Met-Top E Abrasive Resistant Topping Material Installation
| Location: |
Washington |
| Posted: |
Oct 11, 2024 |
| Due: |
Oct 31, 2024 |
| Agency: |
King County |
| Type of Government: |
State & Local |
| Category: |
- 53 - Hardware and Abrasives
|
| Solicitation No: |
KC001229 |
| Publication URL: |
To access bid details, please log in. |
|
|
|
|
Abstract: Construction Solicitation KC001229,4
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Title
|
Met-Top E Abrasive Resistant Topping Material Installation
|
|
Solicitation Type
|
Construction Solicitation
|
|
Status
|
Active
|
|
Buyer
|
Brian Pinney
|
|
Email
|
brian.pinney@kingcounty.gov
|
|
Synopsis
|
The work under this Contract consists of furnishing all labor, tools, equipment, materials, incidentals, superintendents, subcontractor coordination and overhead to perform tipping floor resurfacing. The Contractor will furnish all labor, materials, and equipment necessary to install 2” depth of Met-Top E abrasion resistant material as per the Technical Data Sheet directions for use in designated areas. The Contractor will supply the abrasion resistant floor topping using pre-mixed, ready to use Met-Top E, a high strength emery aggregate based topping with Bond Coat outlined in 3.b.1 that includes Metco Low-Mod Epoxy and quartz aggregate over concrete base slabs at locations indicated on the reference drawings as well as barriers to delineate work areas. The Contractor will also furnish all labor, materials, and equipment necessary to clean, wash, and prepare the existing surface before applying resurfacing material. The Contractor will also furnish all labor, materials, and equipment necessary for the curing process and saw cutting of joints after applying the resurfacing material. The contractor shall request a Metalcrete Industries technical service representative to provide on-site assistance during floor topping installation.
|
|
Addendum Description
|
Addendum 4 has been issued. Suppliers must acknowledge all addenda before submitting a response. If a supplier has already submitted a response, they MUST log into the E-Procurement Supplier Portal, acknowledge the addendum, and resubmit.
|
|
Attachments
|
|
|
KC001229-addendum-4.pdf
(355.21 KB)
|
|
|
|
KC001229-Addendum-2.pdf
(143.52 KB)
|
|
|
|
KC001229-itb-documents.zip
(5.52 MB)
|
|
|
|
KC001229-Addendum-1.pdf
(194.66 KB)
|
|
|
|
KC001229-addendum-3.pdf
(147.41 KB)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Open Date
|
10/11/24 02:39:48 PM
|
|
Close Date
|
10/31/24 01:30:59 PM
|
|
Posting Date
|
10/11/24
|
|
|
|
|
|
|
|
Pre-Bid/Proposal Conference Date
|
9/5/24 11:00:00 AM
|
|
Second Pre-Bid/Proposal Conference Date
|
|
|
Pre-Bid/Proposal Location
|
See ITB Volume 1, Section 00 10 00 for pre-bid and site tour details.
|
|
Last Date for Questions
|
10/24/24 05:00:00 PM
|
|
KC Solicitation NAICS Code(s)
|
237310;238110;238120;238140;238190;238390;238910;238990
|
|
|
|
|
|
Bid Opening Location
|
Via MS Teams - See ITB Volume 1 Section 00 10 00 for details
|
|
Small Business Requirements Apply?
|
Yes
|
|
Department
|
NATURAL RESOURCES AND PARKS
|
|
Division
|
SOLID WASTE
|
|
|
|
|
|
|
|
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
See also
...and surrounding grounds. The selected contractor shall provide all labor, supervision, equipment, tools.... ...
Quinault Indian Nation
Bid Due: 6/12/2026
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.