| Location: | Virginia |
|---|---|
| Posted: | Dec 9, 2025 |
| Due: | Dec 17, 2025 |
| Agency: | State Government of Virginia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB 106894-2 |
| Publication URL: | To access bid details, please log in. |
DOC - Architecture and Engineering -Patrick Henry Correctional Unit
Closing On: 12/17/25 2:00 PM
Time Left: 7 days, 19 hours
The project is generally described as the replacement of the facility's existing fire alarm system.
IFB Construction
Â
View Opportunity
Add to Favorites
With GovernmentContracts, you can:
...Appalachian Detention Center WWTP Upgrade 799-1844... Status: Open IFB 121652 DOC - Architecture... ...
State Government of Virginia
Bid Due: 7/15/2026
...Wise WWTP Upgrade 799-18449-002 Status: Open IFB 121654 DOC - Architecture and Engineering ...
State Government of Virginia
Bid Due: 7/15/2026
...Follow SDA Proliferated Warfighter Space Architecture (PWSA) - Systems, Technologies, and Emerging... in ...
DEPT OF DEFENSE
Bid Due: 3/03/2027
...systems integrators capable of engineering, integrating, testing, and installing the foundational... infrastructure for ...
DEPT OF DEFENSE
Bid Due: 12/08/2026