| Location: | Montana |
|---|---|
| Posted: | Mar 20, 2026 |
| Due: | Apr 6, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA462626Q0009 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Engineer, furnish, install, and test (EFI&T) a premises wiring upgrade to new plenum-rated Cat-6 and OM4 multimode (MM) fiber cabling for Building 145 (B145) at Malmstrom AFB, MT. The Cat-6 and OM4 MM fiber drop layouts are shown in Attachment A, Layout Drawings. The upgrade shall include installation and replacement of communications (comms) racks/cabinets, installation of new AC power with power distribution unit (PDU), and comms rack/cabinet grounding. The Contractor shall remove all existing outdated and abandoned-in-place (AIP) Cat-3/5 and MM fiber cabling, along with any residual materials, from the building and dispose of them accordingly.
See Attached SOO for full details.
| Mar 30, 2026 | [Solicitation (Updated)] PREMISE WIRING B145 |
| Apr 2, 2026 | [Solicitation (Updated)] PREMISE WIRING B145 |
| Apr 8, 2026 | [Solicitation (Updated)] PREMISE WIRING B145 |
| Apr 9, 2026 | [Solicitation (Updated)] PREMISE WIRING B145 |
| Apr 19, 2026 | [Solicitation (Updated)] PREMISE WIRING B145 |

With GovernmentContracts, you can: