| Location: | Utah |
|---|---|
| Posted: | Apr 4, 2025 |
| Due: | Apr 22, 2025 |
| Agency: | City of West Valley City |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | LCWTPConduit2025 |
| Publication URL: | To access bid details, please log in. |
Project Description: The purpose of this project is to investigate, trace, and document the fiber conduit layout interconnecting at least six (6) buildings within a water treatment facility campus. The consultant will identify all fiber conduits, determine the type of fiber within each conduit, and trace the fiber cable runs within and between the buildings. The consultant will then produce detailed drawings reflecting their findings.

With GovernmentContracts, you can:
...is responsible for both water supply and distribution and wastewater collection and treatment. ...
State Government of Utah
Bid Due: 11/24/2026
...membrane bioreactor wastewater treatment plant known as the Jordan Basin Water Reclamation Facility...
State Government of Utah
Bid Due: 12/10/2026