NE 122nd Avenue Improvements for Water and Sewer

Location: Washington
Posted: Jun 18, 2025
Due: Jul 8, 2025
Agency: City of Vancouver
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: ITB 25-30
Publication URL: To access bid details, please log in.
Project: NE 122nd Avenue Improvements for Water and Sewer
Ref. #: ITB 25-30
Type: ITB
Status:
Open
Open Date: Jun 18th 2025, 10:00 AM PDT
Questions Due Date: Jun 26th 2025, 5:00 PM PDT
Contact Information: Julie Denton, julie.denton@cityofvancouver.us
Close Date: Jul 8th 2025, 11:00 AM PDT

Project Description: The Contractor shall furnish and install approximately 3,018 linear feet of 8-inch ductile iron water main, 70 LF of 6-inch ductile iron water main, 30 linear feet of 4-inch ductile iron water main, fire hydrants, and other appurtenances as shown on the Plans and specified herein.
The Contractor shall also furnish and install approximately 400 lineal feet of 8-inch C900 and 362 lineal feet of 8-inch PVC gravity sewer main. The sewer will be installed within the existing City of Vancouver right-of-way, including all laterals, manholes, and all appurtenances as shown on the plans and specified herein.
The Contractor shall restore the existing pavement where trenching takes place as specified herein, and grind and replace the existing pavement outside of the trench areas where shown on the plans and specified herein.
This project was previously bid in December of 2024 but withdrawn prior to award due to concerns over ground water in this area. The plans have been revised to install the northern
portion of the sanitary sewer as C900 pipe allowing for less cover and the sewer to be installed shallower. With these adjustments the Contractor is still encouraged to perform the northern portion of the sewer work in late August or September and complete it prior to the beginning of October to minimize the possibility of encountering ground water.
The Contract Work shall be Physically Complete within 70 Working Days from the Notice to Proceed.
Engineer's Estimate - $1,300,000


Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...and/or Maintenance,Culinary Water Improvements,Dams/Reservoirs,Elevated - Ground Storage Tanks,Reservoir... , Dams/Reservoirs, Elevated - Ground ...

City of Wenatchee

Bid Due: 6/16/2026

...as the float utilities. Utility infrastructure includes dock water systems, dock fire systems, ...

Sammamish Plateau Water

Bid Due: 7/15/2026

...and will not be discriminated against on the grounds of race, color, or ...

City of Sequim

Bid Due: 6/19/2026

...as the float utilities. Utility infrastructure includes dock water systems, dock fire systems, ...

Sammamish Plateau Water

Bid Due: 7/01/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.