| Location: | Washington |
|---|---|
| Posted: | Apr 4, 2025 |
| Due: | Apr 9, 2025 |
| Agency: | HOMELAND SECURITY, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 70Z085Q250000250 |
| Publication URL: | To access bid details, please log in. |
THIS IS TO BE AWARDED SOLE SOURCE UNLESS PROVEN OTHERWISE
Statement of Work: On-Site Deck Crane Maintenance and Troubleshooting.
The Contractor shall provide a proposal for On-Site Allied Deck Crane Training. Request Contractor provide a proposal for instructor(s) to travel and provide to HEALY and USCG HEALY Support members, classroom and hands-on instruction for (6) six students. The proposal shall include all course instruction, course materials, for student usage during the duration of the course, examinations and instructor travel costs to complete onsite instruction Onboard USCGC HEALY (WAGB-20). The travel date and instruction provided shall be from 14-18th April 2025.
References:
SG811-C5-MMC-010-589-A, Allied Crane, Telescoping Boom Pedestal Type-Model 100-55 Port and Starboard.
Winch Housing and Auxiliary Winch Housing, SG811-C5-MMC-010
The Cranesmart "LMI" System
SG811-B4-MMC-010 – Crane, Electro-Hydraulic Telescoping Boom – Model TB60-65 (Bow Crane)
SG811-B4-MMC-010-Crane, Electric-Hydraulic Telescoping Boom
Crane, Knuckleboom Primary-Model K40-55 (Starboard)
SG811-C6-MMC-010-Crane, Kuckleboom Allied Systems Single Articulating Boom Crane, Model K15-45 (Port), 01-NOV-03, SG700-AM-MMC-010 - Hydraulic Power Unit (HPU), Aft General Service
Requirements:
1. Introductions
2. Discuss hours of training with members and consensus with breaks and ground rules for discussions.
3. Introduction to Safety Precautions and Crane Limitations
4. Crane Operation
a. List the parameters that cannot be changed as per Allied Crane requirements.
5. Directional Control Valve Manifold
a. Component Break down of Main DCV and Pilot DCV.
i. Troubleshooting for DCV removal and reinstallation.
6. Load Monitoring System
7. Hydraulic Power Unit
8. Troubleshooting process and probable Hydraulic and Electrical Causes, and what tools and equipment used to correct.
9. Practical
a. Clear Alarm Faults
Period of Performance: Contractor shall complete the training course onboard USCGC HEALY within a period of (5) five days, to be determined. From 14-18th of April 2025 time frame.
Place of performance:
USCGC HEALY
Science Conference Room
1519 Alaskan Way South,
Seattle, WA, USA
98134.
LOCAL POC: Forrest J. Heath
206-217-6896

With GovernmentContracts, you can:
...Follow LGA Visual Monitoring Security Upgrades Active Contract Opportunity Notice ID W912EF26QA055... PROJECT ...
DEPT OF DEFENSE
Bid Due: 6/09/2026
...and Infiltration Corrections Project Monitoring Plan dated 2/14/2024 and the Inadvertent Discovery... Protocol ...
Oak Harbor city
Bid Due: 7/01/2026