| Location: | Massachusetts |
|---|---|
| Posted: | Jun 18, 2025 |
| Due: | Jul 7, 2025 |
| Agency: | Town of Hingham |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | WRWS61125 |
| Publication URL: | To access bid details, please log in. |
Project ID: WRWS61125
Title: Accord Pond Pipe and Apparatus Installation
Addenda: 0
Release Date: 6/18/2025
Due Date: 7/7/2025
The Town of Hingham owns and operates (through Weir River Water System) an existing pump house for the purposes of withdrawing water from Accord Pond. The pump system itself is housed in a structure that is approximately 36’x25’ and connects to a gate house before the main intake lines extend out to the pond.
According to available records there are currently two intake lines in the pond. One is an inactive, partially buried, 10” pipe that is connected directly to the pump house and extends approximately 400 feet into the pond. The active line exits the gatehouse before extending 50 +/- feet into the pond and is a 16” Cast Iron (C.I.) pipe.

With GovernmentContracts, you can:
Header Information Bid Number: BD-27-1030-0H100-0H002-132949 Description: 612874 SHREWSBURY-WORCESTER Bridge Preservation, S-14-021=W-44-115, I-290 (EB
Commonwealth of Massachusetts
Bid Due: 10/27/2026
Header Information Bid Number: BD-27-1039-EHS01-ASHWA-133015 Description: 27EHSPMDDSIPMSRFI: RFI for an Incident Prevention Monitoring
Commonwealth of Massachusetts
Bid Due: 10/01/2026
Header Information Bid Number: BD-27-1020-DCRCU-DC250-133000 Description: FY2027 DCR Watershed System Salt Reduction Grant
Commonwealth of Massachusetts
Bid Due: 10/02/2026
Bid Title: Fiber Optic Installation Services for the Town of Wareham Category: 2026
Town of Wareham
Bid Due: 10/08/2026