| Location: | California |
|---|---|
| Posted: | Jun 25, 2025 |
| Due: | Jul 25, 2025 |
| Agency: | City of Compton |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The proposed work shall be performed in accordance with the plans, specifications and other contract documents as specified herein and shall consist of the following general work descriptions: construction of Cold mill, ARHM pavement, AC Base course, Aggregate Base, full depth AC slot pavement, curb and gutters, sidewalks, Cross Gutter, Alley Intersection, Driveway Approach, Curb Ramps, signing, striping, markings, and pavement legends, Speed Hump, traffic signal loop, adjust to grade existing sewer manhole, water valve, water meter, and storm drain manhole, and such other items or details, not mentioned above, that are required by the Plans and Standard Specifications. The project location will be Alameda West, Alameda East, Walnut Street, Walnut Park Way, and Walnut Park Drive.
Bid Document: 2025-PW_Specs_Annual_Residential_Street_Rehabilitation-Phase_2C_06-02-21_(2)
Bid Plans: Plans

With GovernmentContracts, you can:
...Bid Number: MB2025-ST02 Bid Title: 2026 Pavement Rehabilitation Project Category: Construction... Services Status: ...
City of Morro Bay
Bid Due: 9/29/2026
...laterals; existing manhole connections, modifications, and rehabilitation; and new manhole construction... Rehabilitation and ...
City of Pacifica
Bid Due: 10/02/2026
..., and Contract Documents. The general items of work include the trenchless rehabilitation ...
City of Thousand Oaks
Bid Due: 10/21/2026