 6 UNIVERSAL INPUTS
EXTERNAL PRINTER FOR TLS4 SERIES CONSOLES (EPSON MODEL: TM-T88V)
WALL MOUNTING BRACKET FOR EXTERNAL PRINTER FOR TLS4 SERIES CONSOLES
SS PROBE, 0.2 MAG PLUS HGP CANISTER, WATER DETECTION, UL, ANY STD LENGTH
INSTALL. KIT, MAG PLUS, PHAST-TWO WATER DETECTOR, 4" FLOAT, 5' CABLE
INSTALL. KIT, MAG PLUS, DIESEL, 4" FLOAT, 5 CABLE
4" NPT RISER CAP AND RING KIT FOR IN-TANK PROBES
MAG PROBE INSTALLATION KIT FOR ABOVEGROUND STORAGE TANK
INTERSTITIAL SENSOR FOR STEEL TANKS (4'-12' TANK I.D.) WITH 16' CABLE
2" INTERSTITIAL SENSOR RISER CAP AND ADAPTOR KIT
OVERFILL ALARM BOX
OVERFILL ALARM ACKNOWLEDGEMENT SWITCH/RESET
VEEDER ROOT
VEEDER ROOT
VEEDER ROOT
VEEDER ROOT
VEEDER ROOT
VEEDER ROOT
VEEDER ROOT
VEEDER ROOT
VEEDER ROOT
VEEDER ROOT
VEEDER ROOT
VEEDER ROOT
VEEDER ROOT
860196-020
333435-001
330020-832
330020-839
846397-2xx
886100-000
846400-001
312020-952
312020-984
794390-420
312020-928
790091-001
790095-001
ISLAND EQUIPMENT
1-1/2" EMERGENCY VALVE
GASBOY ATLAS X COMMERCIAL DISPENSER - TWIN - ONE PRODUCT, FRONT LOAD
STAINLESS STEEL-ALL PANELS
PULSE OUTPUT, SINGLE OR DUAL
OPW
GASBOY
GASBOY
GASBOY
10BF-5725
9853GXTW1 DFZ
Z-AT0-ISSA00
Z-AT0-APULID
DISPENSING ACCESSORIES
3/4" DIESEL DISPENSING NOZZLE, GREEN
1" MNPT TO 3/4" FNPT BUSHING
1" CAMTWIST MAGNETIC RECONNECTABLE BREAKAWAY
KIT, GAS - 3/4" BLACK, ERGO, C720, CTM75, 9' X 8"
1" x 20' CURB HOSE
1" x 9" WHIP HOSE
360 HEAVY DUTY HIGH HOSE RETRIEVER
360 HB HOSE BUN
BASE FOR HOSE RETRIEVER
OPW
OPW
CATLOW
CATLOW
FLEXHOSE
FLEXHOSE
PEMCO
PEMCO
PEMCO
FUEL MANAGEMENT SYSTEMS
11B-0100
28R-2404
CTM-100
HAER0002
FLX HW302000
FLXHW300009
FM LIVE, CELLULAR, PROKEE/PROX. CARD READER
TANK MONITORING INTERFACE WIRELESS KIT (RS-232)
PROKEE ENCODER; USB
FMLIVE ANNUAL SUBSCRIPTION SERVICES
FMLIVE SETUP AND ACTIVATION
FMLIVE PROJECT MANAGEMENT
FMLIVE DATABASE CONSTRUCTION AND OR CONVERSION
PROKEES
FUELMASTER
FUELMASTER
FUELMASTER
FUELMASTER
FUELMASTER
FUELMASTER
FUELMASTER
FUELMASTER
MISCELLANEOUS
FMU5720-F2
191F0223
941D0120
FMLIVEBA/2+B1
CLOUDBA/2
PMLIVEBA/2+BI+CELL
FMLIVE-DB-CONSTRUCT
172405
FIRE EXTINGUISHER AND CABINET (PURPLE-K)
AST DECAL PACKAGE
DECAL PACKAGE (PUMP NUMBERS, MAY CONTAIN 10% ETHANOL, ULSD)
QUANTITY
1
1
1
3
3
3
3
2
1
1
3
3
3
1
1
3
3
3
3
3
2
1
1
1
1
1
3
1
2
3
3
3
3
1
1
3
3
3
3
4
4
4
2
4
4
4
4
4
1
1
1
1
1
1
1
300
1
1
3
201 N FRANKLIN ST
SUITE 1400
TAMPA, FL 33602
PHONE: 813.620.1460
REGISTRY NO. 35106
This document is an instrument of service prepared
solely for Kimley-Horn's client and for a particular
purpose. Any other use or reliance is without liability to
Kimley-Horn.
ARCH/ENGR OF RECORD
JEREMY DEMBOSKI
DESIGNED BY
JTD
ISSUE DATE
3/23/2026
DRAWN BY
SRM
AE PROJECT NUMBER
145642003
SHEET TITLE
FUEL OIL EQUIPMENT LIST
DRAWING NO.
P001
3/4" CW
3/4" CA
19
18
6 FE
14
INT-CAP
12
11
TLM 10
(N)AST-2
INT-CAP
12
(N)AST-3 11
TLM
9
2" FO-UL
(N)DISP-1
1
RF-1
3
(TYP.)
78
(TYP.()TYP.)
DEF-2
5
FM
(N)STP-1 13
RF-2
78
(TYP.()TYP.)
(N)DISP-1
14
16
2" FO-D
4
7
(N)DISP-1 (TYP.)
2
(TYP.)
2" FO-D
(N)STP-1 13
3
19
(TYP.)
TLM
INT-CAP
12
11
(N)AST-1
15
14
RF-2
(N)STP-1 13
20
3/4" CA
3/4" CW
TRANSPORTATION BLDG
RM 700-10
RM 700-10
TLS
NORTH
17
NEW ENLARGED PLAN
1
1/8" = 1'-0"
PIPING LEGEND
DIESEL
UNLEADED
GENERAL NOTES:
1.
ALL DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE
GENERAL EXTENT OF THE WORK. CONTRACTOR TO BE
RESPONSIBLE FOR COORDINATION WITH OTHER
TRADES BEFORE INSTALLATION OF ALL PLUMBING AND
FUEL OIL SYSTEMS. PIPING LAYOUT SHOWN ON
DRAWINGS IS FOR GENERAL ARRANGEMENT ONLY. ALL
WORK TO BE COORDINATED WITH FIELD CONDITIONS
AND OTHER TRADES INVOLVED AS REQUIRED. DO NOT
SCALE DIMENSIONS FROM THIS DRAWING. ALL
DIMENSIONS TO BE VERIFIED IN FIELD AS REQUIRED.
2.
CONTRACTOR SHALL PROVIDE ALL SUPPORTING AND
HANGING FITTINGS AND EQUIPMENT FOR PROPER
INSTALLATION OF ALL PLUMBING AND FUEL OIL
SYSTEMS.
3.
CONTRACTOR TO COORDINATE AND VERIFY ALL
CLEARANCES BEFORE START OF ANY WORK.
TANK, PIPING, AND INSTALLATION NOTES
1.
ALL NEW FUEL OIL EQUIPMENT, MATERIALS, AND ACCESSORIES SHALL BE INSTALLED AND
TESTED IN ACCORDANCE WITH APPLICABLE MANUFACTURER'S INSTRUCTIONS.
2.
ALL TANK AND PIPING INSTALLATION WORK IS TO BE PERFORMED BY A STATE REGISTERED
POLLUTANT STORAGE SPECIALTY CONTRACTOR.
3.
ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE STATE, COUNTY, AND
LOCAL REQUIREMENTS
A.
2023 FLORIDA BUILDING CODE
B.
FLORIDA DEPARTMENT OF ENVIRONMENTAL QUALITY:
a.
62-762 F.A.C. ABOVEGROUND FUEL TANK INSTALLATIONS.
C.
NATIONAL FIRE PROTECTION ASSOCIATION:
a.
30: FLAMMABLE AND COMBUSTIBLE LIQUID CODE
b.
30A: AUTOMOTIVE SERVICE STATION CODE
c.
70: NATIONAL ELECTRIC CODE
D.
AMERICAN PETROLEUIM INSTITUTE
a.
1604: CLOSURE OF UNDERGROUND PETROLEUM STORAGE TANKS
b.
334: GUIDE TO LEAK DETECTION FOR ABOVEGROUND STORAGE TANKS
c.
340: LIQUID RELEASE PREVENTION AND DETECTION MEASURES FOR
ABOVEGROUND STORAGE FACILITIES
d.
E.
PETROLEUM EQUIPMENT INSTITUTE:
a.
RP 200 INSTALLATION OF ABOVEGROUND STORAGE SYSTEMS
b.
RP 500 INSPECTION & MAINTENANCE OF MOTOR FUEL DISPENSING EQUIPMENT
c.
RP 600 OVERFILL PREVENTION FOR ASTS
F.
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION:
a.
CONSTRUCTION SAFETY AND HEALTH REGULATIONS SUBPART P, 1902.50 THRU
1926.653
G.
MANUFACTURER'S STANDARDIZATION SOCIETY
a.
MSS SP-58: PIPE HANGERS AND SUPPORTS
H.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING UNDERGROUND
UTILITIES IDENTIFICATION BY CONTACTING FL. ONE CALL (1-800-432-4770) AND
APPLICABLE MUNICIPAL JURISDICTION AT LEAST 48 HOURS PRIOR TO START OF
CONSTRUCTION.
I.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR GIVING REQUIRED NOTICE(S) AND
SCHEDULING APPLICABLE CITY, COUNTY AND / OR STATE INSPECTIONS AS REQUIRED
FOR PERMIT CLOSE OUT(S).
KEYNOTES
1 UNLEADED DOUBLE-WALLED ABOVEGROUND STORAGE TANK
2 DIESEL DOUBLE-WALLED ABOVEGROUND STORAGE TANK
3 2" SINGLE-WALLED PIPING. PIPE TO SLOPE AT A MINIMUM SLOPE OF 1/8"
PER FOOT BACK TO TANK.
4 EXISTING DISPENSER TO BE DEMOLISHED.
5 EXISTING DEF SYSTEM TO BE RELOCATED TO NEW FUEL ISLAND.
6 INSTALL NEW FIRE EXTINGUISHER
7 PAINTED CARBON STEEL PIPE TO BE SUPPORTED AT LEAST EVERY 10
FT.
8 STEEL PIPE TO BE ROUTED AT A HEIGHT BELOW THE CANOPY, 16'
CLEARANCE TO PAVEMENT.
9 ATMOSPHERIC VENT CAP
10 PRESSURE/VACUUM VENT CAP
11 EMERGENCY VENT FOR TANK SPACE
12 EMERGENCY VENT FOR INTERSTITIAL SPACE
13 SUMERSIBLE TURBINE PUMP
14 REMOTE FILL LINE, FUEL FLOWS THROUGH OVERFILL PROTECTION
VALVE, REFER TO TANK DETAIL.
15 DIESEL DOUBLE-WALLED ABOVEGROUND STORAGE TANK TO BE
REPLACED AS AN ADD-ALTERNATE.
16 EMERGENCY SHUTOFF DEVICE RELOCATED TO BE A MINIMUM OF 20'
AND A MAXIMUM OF 100' FROM THE DISPENSING EQUIPMENT. SECURE
TO 4'X4' CONCRETE POST.
17 TIE IN NEW DOMESTIC COLD WATER AND COMPRESSED AIR PIPING
INTO EXISTING PIPES IN BETWEEN TWO ROLL UP DOORS.
18 ROUTE NEW DOMESTIC COLD WATER AND COMPRESSED AIR PIPING
UNDERGROUND AROUND THE PROPOSED TANKS TO CONNECT TO NEW
HOSE BIB (ZURN MODEL Z1341 OR EQUIVALENT) AND BRASS
SLEEVE-TYPE QUICK CONNECT (WEATHERHEAD MODEL 27131613 OR
EQUIVALENT) ON NEW FUEL ISLAND. BOTH CONNECTIONS SHALL BE
MOUNTED AT 36".
19 CONTRACTOR TO LABEL CANOPY CLEARANCE HEIGHT ON THIS SIDE OF
CANOPY.
20 EXISTING FUEL ISLAND AND EQUIPMENT TO BE DEMOLISHED AFTER
COMPLETION OF NEW FUEL ISLAND.
ELECTRICAL NOTES
1.
ELECTRICAL INSTALLATION SHALL COMPLY WITH NEC 2020.
2.
N.E.C. ARTICLE 514 CONDITIONS FOR HAZARDOUS AREAS AND FUEL DISPENSING FACILITIES
APPLY.
3.
PROVIDE EXPLOSION PROOF SEAL-OFFS IN ACCORDANCE WITH ARTICLES 514.3 AND 514.9(A) &
(B) FOR ALL CONDUITS IN CLASS 1 HAZARDOUS LOCATIONS, INCLUDING LOW VOLTAGE
CONDUITS.
4.
CIRCUIT DISCONNECTS TO BE PROVIDED AS PER NEC 514.11(A) AND NEC 514.13.
5.
EXTERIOR EMERGENCY CONTROLS TO BE INSTALLED AS PER NEC 514.11(B). REFER TO
KEYNOTE #16 FOR LOCATION.
6.
ALL UNDERGROUND ELECTRICAL CONDUIT TO BE SCHEDULE 40 PVC MAY BE USED EXCEPT FOR
THE LAST 10' IN THE HAZARDOUS AREAS. PVC COATED GALVANIZED RIGID CONDUIT (GRC)
SHALL BE INSTALLED FOR THE LAST 10' ON ALL SUMP PENETRATIONS, DISPENSER STUB-UPS,
CANOPY COLUMN STUB-UPS AND BUILDING STUB-UPS AND TO BE BURIED AT MIN. 24".
7.
PROVIDE BONDING/GROUNDING OF ALL PIPING AND EQUIPMENT AS INDICATED ON THE
ELECTRICAL DRAWINGS.
FUEL OIL DESIGN SCOPE
PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT TO COMPLETE INSTALLATION OF NEW FUEL
STORAGE TANKS, PRODUCT PIPING, DISPENSERS, AND MISCELLANEOUS ACCESSORIES AS DETAILED IN
THIS PLAN SET
1.
SET TANKS, ANCHOR NEW 10.5' ø 20,000 GALLON DOUBLE WALLED DIESEL, 10.5' ' 12,500 GALLON
DOUBLE WALLED DIESEL, AND 10.5' Ø 12,000 GALLON DOUBLE WALLED UNLEADED STORAGE
TANKS. INSTALL NEW FILLS, VAPOR, VENT, TURBINE, GAUGE AND LEAK DETECTION EQUIPMENT
AND STATIC GROUNDING CONNECTIONS.
2.
TANKS, PIPING, AND ALL PETROLEUM EQUIPMENT AND ACCESSORIES TO BE PROVIDED AND
INSTALLED BY CONTRACTOR UNLESS NOTED OTHERWISE.
3.
SET NEW DISPENSER PEDESTAL BOXES PER PLAN; INSTALL NEW SINGLE-WALL PIPING FROM
NEW TANK STP'S ROUTED ABOVE NEW CANOPY, PENETRATE CANOPY, THEN ROUTED DOWN TO
EACH PEDESTAL. PIPE NEW PEDESTAL BOXES TO RECEIVE NEW DISPENSERS AND TEST.
4.
INSTALL NEW CONDUITS AND WIRING FROM TANKS AND EACH DISPENSER LOCATION. CONNECT
TO STP, DISPENSER, AND GAS EQUIPMENT CIRCUITS INSIDE BUILDING.
5.
INSTALL NEW TLS-4B TANK LEVEL GAUGES, ANNULAR SPACE SENSORS, WIRING, AND
CONNECTIONS.
6.
SET AND CONNECT THREE (3) NEW GASBOY FUEL DISPENSERS: TWIN NOZZLE, ONE-PRODUCT
DISPENSERS. INSTALL NEW HOSES, NOZZLES, BREAKAWAYS. STARTUP, PURGE, AND CALIBRATE.
7.
EMERGENCY STOP DISCONNECTS TO BE INSTALLED AT BOLLARD INDICATED ON DRAWINGS.
8.
INSTALL NEW NFPA 30A 9.2.5.4 WARNING SIGNS: "NO SMOKING, STOP MOTOR" AT EACH
DISPENSER.
9.
INSTALL NEW NFPA 5 LB 40 BC (MIN) ADA ACCSSIBLE FIRE EXTINGUISHER AT DISPENSER ISLAND.
FIRE EXTINGUISHING SYSTEMS ARE REQUIRED TO BE INSPECTED AND TAGGED BY A LICENSED
FIRE EXTINGUISHER CONTRACTOR AND MAINTAINED YEARLY.
10. NFPA SIGNAGE TO BE PROVIDED AND INSTALLED BY CONTRACTOR.
LOCAL FIRE AUTHORITY NOTES
1.
ALL WORKMANSHIP, MATERIALS, EQUIPMENT, TESTING, AND INSPECTIONS RELATED TO THE
FUEL OIL SYSTEM INSTALLATION AS DESCRIBED HERE-IN SHALL BE IN ACCORDANCE WITH:
A.
F.A.C. 62-762: ABOVEGROUND STORAGE TANK SYSTEMS
B.
NFPA 30:
FLAMMABLE AND COMBUSTIBLE LIQUID CODE
C.
NFPA 30A:
AUTOMOTIVE SERVICE STATION CODE
2.
PRIOR TO THE FINAL INSPECTION, APROVED PERMID DOCUMENTS PREPARED BY THE
CONTRACTOR MUST BE SUBMITTED TO THE LOCAL FIRE AUTHORITY'S OFFICE.
201 N FRANKLIN ST
SUITE 1400
TAMPA, FL 33602
PHONE: 813.620.1460
REGISTRY NO. 35106
This document is an instrument of service prepared
solely for Kimley-Horn's client and for a particular
purpose. Any other use or reliance is without liability to
Kimley-Horn.
ARCH/ENGR OF RECORD
JEREMY DEMBOSKI
DESIGNED BY
JTD
ISSUE DATE
3/23/2026
DRAWN BY
SRM
AE PROJECT NUMBER
145642003
SHEET TITLE
FUEL OIL NEW PLAN
DRAWING NO.
P101
(E)AST-1 9
11
3
2
(E)UST-1 9
1
3
4
(E)UST-2 9
10
(TYP.)
4
(E)DISP-1
5
6
DEF-1 7
10
(TYP.)
10
(TYP.)
13
6
5 (E)DISP-2
14
GENERAL NOTES:
1.
ALL DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE
GENERAL EXTENT OF THE WORK. CONTRACTOR TO BE
RESPONSIBLE FOR COORDINATION WITH OTHER
TRADES BEFORE INSTALLATION OF ALL PLUMBING AND
FUEL OIL SYSTEMS. PIPING LAYOUT SHOWN ON
DRAWINGS IS FOR GENERAL ARRANGEMENT ONLY. ALL
WORK TO BE COORDINATED WITH FIELD CONDITIONS
AND OTHER TRADES INVOLVED AS REQUIRED. DO NOT
SCALE DIMENSIONS FROM THIS DRAWING. ALL
DIMENSIONS TO BE VERIFIED IN FIELD AS REQUIRED.
2.
CONTRACTOR SHALL PROVIDE ALL SUPPORTING AND
HANGING FITTINGS AND EQUIPMENT FOR PROPER
INSTALLATION OF ALL PLUMBING AND FUEL OIL
SYSTEMS.
3.
CONTRACTOR TO COORDINATE AND VERIFY ALL
CLEARANCES BEFORE START OF ANY WORK.
KEYNOTES
1 EXISTING 12,500 GALLON DIESEL UST TO BE REMOVED. DIMENSIONS
ARE APPROXIMATE.
2 EXISTING 6,000 GALLON UNLEADED UST TO BE REMOVED. DIMENSIONS
ARE APPROXIMATE.
3 EXISTING PUMP SUMP TO BE DEMOLISHED WITH UST.
4 EXISTING SPILL BUCKET TO BE DEMOLISHED WITH UST.
5 EXISTING DISPENSER TO BE DEMOLISHED.
6 CANOPY COLUMN, REFER TO STRUCTURAL DRAWINGS.
7 EXISTING DEF SYSTEM TO BE RELOCATED TO NEW FUEL ISLAND.
8 EXISTING EMERGENCY FUEL SHUT OFF TO BE DEMOLISHED,
REPLACED, AND RELOCATED. REFER TO NEW PLAN
9 STORAGE TANKS SHALL BE REMOVED ACCORDING TO NFPA 30.21
INCLUDING ALL LIQUIDS AND RESIDUES SHALL BE REMOVED; THE
TANK, APPURTENANCES, AND PIPING SHALL BE PURGED OF FLAMMALE
VAPORS AND SHALL BE TESTED BY A COMBUSTIBLE GAS INDICATOR;
ALL EXPOSED PIPING, GAUGING, AND TANK FIXTURES (OTHER THAN
THE VENT) SHALL BE DISCONNECTED AND REMOVED; AND THE TANK
SHALL BE COMPLETELY FILLED WITH AN INERT SOLID MATERIAL.
10 ALL UNDERGROUND PIPING IS TO BE REMOVED AND DISPOSED OF.
11 EXISTING 20,000 GALLON ABOVEGROUND STORAGE TANK TO BE
REPLACED AS AN ADD-ALTERNATE.
12 EXISTING VEEDER-ROOT CONTROL CONSOLE MODEL TLS-350 TO BE
DEMOLISHED AND REPLACED WITH NEW SYSTEM.
13 EXISTING FUELMASTER FUEL MANAGEMENT SYSTEM TO BE
DEMOLISHED.
14 EXISTING DOMESTIC WATER AND COMPRESSED AIR PIPING TO BE
DEMOLISHED.
201 N FRANKLIN ST
SUITE 1400
TAMPA, FL 33602
PHONE: 813.620.1460
REGISTRY NO. 35106
This document is an instrument of service prepared
solely for Kimley-Horn's client and for a particular
purpose. Any other use or reliance is without liability to
Kimley-Horn.
DEMOLITION NOTES
1.
A PHASING PLAN MUST BE DEVELOPED SO THAT THE EXISTING FUELING FACILITY REMAINS
OPERATIONAL UNTIL THE NEW FUELING FACILITY HAS BEEN CONSTRUCTED, COMMISSIONED,
AND IS FULLY OPERATIONAL.
2.
COORDINATE WITH THE CLIENT PRIOR TO DEMOLISHING ANY FUEL TANK, PIPING, OR RELATED
ELEMENTS. COORDINATE WITH THE CLIENT ON THE REMOVAL AND DISPOSAL OF THE EXISTING
GAUGING SYSTEMS AND OTHER AUTOMATING EQUIPMENT WITHIN 30 DAYS OF
REMOVAL/DEMOLITION.
3.
DEFINITIONS:
A.
DEMOLISH: REMOVE IN ITS ENTIRETY
B.
SALVAGE: REMOVE AS INDICATED AND PROVIDE TO THE CLIENT. DOCUMENT THAT THE
ITEM HAS BEEN REMOVED.
4.
CONTRACTOR MUST PROVIDE EROSION CONTROL MEASURES PRIOR TO PERFORMING ANY
DEMOLITION WORK.
5.
A HAZARDOUS MATERIALS SURVEY HAS NOT BEEN CONDUCTED AS PART OF THIS DESIGN.
6.
ASSUME EXISTING TANKS AND PIPING ARE PARTIALLY FULL OF PRODUCT AND RESIDUAL
PETROLEUM WASTE. THE CONTRACTOR MUST BE RESPONSIBLE FOR THE REMOVAL,
STORAGE, TRANSPORTATION, AND PROPER DISPOSAL OF REMAINING PRODUCT IN THE TANKS
AND PIPING ONCE THEY ARE READY FOR DEMOLITION AND REMOVAL. GOOD PRODUCT
REMAINING IN THE TANK MUST BE RETURNED TO THE CLIENT FOR REUSE. CONTRACTOR
MUST ASSUME RESPONSIBILITY FOR ANY RESIDUAL OIL, WATER, SLUDGE, OR UNACCEPTABLE
PRODUCT AND MUST REMOVE, STORE, TRANSPORT, AND DISPOSED OF THIS WASTE IN
ACCORDANCE WITH APPLICABLE REQUIREMENTS.
TRANSPORTATION BLDG
RM 700-10
RM 700-10
8
12
NORTH
DEMO PLAN
1
1/8" = 1'-0"
ARCH/ENGR OF RECORD
JEREMY DEMBOSKI
DESIGNED BY
JTD
ISSUE DATE
3/23/2026
DRAWN BY
SRM
AE PROJECT NUMBER
145642003
SHEET TITLE
FUEL OIL DEMO PLAN
DRAWING NO.
PD102
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Bid Number: FB26-0107 Bid Title: RFQ Clearwell Tank Design Category: Invitation to Bid ...

City of Flagler Beach

Bid Due: 7/31/2026

...Follow AGE Fuel Tank Active Contract Opportunity Notice ID FA481926Q0057 Related Notice Department... ...

DEPT OF DEFENSE

Bid Due: 7/22/2026

...Description: TANK CLEANING SERVICES, WASTEWATER TREATMENT PLANTS, TC Department: Purchasing Buyer...

Palm Beach County

Bid Due: 5/15/2030

...Number: 26-15 Title: East Putnam Regional Water Tank Maintenance Due Date: 08-06-2026 02:00 ...

County of Putnam

Bid Due: 8/06/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.