RFQ: Integrated Water and Wastewater Master Plan
Click here to view full document
Request for Qualifications Statements
Brunswick County Integrated Water and Wastewater Master Plan
Brunswick County is requesting qualifications statements from qualified engineering, environmental, and water resource firms for engineering, design, and surveying services required to provide a comprehensive Water and Wastewater Integrated Master Plan (“Master Plan”) for Brunswick County. Services will include, but are not limited to, professional engineering, drafting, consulting, project management, and master planning/digital master planning.
The primary goal of this Master Plan is to update, build upon, and integrate the separate Water and Wastewater master plans into one combined Integrated Master Plan, and to identify strategies to ensure the County’s water treatment, distribution, wastewater treatment, and collection systems can meet existing and future infrastructure requirements. The project is to develop a Master Plan that enables the County to strategically plan and budget for the future operation, maintenance, and capital improvements necessary to ensure that the County’s water supply, water treatment, distribution systems, wastewater treatment, and collection systems can meet all existing and future supply and infrastructure demands. This Master Plan shall provide long-range planning for a 20-year period. In addition, the project shall include working with the County’s potable water system hydraulic model, wastewater model, and GIS data to update and calibrate the model to reflect current conditions as well as future conditions, growth rates, and areas of anticipated concentrated growth. The Master Plan shall include a digital master plan that will be utilized by County staff as an interactive tool for review and planning considerations to facilitate changes that will occur from the time this Master Plan is developed. The final output will result in an Integrated Water and Wastewater Master Plan that accommodates anticipated growth, addresses peak demand conditions, identifies future water and wastewater system requirements for short-term, mid-term, and long-term growth, identifies and prioritizes system improvement projects over a 20-year period, and allows for interactivity from County staff to make real-time adjustments within a digital platform.
Any questions or comments shall be submitted to
For security reasons, you must enable JavaScript to view this E-mail address.
by 3:00 p.m. ET on Thursday, October 9, 2025. A copy of all questions, further clarifications, and answers will be made in the form of an addendum to this Request for Qualifications and will be provided to all known interested firms. Any addendum will also be posted to the County website. Notwithstanding the forgoing, firms will be responsible for ensuring that they have all addenda.
Firms interested in being considered for this work should submit their Statement of Qualifications to:
Post Office DeliveryHand Delivery or Alternate Shipping Service
Bobby Sweat Bobby Sweat
Brunswick County Brunswick County
Utilities Operations Center Utilities Operations Center
P.O. Box 249 250 Grey Water Road NE
Bolivia, NC 28422 Supply, NC 28462
For consideration, five (5) hard copies and one (1) electronic copy on a USB drive of the response to this Request for Qualifications must be received by the County by 3:00 p.m. ET on Thursday, October 23, 2025. Brunswick County will not be responsible for the failure of any mail or delivery service to deliver responses prior to the stated date and time. Regardless of the manner of submission, any response received after the stated date and time will not be considered. Incomplete responses or responses inconsistent with the required format may be disqualified from consideration.