RFQ 2026-0037 Forty (40) Vehicle Movement Area Transmitters (VMATs)

Location: Georgia
Posted: Sep 14, 2026
Due: Oct 15, 2026
Agency: State Government of Georgia
Type of Government: State & Local
Category:
  • V - Transportation, Travel and Relocation Services
Solicitation No: PE-33699-NONST-2026-000000138
Publication URL: To access bid details, please log in.
Event ID Event Title Government Entity Start Date (ET) End Date (ET)
PE-33699-NONST-2026-000000138 RFQ 2026-0037 Forty (40) Vehicle Movement Area Transmitters (VMATs) Savannah Airport Commission
Sep 14, 2026 @ 04:03 PM
Oct 15, 2026 @ 05:00 PM
RFQ 2026-0037 Forty (40) Vehicle Movement Area Transmitters (VMATs)

Start Date: Sep 14, 2026 @ 04:03 PM ET

End Date:
Oct 15, 2026 @ 05:00 PM ET

Event ID: PE-33699-NONST-2026-000000138
Event Type: Non-State Agency
Event Status: Open
Purchase Type: Non-State Agency
Category Type: Goods
Government Type: other
Fiscal Year: 2026
Agency Site: Link


Description


The Savannah Airport Commission hereby invites the submission of sealed bids for:

RFQ 2026-0037 Forty (40) Vehicle Movement Area Transmitters (VMATs)

Solicitation Opening Monday, September 14, 2026
Solicitation Closing Thursday, October 15, 2026

In order to provide a response to this RFQ, all respondents must first register their company through the following link: https://savannahairport.bonfirehub.com. Responses will not be accepted via email or mail. For questions regarding vendor registration or instructions on bid submissions, please contact Christy Dixon @ cdixon@flysav.com.

The Savannah Airport Commission reserves the right to reject any and all bids and waive informalities and irregularities in the bids received.

NIGP Codes
Code Description
03504 Aircraft Avionics, (Not Otherwise Classified): Navigation Instruments, Transponders, Global Position
BuyerContact:

Christy Dixon
cdixon@flysav.com

912-655-4666

Attachment Preview

REQUEST FOR QUOTATION
RFQ 2026-0037
Forty (40) Vehicle Movement Area Transmitters (VMATs)
Issuance Date: September 14, 2026
Due Date: October 15, 2026, by Close of Business (COB)
(5:00 PM EST)
Bidder must fill in the information below:
Company Name:
Address:
City/State/Zip:
Contact Name:
Title:
Contact Phone & Cell:
Fax:
Email: (Point of Contact):
All responses to this RFQ must be submitted through https://savannahairport.bonfirehub.com/,
and will not be accepted via email or mail. In order to provide a response to this RFQ, all
respondents must first register their company through the link provided above. Registration is easy
and free. Please be sure to select the NAICS codes associated with your business and/or
organization. For questions regarding vendor registration or instructions on bid response submittal,
please contact Melanie Freeman at mfreeman@flysav.com.
It is the sole responsibility of the Vendor to make sure the submitted RFQ is received on time, and
all required documents are received by the Commission. Responses via mail or email are not
acceptable.
Christy Dixon, A.A.E., NIGP-CPP
Purchasing Manager
Savannah Airport Commission
400 Airways Avenue
Savannah, GA. 31408
cdixon@flysav.com
1

1.0 INTRODUCTION
1.1 The Savannah Airport Commission ("Airport") seeks qualified contractors to furnish,
register, install, configure, test, commission, and integrate forty (40) Vehicle Movement
Area Transmitters (VMATs), consisting of thirty-eight (38) operational units and two (2)
spare units, on designated Airport-owned vehicles operating within the Airport Movement
Area.
1.2 The Contractor shall provide a complete turnkey solution, including all labor, materials,
equipment, software, registration services, activation services, testing, documentation,
training, regulatory coordination, and commissioning necessary to place the VMAT system
into full operational service.
1.3 The project shall not be considered complete until all VMATs have been installed,
registered, activated, tested, and integrated into the FAA Surface Awareness Initiative (SAI)
environment, documented, and accepted by the Airport.
1.4 The purpose of these specifications is to outline the requirements for use by the Savannah
Airport Commission. The equipment provided will be brand new, with no prior use or repair,
and must include all standard interior and exterior features and appointments listed by the
original equipment manufacturer (OEM). Additionally, the equipment must comply with all
applicable State and Federal safety and emissions regulations.
1.5 Unless otherwise stated, equipment equal to the identified brand name will be acceptable,
considering quality, workmanship, economy of operation, and suitability for the purpose
intended.
1.6 Quality Assurance Products shall be Designed, Tested, Rated, and Certified in accordance
with, and installed in compliance with all local, City, State and Federal Standards and
Codes. All equipment shall meet or exceed the said specifications. Brand identified is used
merely as a specification and not as a statement of a preference for the specific product
identified.
1.7 The bidder acknowledges and accepts that any cost incurred from the bidder's
participation in this RFQ shall be at the sole risk and responsibility of the bidder. The
Commission will award the most responsible and responsive bidder at lowest cost.
1.8 A copy of the bidder's specifications for all proposed equipment will be submitted with the
bid. The successful bidder will have parts and service support capabilities available in the
Savannah, Georgia area.
Any manufacturer's name, trade name, brand name, or model number used in these
specifications are for the purpose of describing and establishing general quality levels. Such
references are not intended to be restrictive. The bidder's response will meet or exceed all
requirements of the listed specifications. Unless otherwise stated, items equal to
the identified brand name will be acceptable, considering quality, workmanship, economy of
operation, and suitability for the purpose intended.
1.9 Pre Bid Conference: N/A
1.10 Receipt for RFQ and Addenda: All addenda associated with this RFQ will be provided through
https://savannahairport.bonfirehub.com/ by the date noted in this this document. All
questions must also be submitted through https://savannahairport.bonfirehub.com/, and
2

will not be accepted via email or mail. As required, it is the respondent's responsibility to
ensure that all addenda are acknowledged through submission of the Acknowledgement of
Addendum Form.
1.11 Except as otherwise provided herein, all responses which are incomplete or which are not in
conformance with the law, may be rejected as non responsive. Timely responses received
will be subject to applicable laws and regulations governing public disclosure. Submission to
this request indicates acceptance by the bidder of the conditions contained in this RFQ, and
the intent to enter into an Agreement with Commission.
1.12 RFQ Submittal: All responses to this RFQ must be submitted through
https://savannahairport.bonfirehub.com/, and will not be accepted via email or mail. For
questions regarding vendor registration or instructions on bid response submittal, please
contact Melanie Freeman at mfreeman@flysav.com.
1.13 RFQ Opening: The opening of this RFQ will take place at the Savannah Airport Commission.
RFQ information will not be available until after an award has been made. Once an award is
made, the awarded bidder(s) will be notified via email.
1.14 Contract Term: N/A
1.15 Force Majeure: If by reason of Force Majeure, either party hereto will be rendered unable
wholly or in part to carry out its obligations under this Agreement then such party will give
notice and full particulars of Force Majeure in writing to the other party within 30-calendar
days after occurrence of the event or cause relied upon, and the obligation of the party giving
such notice, so far as it is affected by such Force Majeure, will be suspended during the
continuance of the inability then claimed, except as hereinafter provided, but for no longer
period, and such party will endeavor to remove or overcome such inability with all
reasonable dispatch.
1.16 Certification: N/A
1.17 Prices to be Firm: Submission of prices in this RFQ will remain firm for 90 days after the
closing date of this RFQ.
1.18 Cancellation: In the event of default of the vendor/contractor, the contract (PO) may be
cancelled by SAC within (30) days written notice, unless otherwise specified. The
vendor/contractor will be given an opportunity to cure the default within the 30 day written
notice period.

1.19 Payment Terms: Payment terms are net 30 days upon receipt of goods and validation
of services by the Commission. All invoices must reference the purchase order number
and will be addressed to SAC's Accounting Department @ accountspayable@flysav.com.
The Commission will not provide prepayment for any order.
1.20 Time of Delivery: All bidders are required to specify the estimated delivery timeframe for
the equipment on the Pricing Sheet. Failure to provide an estimated delivery timeframe
may result in disqualification of the bid.
1.21 Warranty: The bidder must specify the warranty associated with the equipment, as
designated on the Pricing Sheet. Manufacturer warranty at a minimum is required.
3

1.22 Delivery Point: The specified shipping address associated with this RFQ is 640 Gulfstream
Road, Savannah, GA. 31408.
1.23 Contract PO Document: The Commission will consider its executed Purchase Order (PO) or
executed contract between the bidder and SAC as the primary and binding contract
document between SAC and the awarded bidder.
1.24 FAA Buy American Preference: The Contractor certifies that its bid/offer is in compliance
with 49 U.S.C. 50101, BABA and other related Made in America Laws, 2 U.S. statutes,
guidance, and FAA policies, which provide that Federal funds may not be obligated unless
all iron, steel and manufactured goods used in AIP funded projects are produced in the
United States, unless the Federal Aviation Administration has issued a waiver for the
product; the product is listed as an Excepted Article, Material Or Supply in Federal
Acquisition Regulation subpart 25.108; or is included in the FAA Nationwide Buy American
Waivers Issued list.
The bidder or offeror must complete and submit the certification of compliance with FAA's
Buy American Preference, BABA and Made in America laws included herein with their bid or
offer. The Airport Sponsor/Owner will reject as nonresponsive any bid or offer that does not
include a completed certification of compliance with FAA's Buy American Preference and
BABA.
The bidder or offeror certifies that all constructions materials, defined to mean an article,
material, or supply other than an item of primarily iron or steel; a manufactured product;
cement and cementitious materials; aggregates such as stone, sand, or gravel; or
aggregate binding agents or additives that are or consist primarily of: non-ferrous metals;
plastic and polymer-based products (including polyvinylchloride, composite building
materials, and polymers used in fiber optic cables); glass (including optic glass); lumber; or
drywall used in the project are manufactured in the U.S.
2.0 REQUIREMENTS FOR SUBMISSION
The Commission will award the most responsible and responsive bidder at the lowest cost.
All equipment, services, and installations shall comply with the latest editions of applicable
federal requirements and FAA guidance, including but not limited to:
* FAA Advisory Circular (AC) 150/5220-26, Vehicle Movement Area Transmitters (VMATs)
* FAA CertAlert 25-01
* FAA Program Guidance Letter (PGL) 24-01
* FAA Surface Awareness Initiative (SAI) requirements
* FCC regulations
* Manufacturer specifications and installation requirements
* Applicable federal, state, and local regulations
2.1 SCOPE OF WORK
The Savannah Hilton Head International Airport (SAV) is equipped with the FAA Surface Awareness
Initiative (SAI) system. All VMAT equipment furnished under this Contract shall be fully compatible with
and capable of operation within the Airport's FAA SAI environment. VMATs are intended to provide
vehicle position and identification information to FAA surface surveillance systems, including SAI.
4

All work performed under this Contract shall comply with applicable FAA Airport
Improvement Program (AIP) requirements, Grant Assurances, Buy America/Buy American
requirements, and all federal provisions applicable to AIP-funded projects.
A. Equipment Supply
The Contractor shall furnish:
* Thirty-eight (38) operational VMAT units meeting the requirements of FAA AC
150/5220-26 and compatible with the FAA Surface Awareness Initiative (SAI) system.
* GPS receivers, if not integral to the VMAT
* Antennas
* Antenna mounting hardware
* Wiring harnesses
* Power supplies
* Connectors
* Mounting brackets
* Required software licenses
* All components necessary for a complete and operational installation
B. Vehicle Verification and Installation
Prior to installation, the Contractor shall conduct an inventory and verification of all
Airport-designated vehicles and confirm mounting locations, power requirements,
antenna locations, and installation methods.
The Contractor shall:
* Coordinate installation schedules with Airport personnel.
* Install equipment in accordance with manufacturer recommendations.
* Ensure installations do not interfere with vehicle operations or existing
communications systems.
* Provide weather-resistant and vibration-resistant installations suitable for airport
operating environments.
* Restore vehicles to full operational status following installation.
C. System Configuration
The Contractor shall:
* Configure each VMAT for operational use.
* Configure vehicle call signs and identification parameters.
* Establish all operational settings required for FAA surveillance systems.
* Verify proper GPS performance and transmission functionality.
* Ensure equipment operates in accordance with FAA guidance and manufacturer
recommendations.
D. Registration and Regulatory Coordination
The Contractor shall provide all services necessary to register, activate, and place each
5

VMAT into operational service.
The Contractor shall:
* Coordinate with the Airport, FAA, VMAT manufacturer, and other required
stakeholders.
* Coordinate the assignment, registration, configuration, and activation of all identifiers,
call signs, addresses, codes, and operating parameters required for VMAT operation.
* Complete all registration and activation activities.
* Configure each VMAT with all assigned identifiers and operating parameters.
* Maintain records of all registrations and assigned identifiers.
* Deliver complete registration documentation to the Airport.
* Support FAA validation activities and acceptance testing.
VMAT registration, activation, and operational commissioning shall be included in the
Contractor's bid price and shall not be considered optional services.
E. Surface Awareness Initiative (SAI) Integration
The Contractor shall provide all labor, materials, equipment, coordination, testing, and
support necessary to successfully integrate all VMAT-equipped vehicles into the FAA
Surface Awareness Initiative (SAI) environment serving Savannah/Hilton Head
International Airport.
The Contractor shall:
* Coordinate with FAA personnel, Airport staff, manufacturers, and system integrators,
as necessary.
* Configure all VMATs for operation within the FAA SAI environment.
* Verify transmission of vehicle position and identification data.
* Support FAA validation and operational testing activities.
* Resolve configuration, registration, communication, display, or integration issues
identified during testing.
* Provide documentation demonstrating successful SAI integration and operational
readiness.
The Contractor shall remain responsible for correcting deficiencies identified during
testing, registration, activation, commissioning, or FAA validation activities until final
acceptance is achieved.
The Airport shall not be responsible for additional costs associated with troubleshooting,
retesting, reconfiguration, or corrective actions necessary for successful SAI integration.
VMATs support display of vehicle position and identification data within FAA surface
surveillance systems, including SAI deployments.
F. Testing and Commissioning
The Contractor shall perform:
* Power verification
* GPS functionality testing
* Transmitter functionality testing
6

* Identifier verification
* Communications verification
* Operational performance testing
* SAI integration verification
* All deficiencies identified during testing shall be corrected at no additional cost to the
Airport.
2.2 TECHNICAL REQUIREMENTS
Each VMAT shall:
* Utilize ADS-B technology.
* Operate on the FAA-approved 978 MHz Universal Access Transceiver (UAT) frequency.
* Transmit vehicle position and identification information.
* Be specifically designed for airport ground vehicle applications.
* Be compatible with FAA surface surveillance systems and SAI deployments.
Equipment shall be rated by the manufacturer for outdoor mobile vehicle service and
continuous operation in airport operating environments.
2.3 TRAINING
The Contractor shall provide training sufficient to enable Airport personnel to:
* Operate the system.
* Monitor VMAT performance.
* Manage registrations and identifiers.
* Troubleshoot common issues.
* Perform basic maintenance activities.
* Manage warranty claims.
Training materials shall be provided electronically.
2.4 DOCUMENTATION
The Contractor shall provide:
* Equipment inventory
* Vehicle assignment inventory
* VMAT serial numbers
* Assigned identifiers and call signs
* Registration records
* Configuration documentation
* Installation records
* Testing reports
* Commissioning reports
* SAI integration documentation
* Warranty documents
* Manufacturer manuals
* Training materials
7

All documentation shall be provided electronically in PDF format.
2.5 WARRANTY
The Contractor shall provide:
* Minimum one-year warranty covering equipment and workmanship.
* Manufacturer's standard equipment warranty.
* Repair or replacement of defective equipment.
* Response to warranty claims within five (5) business days.
Extended warranty options shall be proposed separately.
2.6 CONTRACTOR QUALIFICATIONS
The Contractor shall demonstrate:
* Experience installing VMAT systems, ADS-B systems, or similar aviation surveillance
systems.
* Experience working in secure airport environments.
* Knowledge of FAA airfield operations requirements.
* Successful completion of at least three similar airport VMAT, ADS-B, airfield
surveillance, or aviation communications projects within the previous five years.
2.7 DELIVERABLES AND ACCEPTANCE
The project shall not be considered complete until the Contractor has provided all of the
following:
* Thirty-eight (38) operational VMAT units installed.
* All VMATs configured and operational.
* All VMATs registered and activated.
* All required identifiers, call signs, addresses, and registration records documented
and delivered to the Airport.
* Successful completion of testing and commissioning.
* Successful integration with the FAA Surface Awareness Initiative (SAI) system serving
Savannah/Hilton Head International Airport.
* Verification by the Airport and/or FAA that VMAT-equipped vehicles are properly
displayed within the FAA Surface Awareness Initiative (SAI) environment.
* Verification that each VMAT is transmitting vehicle position and identification
information as intended.
* Completion of training.
* Delivery of all documentation.
* Written acceptance by the Airport.
Final acceptance shall not occur until all VMAT-equipped vehicles have been successfully
installed, registered, activated, tested, commissioned, and verified as operating within the
FAA Surface Awareness Initiative (SAI) environment at Savannah/Hilton Head International
Airport.
Installation of equipment alone shall not constitute project completion.
8

GENERAL REQUIREMENTS:
3.0 Terms and Conditions: By signing this document, the bidder agrees to abide by all the terms
and conditions contained in this RFQ. Any exceptions to the requirements of this RFQ, or the
SAC terms and conditions of this RFQ will be noted in writing, with detailed explanation, and
included with the RFQ submittal by using the attached exceptions sheet. The contractor
acknowledges that taking exceptions to this RFQ may subject the response submittal to be
rejected.
3.1 Cone of Silence: The bidder will not attempt to discuss any aspects of the request with any
other party except for the POC noted in this RFQ. No verbal agreements will be considered
during the bid/quote process. The Commission reserves the right to reject the bid/quote of
any bidder violating this provision.
3.2 Supplemental Agreements: The awarded contractor may enter into a separate supplemental
agreement to further define the level of service requirements over and above the minimum
defined in this contract (i.e., invoice requirements, ordering requirements, specialized
delivery, etc.). Any supplemental agreement developed as a result of this contract is
exclusively between the participating entity and contracted bidder.
3.3 Completeness: All requested information and required forms must be completed, signed,
and submitted with this document to constitute a proper bid/quote. The entire package
must be returned, complete with all required forms, signature, and information. Failure to
complete or comply with any part of the specifications or requirements in this RFQ may
constitute a basis of rejection. It is within the rights of the Commission to reject any RFQ
submittal in this solicitation document.
3.4 Broker's Clause: To be eligible for award, bidders shall be a bona fide wholesale stocking
distributor, dealer or manufacturer of the products listed in this bid, with the facilities,
personnel, and equipment to fulfill all requirements of this solicitation.
3.5 Required Forms:
(a) Local, Small Business (LSB)/Minority Business Form: Please complete the Local, Small
Business/Minority Business Form for this RFQ. If your company does not hold an LSB or
Minority Business Designation, please check the box noted as non-applicable. If your
company is an LSB/Minority Business, please complete the form, while also including
your LSB Certificate/Minority Business Certification along with the form in this section.
(b) Vendor Certification Form: Please complete the form in its entirety.
(c) Pricing Sheet: The pricing sheet must be completed in its entirety. All pricing must be
inclusive of all associated costs, including but not limited to shipping, handling, delivery,
and installation. Please provide itemized pricing and clearly indicate total lump sum
project cost. On the designated section of the pricing sheet, vendors shall provide
separate pricing for the following:
1. VMAT Equipment
2. Installation and Configuration
3. Registration and FAA Coordination
4. Testing and Commissioning
5. Training
6. Optional Extended Warranty
7. Optional Maintenance and Support
9

RFQ Opens September 14, 2026
Questions From Bidders Are Due No Later Than (NLT) 5pm on September 25, 2026
SAC Issues Last Addendum to Answered Questions (if applicable) October 2, 2026
Bidder's Final Responses Are Due to SAC COB (5:00PM EST) October 15, 2026
SAC Evaluates Responses October 16, 2026 - November 30, 2026
SAC Makes Contact With the "Successful Bidder" NLT December 1, 2026
SAC Makes Contact With the "Unsuccessful Bidder(s)" NLT December 1, 2026

1. Warranty Information: Specify the warranty coverage included with the equipment. At
a minimum, the manufacturer's minimum warranty of one (1) year.
2. Maintenance Service Location: If applicable, the Proposer shall identify the
location(s) where maintenance and/or service support will be provided. Please provide
the maintenance service location.
3. All pricing submissions must be complete, itemized, and clearly identify all applicable
costs. Incomplete, unclear, or non-itemized pricing submissions may be deemed non-
responsive and may be subject to rejection.
(d) Certification of Compliance with FAA Buy American Preference: The Bidder shall
complete, sign, and submit the Certification of Compliance with FAA Buy American
Preference form included in this solicitation. All applicable sections of the certification
must be fully completed, and the Bidder shall clearly indicate whether the proposed
equipment and/or materials comply with the applicable FAA Buy American Preference
requirements. Failure to submit a complete and signed certification may result in the
bid being deemed non-responsive.
Electronic signatures are not permitted. The certification must contain an original
handwritten (wet-ink) signature from an authorized representative of the Bidder. The
signed document may be scanned and uploaded to Bonfire as part of the electronic bid
submission.
(e) Exceptions Sheet: If there are any differences or additional requirements to the
equipment or requests for this RFQ, please be sure to list them on the Exceptions Form.
If not, please note it as non-applicable (N/A).
(f) Acknowledgement of Addenda Form: If applicable, please complete and sign the
Addendum Acknowledgement Form in its entirety. This form is only required if an
addendum has been issued in connection with this RFQ. If no addendum is issued, the
form does not need to be submitted. Do not submit your bid until the final addendum
has been issued by the Savannah Airport Commission (SAC), as noted in Section 3.6 of
this RFQ. Submitting your bid prior to the release of the final addendum may result in a
failure to acknowledge the required updates, which can render your bid non-responsive.
3.6 RFQ Procurement Schedule
RFQ Opens September 14, 2026
Questions From Bidders Are Due No Later Than (NLT) 5pm on September 25, 2026
SAC Issues Last Addendum to Answered
Questions (if applicable) October 2, 2026
Bidder's Final Responses Are Due to SAC COB (5:00PM EST) October 15, 2026
SAC Evaluates Responses October 16, 2026 - November 30, 2026
SAC Makes Contact With the "Successful
Bidder" NLT December 1, 2026
SAC Makes Contact With the
"Unsuccessful Bidder(s)" NLT December 1, 2026
3.7 Errors: Bidders or their authorized representatives are expected to fully inform themselves
as to the conditions, requirements, and specifications before submitting bids/quotes.
Bidders are cautioned not to obliterate, erase, or strike over any printed material as set
forth in this RFQ. In quoting prices, wherever the bidder has made an error and has

10

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Follow Cross Over Network Waveguide Assembly Qualification and Production (P/Ns G638416-1) Active Contract

DEPT OF DEFENSE

Bid Due: 11/18/2026

Follow Repair/Overhaul of Flat Panel Up Front Controller (FPUFC) Active Contract Opportunity Notice

DEPT OF DEFENSE

Bid Due: 11/25/2026

Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-33658-NONST-2027-000000006

State Government of Georgia

Bid Due: 11/23/2026

Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-77035-NONST-2027-000000047

State Government of Georgia

Bid Due: 11/19/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.