| Location: | California |
|---|---|
| Posted: | Jun 25, 2025 |
| Due: | Jul 25, 2025 |
| Agency: | City of Compton |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The proposed work shall be performed in accordance with the plans, specifications and other contract documents as specified herein and shall consist of the following general work descriptions: construction of Cold mill, ARHM pavement, AC Base course, Aggregate Base, full depth AC slot pavement, curb and gutters, sidewalks, Cross Gutter, Alley Intersection, Driveway Approach, Curb Ramps, signing, striping, markings, and pavement legends, Speed Hump, traffic signal loop, adjust to grade existing sewer manhole, water valve, water meter, and storm drain manhole, and such other items or details, not mentioned above, that are required by the Plans and Standard Specifications. The project location will be Alameda West, Alameda East, Walnut Street, Walnut Park Way, and Walnut Park Drive.
Bid Document: 2025-PW_Specs_Annual_Residential_Street_Rehabilitation-Phase_2C_06-02-21_(2)
Bid Plans: Plans

With GovernmentContracts, you can:
...Project ID: IFB No. PW-0300 Title: Laurent St Sewer Rehabilitation Addenda: 0 Release ...
City of Santa Cruz
Bid Due: 6/16/2026
...Project ID: 25-110-RFP Title: Bryte Sewer Pump Station Rehabilitation Addenda: 1 Release Date: ...
City of West Sacramento
Bid Due: 6/25/2026
...Rehabilitation, Project No. UW18030 Replace approximately 2,560 LF of 24" diameter sewer line ...
City of Stockton
Bid Due: 7/09/2026
...includes the rehabilitation of 3,900 feet of 18-inch to 45-inch sewer, rehabilitation of ...
Orange County Sanitation District
Bid Due: 7/31/2026