| Location: | Connecticut |
|---|---|
| Posted: | Jun 4, 2026 |
| Due: | Jul 2, 2026 |
| Agency: | Town of Beacon Falls |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 26-2 |
| Publication URL: | To access bid details, please log in. |
Project Description: ITB #26-2; STEAP Project #0006-0129; Beacon Falls is seeking bids from qualified respondents for the roadway rehabilitation of Maple Avenue, Century, and Division Street, which includes full-depth reconstruction, paving, fine milling of bituminous pavement, installation of new concrete curbing, driveway ramps, integral concrete sidewalks with concrete curbing, concrete sidewalk ramps, storm drainage modifications, sanitary sewer upgrades, and new signs and pavement markings.
Respondents must have demonstrated experience in completing similar work (as described in the contract plans, standard specifications and special provisions) and adhere to standards and requirements (State of Connecticut Department of Transportation Standard Specifications for Roads, Bridges, Facilities and Incidental Construction Form 819, with July 2025 Supplemental Specifications and all other supplements thereto, and Town of Beacon Falls
standards) typical for such work.

With GovernmentContracts, you can:
...Concrete Stair Replacement Lebanon Elementary Removal and Replacement of Concrete Stairs at Main...
State Government of Connecticut
Bid Due: 8/14/2026
...of new concrete sidewalks and sidewalk ramps, brick paver sidewalk and sidewalk ramps, ...
State Government of Connecticut
Bid Due: 7/28/2026
...: This project involves the removal of existing sidewalk and installation of new ...
City of Norwich
Bid Due: 7/31/2026
...of the facility using high-performance Post-Tensioned (PT) Concrete. Start Date : July 20, ...
State Government of Connecticut
Bid Due: 8/21/2026