Construction of Crosstrail Boulevard Segment C, RFQ 683888

Location: Virginia
Posted: Oct 20, 2025
Due: Nov 14, 2025
Agency: Loudoun County
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
Solicitation No: RFQ 683888
Publication URL: To access bid details, please log in.
Bid Number: RFQ 683888
Bid Title: Construction of Crosstrail Boulevard Segment C, RFQ 683888
Category: Procurement
Status: Open
Additional Status Information: Addendum #5 Acceptance date changed to November 14, 2025 issued on October 20, 2025.
Description:

The Intent of this Invitation for Bid (IFB) is for the County of Loudoun, Virginia (County) to obtain the services of a qualified General Contractor to construct Crosstrail Boulevard Segment C. Crosstrail Boulevard Segment C consists of a four (4) lane-median divided roadway connecting Sycolin Road and the Dulles Greenway. The length is approximately 2,700 linear feet and it includes a four-span bridge over the south tributary to Sycolin Creek (the “Project”). The general scope of work includes, but is not limited to, all surveying, construction layout, maintenance of traffic, earthwork (including the removal of unsuitable material), rock excavation, erosion & sediment control, other environmental controls, safety procedures, and complete compliance with all applicable permits, to include but not be limited to, Virginia Stormwater Management Program (VSMP)/Stormwater Pollution Prevention Plan (SWPPP) requirements, building trade permits, and environmental permits.

Pre-Bid Conference:

A Pre-Bid Conference will be held virtually using Microsoft Teams software on September 22, 2025 at 11:00 am for clarification of any questions on the drawings, specifications, and site conditions.

Addendum:

Addendum #1 Acceptance date changed to October 28, 2025 issued on September 29, 2025.

Addendum #2 Changes and/or Additions issued on October 2, 2025.

Addendum #3 Changes and/or Additions issued on October 10, 2025.

Addendum #4 Acceptance date changed to November 10, 2025 issued on October 14, 2025.

Addendum #5 Acceptance date changed to November 14, 2025 issued on October 20, 2025.

Publication Date/Time:
9/12/2025 9:30 AM
Publication Information:
Invitation for Bid
Closing Date/Time:
11/14/2025 4:00 PM
Addendum Date/Time:
Addendum #5 issued on October 20, 2025.
Pre-bid Meeting:
September 22, 2025 @ 11:00 am
Contact Person:
Kristy D. Varda, NIGP-CPP, CPPO, CPPB, CJP Assoc.
Please see the attached document RFQ 683888 for additional contact information.
Download Available:
See Related Documents
Business Hours:
8:30 AM to 5:00 PM
Miscellaneous:
Addendum #5 Acceptance date changed to November 14, 2025 issued on October 20, 2025.
Related Documents:
IFB 683888 (PDF)
Attachment 2 - Geotech Release Form Construction of Crosstrail Blvd Seg C (PDF)
Attachment 4 Rev to VDOT Div 1 Lump Sum (PDF)
Attachment 6 - LOUD-25-0012 (PDF)
Attachment 7 Schedule of Bid Items (XLS)
Attachment 8 Supplemental Notes RESUB (PDF)
Attachment 9 - Special Provisions (PDF)
Attachment 11 - C-104 (PDF)
Attachment 12 - C-105 (PDF)
View Solicitation Abstract (PDF)
Addendum 1 (PDF)
REVISED Attachment 7 Schedule of Bid Items (XLS)
Plan Holders List (PDF)
Addendum 2 (PDF)
Addendum 2 - Attachment 2 - Electronic Data Release Agreement (PDF)
Addendum 2 - Attachment 1 - Revised 2 Attachment 7 - Schedule of Bid Items (XLS)
Addendum 3 - Attachment 1 - Revised Summary Sheet 2L (2) (PDF)
Addendum 3 - Attachment 2 - Revised Existing Utilities and Test Holes Exhibit (PDF)
Addendum 3 - Attachment 3 - Revised Attachment 8 Dated 10.09.2025 (PDF)
Addendum 3 (PDF)
Addendum 4 (PDF)
Addendum 5 (PDF)
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...infrastructure necessary for full operational use, including pavement construction, earthwork and grading... necessary ...

Delta Airport Consultants, Inc.

Bid Due: 6/15/2026

...earthwork and most of the connecting apron for the project was completed on ...

Delta Airport Consultants, Inc.

Bid Due: 6/17/2026

...............................................................................................02055 Earthwork ..............................................................

Greene County

Bid Due: 6/10/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.