| Location: | Georgia |
|---|---|
| Posted: | Sep 4, 2025 |
| Due: | Oct 2, 2025 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-66972-NONST-2026-000000008 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-66972-NONST-2026-000000008 | Hwy 247C Pump Station Upgrade | Byron, City Of |
Sep 04, 2025 @ 10:25 AM
|
Oct 02, 2025 @ 11:00 AM
|
Start Date: Sep 04, 2025 @ 10:25 AM ET
End Date:
Oct 02, 2025 @ 11:00 AM ET
Separate sealed Bids for construction of Hwy 247C Lift Station Upgrades for the City of Byron will be received until Thursday, October 2, 2025 at 11:00a.m. in the City Municipal Building, 401 Main Street, Byron, GA 31008. Bids will then be publicly opened and read aloud at said office. Any bid received after Thursday, October 2, 2025 at 11:00a.m. will not be considered by the Owner. Following the closing time for the receipt of bids no bid may be withdrawn for a period of sixty (60) days.
Scope of Work: The work to be performed and provided under this Contract shall consist of furnishing all labor, materials, tools, equipment, safety equipment, permitting, erosion and sedimentation control measures, taxes, profit, overhead, and other costs and effort required to complete the following: Installation of a new wetwell with submersible pumps along with discharge piping, valving, electrical, controls, generator and ATS; cleaning and connection of existing wetwell; removal of existing pumps, piping and appurtenances; and site improvements including additional fencing and installation of gravel surface. The time allotted for final completion of work is 270 consecutive calendar days. Contractor will be required to coordinate all work with the City of Byron and other utility owners who have facilities within the project corridor. The project will be managed by GWES, LLC. located at 733 Carroll Street, Perry, GA 31069, telephone number (478) 951-5165. All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract.
Plans, Specifications and Contract Documents
The Instructions to Bidders, Bid Forms, Contract Agreement, Drawings, Specifications and forms of Bid Bond, Performance Bond, Payment Bond, and other Contract Documents may be obtained upon payment (non-refundable) of $200 from:
GWES, LLC.
William (Bill) Jones
William.jones@gwesllc.com
733 Carroll Street
Perry, GA 31069
(706) 765-8767
| Code | Description |
| 72064 | Sewage and Sludge Pumps, Submersible |
| 91345 | Construction, Sewer and Storm Drain |
Claire Swaim
claire.swaim@gwesllc.com
478-951-5165

With GovernmentContracts, you can:
.... 75035 Crushed Stone, (Includes Riprap) 77006 Aggregate, Gravel, Marble and Stone Chips, ...
State Government of Georgia
Bid Due: 6/17/2026
...and Mortar, etc. 75035 Crushed Stone, (Includes Riprap) 77006 Aggregate, Gravel, Marble and ...
State Government of Georgia
Bid Due: 6/17/2026
...Rubble Stone (Three (3) Year Multiyear Contract) NIGP Codes Code Description 75077 Sand ...
State Government of Georgia
Bid Due: 6/17/2026
...will be a gravel road on the right, approximately 1,000 feet past Lakeview ...
State Government of Georgia
Bid Due: 6/23/2026