GRAND RIVER DAM AUTHORITY
RFQ/RFP# 3671
Solicitation Cover Page
1. Solicitation: 3671
2. Solicitation Issue Date: 04/13/2026
3. Brief Description of Requirement: Earthwork construction activities, in support of GRDA
excavation crew and contractors.
The Grand River Dam Authority is seeking responses for Chimney Rock Seepage Blanket
4. Response Due Date: 04/16/2026
Time: 9:00 AM Central Standard Time
5. Contracting Officer:
Name: Waylon Cook
Phone: 918-849-1154
Email: Waylon.cook@grda.com
Grand River Dam Authority is an agency of the State of Oklahoma.
GRDA Engineering & Technology Center • 9933 E 16th Street • Tulsa, Oklahoma 74128 •918-256-5545
GRAND RIVER DAM AUTHORITY
RFQ/RFP# 3671
Regular RFQ for service
This is a standard bid. Please scan and email your quote to Waylon.Cook@grda.com
The bid opening date for this RFQ is 04/13/2026. Q&A Deadline will be 4/15/2026 at 9:00 AM CST
Bidders shall submit detailed equipment and labor rate sheet, and daily and weekly rates. Rates shall
include all costs necessary to complete the work, including but not limited to labor, equipment, fuel,
maintenance, supervision, and incidental expenses.
A completed non-collusion certificate is required and must be submitted with your bid.
This form must be signed by an authorized representative of your company in the space provided in the
lower right-hand corner of this form.
MINIMUM SAFETY REQUIREMENTS
The Grand River Dam Authority (GRDA) will consider the safety records of potential contractors prior to
awarding bids on contracts. Any bid submitted must include the following documents:
The Bidder shall include the past five (5) years’ Occupational Safety and Health Administration (OSHA) 300
and OSHA 300A logs
The Bidder shall include the past five (5) years’ National Council on Compensation Insurance (NCCI) worker’s
compensation experience rating sheets
GRDA requires that Bidders answer the following questions and submit supporting documentation upon
request:
1. Does the Bidder have a written safety program?
Yes No
2. Does the Bidder conduct regular site safety inspections? Yes No
3. Does the Bidder have an active safety training program? Yes No
If any subcontractors are used, Contractor must obtain advanced GRDA approval in writing. Prior to such
approval, all subcontractors may be required to submit the documents defined in the Minimum Safety
Requirements section of this document.
The award to the successful bidder will be based on a best value bid received that meets the specifications
listed below and the requirements herein. Preference may be given to vendors that accept EPay as method
of payment if analysis estimates that such appears to result in a lower cost to GRDA. Additional payment
terms may also be taken into consideration in the analysis process.
GRDA will take into consideration past performance and ability to meet delivery deadlines in the evaluation.
Grand River Dam Authority is an agency of the State of Oklahoma.
GRDA Engineering & Technology Center • 9933 E 16th Street • Tulsa, Oklahoma 74128 •918-256-5545
GRAND RIVER DAM AUTHORITY
RFQ / RFP #
RFQ 3671
CERTIFICATE OF NON-COLLUSION AND RELATIONSHIPS
The undersigned, of lawful age, being first sworn upon oath, deposes and states as follows:
A. For purposes of competitive bids, I certify:
1. I am the duly authorized agent of
(Company Name)
the bidder submitting the competitive bid which is attached to this statement, for the purpose of certifying the facts
pertaining to the existence of collusion among bidders and between bidders and state officials or employees, as well
as facts pertaining to the giving or offering of things of value to government personnel in return for special
consideration in the letting of any contract pursuant to said bid;
2. I am fully aware of the facts and circumstances surrounding the making of the bid to which this statement is attached
and have been personally and directly involved in the proceedings leading to the submission of such bid; and
3. Neither the bidder nor anyone subject to the bidder’s direction or control, has been a party:
a. To any collusion among bidders in restraint of freedom of competition by agreement to bid at a fixed price or to
refrain from bidding;
b. To any collusion with any state official or employee as to quantity, quality or price in the prospective contract, or
as to any other terms of such prospective contract; or
c. In any discussions between bidders and any state official concerning exchange of money or other thing of value
for special consideration in connection with the prospective contract;
B. I certify, if awarded the contract, whether competitively bid or not, neither the contractor nor anyone subject to the
contractor’s direction or control has paid, given, or donated, or agreed to pay, give, or donate any officer or employee of
the State of Oklahoma any money or thing of value, either directly or indirectly, in procuring the contract to which this bid
and statement relates.
C. I certify that I have disclosed below the names of all persons and the positions they hold within their respective
companies or firms of:
1. Any partnership, joint venture or other business relationships now in effect or which existed within one (1) year
prior to the date of this statement with any architect, engineer, or other party to the project to which this bid relates;
2. Any such business relationship now in effect or which existed within the one (1) year prior to the date of this
statement between any officer or director of the bidder and any officer or director of the architectural or
engineering firm, or other party to the project to which this bid relates; or
3. If none of the above-mentioned business relationships exist, I have provided a statement to that effect.
_________________________________________________________________________________
(Names and titles of business relationships or a statement of non-existence. Use additional sheet if necessary)
D. I further certify that I have disclosed below any known business or familial relationship in effect or which existed within
one (1) year prior to the date of such statement between any officer or director of the bidding company and any employee
of the Grand River Dam Authority in accordance with 74 O.S. § 85.22C. If none of the above-mentioned relationships
exist, I have provided a statement to that effect.
__________________________________________________________________________________
(Names and description of relationship or a statement of non-existence. Use additional sheet if necessary)
I hereby swear or affirm, under penalty of perjury, that the forgoing information is true and correct.
________________________________________
Bidder Signature
________________________________________
Bidder Printed Name
________________________________________
Bidder Printed Title
________________________________________
Date