| Location: | California |
|---|---|
| Posted: | Aug 26, 2025 |
| Due: | Sep 9, 2025 |
| Agency: | UCLA Capital Programs |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 943981.01 |
| Publication URL: | To access bid details, please log in. |
| Project Name | Gonda Center Deep Energy Project |
| Project Number | 943981.01 |
| Project Description |
Subject to conditions prescribed by the University of California, Los Angeles, sealed bids for a lump sum contract from prequalified bidders are invited for the following work:
This project will upgrade existing air handling units and lighting systems within the Gonda Center to reduce the building’s annual energy usage by approximately 45 percent. Most energy savings will be achieved by converting laboratory air handling units from constant-volume to variable-airflow systems. Other opportunities for energy efficiency include programming upgrades for system controls and new lighting. The Work shall include several measures. Basement-level vivarium air handling units shall be upgraded from pneumatic to direct digital control (DDC) and laboratory exhaust valves converted from constant volume to variable air volume (VAV). In laboratory spaces, occupancy sensors shall be installed to reduce air changes and exhaust controls would be modified on fume hoods. New system strategies shall reduce equipment use through control of scheduling, temperature, pumps, and start/stop optimization. Lights and lighting control improvements shall include replacing fluorescent lights with LEDs. Related scope shall include patch and paint of walls in areas impacted by the work. In locations where equipment is above the existing ceilings grids, work shall include ceiling removal and re-installation, or replacement, after work is complete. All work shall be performed in a fully operational and restricted building. Night and off-shift work will be required in sensitive areas as identified by University Representative. Contractor shall maintain building security at all times and will be responsible for furnishing access to workers and vendors for deliveries. Contractor shall include an initial air survey of as-built condition for all areas and equipment under the scope of work. TO VIEW AND DOWNLOAD ALL FURTHER INFORMATION (PREQUALIFICATION DOCUMENTS IF ANY; BIDDING DOCUMENTS; ADDENDA IF ANY; CONFERENCE/JOB WALK SIGN-IN SHEET; PLANHOLDERS LIST; PREQUALIFIED BIDDERS, IF ANY, ETC.), CLICK HERE: UCLA ONLINE PLANROOM |
| Estimated Construction Cost | $6,958,000.00 |
| LS2501 |

With GovernmentContracts, you can:
...Californians over $200 billion in energy costs. However, the realization of these projected ...
California Energy Commission
Bid Due: 7/14/2026
...GFO-25-305 - Non-Energy Impacts of Integrated Energy Retrofit Packages from the Equitable Building... ...
California Energy Commission
Bid Due: 7/10/2026