| Location: | South Carolina |
|---|---|
| Posted: | Dec 10, 2025 |
| Due: | Jan 2, 2026 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project consists of construction of roadway and bridge improvements that will be installed following the current SCDOT standard specifications and details. Proposed construction includes the clearing, grubbing and grading of approximately 23.5 acres, 1.75 linear miles of variable-lane parkway, 146 linear feet of four-lane divided bridge, installation of 36” water main, relocation and abandonment of an existing 36” water main, stormwater infrastructure and incidental construction.

With GovernmentContracts, you can:
...Follow Vegetation clearing, tree trimming, and fence line cleanup Active Contract Opportunity... 1232SA26Q0611 ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 6/15/2026
...Follow Vegetation clearing, tree trimming, and fence line cleanup Active Contract Opportunity...) for ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 6/15/2026
...Right-of-Way Clearing and Tree Trimming work as required by DPU Pre-Bid Information: A ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/21/2026
...will consist of the design, permitting, clearing, grading and construction of a single-story...
Greenwood County
Bid Due: 6/10/2026