RNP2025-3 Paving of Taylor Farm Parking Lot (Base Bid) and Drainage System Overflow (Alternate 1)

Location: Connecticut
Posted: Aug 6, 2025
Due: Aug 21, 2025
Agency: City of Norwalk
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: 4466
Publication URL: To access bid details, please log in.
Bid Number: 4466
Bid Title: RNP2025-3 Paving of Taylor Farm Parking Lot (Base Bid) and Drainage System Overflow (Alternate 1)
Category: Building/Road/Excavation
Status: Open
Description:

The proposed work for the Base Bid project is a pavement rehabilitation project of the existing park parking lot and a proposed extension to accommodate more visitors. This project consists of a 2" mill and overlay of the existing parking lot, resetting of existing structures as depicted, removing a portion of the existing concrete curb, installation of a new catch basin to connect to a new stormwater detention system, formation of sub-grade and 2" overlay for the proposed parking lot extension, and installation of pavement markings. Visitor access to the park must be maintained during construction.  The proposed work for the Alternate 1 project is the addition of a drainage overflow for the stormwater detention system. Click here for more information regarding this solicitation

Publication Date/Time:
8/6/2025 3:30 PM
Closing Date/Time:
8/21/2025 2:00 PM
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.