| Location: | Texas |
|---|---|
| Posted: | Aug 23, 2026 |
| Due: | Aug 31, 2026 |
| Agency: | City of Kyle |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Phase 1 - Waterleaf wastewater and reclaimed water improvements
Addenda: 3
Release Date: 7/20/2026
Due Date: 8/31/2026
The work consists of improvements of wastewater and reclaimed water pipelines. This includes installation of approximately 1,85 5 LF of 30” Wastewater line via open trench , required appurtenances and connection to the existing 48” gravity wastewater influent line in the existing Wastewater Treatment Plant located east of the Waterleaf Subdivision in Kyle, Texas to the Plum Creek Tributary. Wastewater improvements will include the installation of a 12'x12' junction box, 8'x8' junction box, and 6' Dia manholes . This project also includes the installation of approximately 1,891 LF of 12” reclaimed water line via open trench , required appurtenances and connection to the existing 18” reclaimed waterline at the Wastewater Treatment Plant to the Plum Creek Tributary.

With GovernmentContracts, you can:
...) Status: Open Solicitation Number: IFB 6100 CLMC1100 Description: Lower Fort Branch Basin ...
City of Austin
Bid Due: 11/12/2026
...Bid Information Type RFP - Public - Sealed Status Issued Number RFP 03-27 ...
City of Grapevine
Bid Due: 11/19/2026
...26-31 2026 Water & Wastewater System CIP Phase 1 THE CITY OF FARMERS ...
City of Farmers Branch
Bid Due: 10/29/2026
...Project: Water, Wastewater, Stormwater, Paving, and Transportation Infrastructure Needs Assessment... Engineering and Planning ...
City of Dallas
Bid Due: 10/30/2026