| Location: | Ohio |
|---|---|
| Posted: | Oct 21, 2025 |
| Due: | Nov 21, 2025 |
| Agency: | VETERANS AFFAIRS, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 36C25026B0001_1 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The Contractor shall provide all tools, equipment, material, permits, labor, and supervision required to completely perform the required construction work for the Renovate the MICU & SICU Project, including prepare site for building operations including demolition and removal of existing structures, and furnish labor and materials and perform work as required by drawings and specifications.
This construction project will renovate approximately 11,000 sq. feet of the 2nd floor in the Medical Intensive Care Unit (MICU). Construction will include demolishing the existing MEP components, floors, walls, and ceilings within the MICU to update the space with a new layout, fixtures, and finishes. Included in this scope is the construction of new patient rooms, offices, a conference room, staff lounges, M/F locker rooms, a clean supply room, a pharmacy office, work areas, and a HUC station. The scope also includes the installation of a new HEPA pandemic filtration system to provide negative pressure to the newly constructed patient rooms complying with pandemic preparedness standards. The majority of the work is to take place on the 2nd floor, however, plumbing and HVAC connections will need to be made above and below the 2nd floor deck and slab, which will incorporate coordination with the services above and below the area of active construction, as well as rooftop work to install and tie into new/existing air handling equipment.
The above construction Statement of Work (SOW) constitutes a basic outline of work and in no way outlines all of the details for the construction of this project. It is recommended that a detailed inspection of the premises, drawings and specifications be initiated to determine the needs and conditions for the construction of this project.

With GovernmentContracts, you can:
...Follow B150 HVAC Repair Active Contract Opportunity Notice ID WAAR__232013 Related Notice... necessary ...
DEPT OF DEFENSE
Bid Due: 6/17/2026