DCSD27-010 Turner Middle School HVAC Modifications and Reroofing

Location: Georgia
Posted: Oct 9, 2026
Due: Nov 9, 2026
Agency: State Government of Georgia
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: PE-64810-NONST-2027-000000055
Publication URL: To access bid details, please log in.
Event ID Event Title Government Entity Start Date (ET) End Date (ET)
PE-64810-NONST-2027-000000055 DCSD27-010 Turner Middle School HVAC Modifications and Reroofing Douglas County Board Of Education
Oct 09, 2026 @ 02:45 PM
Nov 09, 2026 @ 02:00 PM
DCSD27-010 Turner Middle School HVAC Modifications and Reroofing

Start Date: Oct 09, 2026 @ 02:45 PM ET

End Date:
Nov 09, 2026 @ 02:00 PM ET

Event ID: PE-64810-NONST-2027-000000055
Event Type: Non-State Agency
Event Status: Open
Purchase Type: Non-State Agency
Category Type: Construction / Public Works
Government Type: K-12
Fiscal Year: 2027
Agency Site: Link


Description


The Douglas County School District has issued RFP 27-010 Turner Middle School - HVAC Modifications and Reroofing. All solicitation documents can be downloaded from the DCSD Euna/Bonfire portal. Thank you.

NIGP Codes
Code Description
91066 Roofing, Gutters, and Downspouts Maintenance and Repair Services
91450 Heating, Ventilating and Air Conditioning (HVAC)
91473 Roofing and Siding
90927 Building Construction, Educational
92544 General Construction: Management, Scheduling, Cost Estimation Engineering
95826 Construction Management Services
BuyerContact:

BECKY EIGEL
becky.eigel@dcssga.org

770-651-2376

Attachment Preview

PROJECT INFORMATION
SA&E PROJECT NUMBER: 01-782-168 BID PACKAGE: BP#1 ISSUED FOR CONSTRUCTION: 10-06-2026
PROJECT DESCRIPTION
FACILITY DESCRIPTION: * THIS IS EXISTING FACILITY CONSISTING OF MULTIPLE BUILDINGS. SCOPE OF WORK DESCRIPTION: WORK IN THIS PROJECT INCLUDES, BUT IS NOT LIMITED TO: * RENOVATION OF ALL EXISTING ROOFS * RENOVATION OF EXISTING HVAC SYSTEM CONSTRUCTION DELIVERY METHOD: COMPETITIVE SEALED PROPOSAL PHASING: * PROJECT CONSISTS OF SINGLE BID PACKAGE. * WORK SHALL BE CONDUCTED IN SINGLE PHASE.
LIST OF DRAWINGS
SHEET NUMBER SHEET NAME GENERAL G001 COVER SHEET ARCHITECTURAL A100 OVERALL FLOOR PLAN - DEMOLITION AND RENOVATION A101 FLOOR PLAN - WING A - DEMOLITION AND RENOVATION A102 REFLECTED CEILING PLAN - WING A A103 FLOOR PLAN - WING B & C - DEMOLITION AND RENOVATION A104 REFLECTED CEILING PLAN - WING B & C A105 FLOOR PLAN - WING D - DEMOLITION AND RENOVATION A106 REFLECTED CEILING PLAN - WING D A107 PARTIAL ROOF PLAN/ ROOF DETAILS - SECTION 1 A108 PARTIAL ROOF PLAN/ ROOF DETAILS - SECTION 2 A600 FINISH SCHEDULE STRUCTURAL S001 COMPONENTS & CLADDING WIND PRESSURE PLAN PLUMBING P101 PLUMBING DEMOLITION PLAN - ROOF P102 PLUMBING RENOVATION PLAN - ROOF P501 PLUMBING DETAILS & SCHEDULES MECHANICAL M001 MECHANICAL LEGEND, ABBREVIATIONS, AND OVERALL VIEW M101 MECHANICAL DEMOLITION PLAN - WING A M102 MECHANICAL DEMOLITION PLAN - WING A ROOF M103 MECHANICAL DEMOLITION PLAN - WING B M104 MECHANICAL DEMOLITION PLAN - WING C M105 MECHANICAL DEMOLITION PLAN - WING C ROOF M106 MECHANICAL DEMOLITION PLAN - WING D M107 MECHANICAL DEMOLITION PLAN - WING D ROOF M108 MECHANICAL RENOVATION PLAN - WING A M109 MECHANICAL RENOVATION PLAN - WING A ROOF M110 MECHANICAL RENOVATION PLAN - WING B M111 MECHANICAL RENOVATION PLAN - WING C M112 MECHANICAL RENOVATION PLAN - WING C ROOF M113 MECHANICAL RENOVATION PLAN - WING D M114 MECHANICAL RENOVATION PLAN - WING D ROOF M501 MECHANICAL EQUIPMENT DETAILS M502 MECHANICAL EQUIPMENT DETAILS M601 MECHANICAL EQUIPMENT SCHEDULES M701 MECHANICAL CONTROL SCHEMATICS ELECTRICAL E001 LEGEND & MECHANICAL EQUIPMENT CONNECTION SCHEDULE E101 ELECTRICAL DEMOLITION PLAN E102 ELECTRICAL DEMOLITION PLAN - ROOF E103 WING A1 - ELECTRICAL RENOVATION PLAN E104 WING A2 & WING B - ELECTRICAL RENOVATION PLAN E105 WING C - ELECTRICAL RENOVATION PLAN E106 WING D - ELECTRICAL RENOVATION PLAN E107 WING A1 - ROOF - ELECTRICAL RENOVATION PLAN E108 WING A2 & WING B - ROOF - ELECTRICAL RENOVATION PLAN E109 WING C - ROOF - ELECTRICAL RENOVATION PLAN E501 DETAILS E601 RISER DIAGRAMS E602 PANELBOARD SCHEDULES
SHEET NUMBER SHEET NAME
GENERAL
G001 COVER SHEET
ARCHITECTURAL
A100 OVERALL FLOOR PLAN - DEMOLITION AND RENOVATION
A101 FLOOR PLAN - WING A - DEMOLITION AND RENOVATION
A102 REFLECTED CEILING PLAN - WING A
A103 FLOOR PLAN - WING B & C - DEMOLITION AND RENOVATION
A104 REFLECTED CEILING PLAN - WING B & C
A105 FLOOR PLAN - WING D - DEMOLITION AND RENOVATION
A106 REFLECTED CEILING PLAN - WING D
A107 PARTIAL ROOF PLAN/ ROOF DETAILS - SECTION 1
A108 PARTIAL ROOF PLAN/ ROOF DETAILS - SECTION 2
A600 FINISH SCHEDULE
STRUCTURAL
S001 COMPONENTS & CLADDING WIND PRESSURE PLAN
PLUMBING
P101 PLUMBING DEMOLITION PLAN - ROOF
P102 PLUMBING RENOVATION PLAN - ROOF
P501 PLUMBING DETAILS & SCHEDULES
MECHANICAL
M001 MECHANICAL LEGEND, ABBREVIATIONS, AND OVERALL VIEW
M101 MECHANICAL DEMOLITION PLAN - WING A
M102 MECHANICAL DEMOLITION PLAN - WING A ROOF
M103 MECHANICAL DEMOLITION PLAN - WING B
M104 MECHANICAL DEMOLITION PLAN - WING C
M105 MECHANICAL DEMOLITION PLAN - WING C ROOF
M106 MECHANICAL DEMOLITION PLAN - WING D
M107 MECHANICAL DEMOLITION PLAN - WING D ROOF
M108 MECHANICAL RENOVATION PLAN - WING A
M109 MECHANICAL RENOVATION PLAN - WING A ROOF
M110 MECHANICAL RENOVATION PLAN - WING B
M111 MECHANICAL RENOVATION PLAN - WING C
M112 MECHANICAL RENOVATION PLAN - WING C ROOF
M113 MECHANICAL RENOVATION PLAN - WING D
M114 MECHANICAL RENOVATION PLAN - WING D ROOF
M501 MECHANICAL EQUIPMENT DETAILS
M502 MECHANICAL EQUIPMENT DETAILS
M601 MECHANICAL EQUIPMENT SCHEDULES
M701 MECHANICAL CONTROL SCHEMATICS
ELECTRICAL
E001 LEGEND & MECHANICAL EQUIPMENT CONNECTION SCHEDULE
E101 ELECTRICAL DEMOLITION PLAN
E102 ELECTRICAL DEMOLITION PLAN - ROOF
E103 WING A1 - ELECTRICAL RENOVATION PLAN
E104 WING A2 & WING B - ELECTRICAL RENOVATION PLAN
E105 WING C - ELECTRICAL RENOVATION PLAN
E106 WING D - ELECTRICAL RENOVATION PLAN
E107 WING A1 - ROOF - ELECTRICAL RENOVATION PLAN
E108 WING A2 & WING B - ROOF - ELECTRICAL RENOVATION PLAN
E109 WING C - ROOF - ELECTRICAL RENOVATION PLAN
E501 DETAILS
E601 RISER DIAGRAMS
E602 PANELBOARD SCHEDULES
31 10 00 Site Clearing
31 20 00 Earth Moving
A Subgrade
B Drainage Course
32 18 23 Athletic Surfacing & Paving (Polyurethane)
32 18 25 Athletic Surfacing & Paving (Latex)
32 12 16 Asphalt Paving
32 13 13 Concrete Paving
32 13 13 Tennis Court Paving & Surfacing
32 14 00 Unit Pavers
32 31 13 Chain Link Fences & Gates
32 32 23 Segmental Retaining Walls
33 41 00 Storm Utility Drainage Piping
33 46 00 Subdrainage
A Drainage Pipe & Fittings
B Drainage Fill
03 30 00 Cast-In-Place Concrete
A Concrete
B Steel Reinforcement
C Welded Wire Fabric
D Vapor Barrier
E Bond-Breaker Strips
03 35 43 Polished Concrete Finishing
03 41 00 Plant Precast Structural Concrete
03 45 00 Precast Architectural Concrete
03 51 13 Cementitious Wood-Fiber Decks
03 52 16 Lightweight Insulating Concrete
04 20 00 Unit Masonry
A Face Brick
B Concrete Block
C Mortar & Grout
D Masonry Joint Reinforcement
E Ties & Anchors
F Embedded Flashing
G Masonry Weeps
H Cavity Drainage Material
04 23 00 Glass Unit Masonry
04 72 00 Cast Stone Masonry
04 73 00 Stone Veneer
05 12 00 Structural Steel Framing
05 21 00 Steel Joist Framing
05 31 00 Steel Deck
05 40 00 Cold-Formed Metal Framing
05 50 00 Metal Fabrications
A Steel Ladder
B Ladder Safety Cage
C Steel Ship's Ladder
D Loose Bearing & Leveling Plates
E Loose Steel Lintels
F Shelf Angles
G Strut System Channel Framing
H Miscellaneous Steel Framing
J Loading Dock Edge Angle
K Metal Floor Plate & Support Frame
L Pipe Bollard
M Cast Nosing, Treads & Threshold
N Student Toilet Tissue Dispenser
05 51 00 Metal Stairs
A Stair Framing
B Metal Risers
C Metal Subtreads
05 52 13 Pipe & Tube Railing
05 71 13 Fabricated Metal Spiral Stairs
06 10 53 Miscellaneous Rough Carpentry
A Wood Nailers & Blocking
06 15 33 Wood Patio Decking
06 16 00 Sheathing
A Plywood Sheathing
B Oriented Strand Board Sheathing
C Glass-Mat Gypsum Sheathing
D Cementitious Tile Backer Units
E Composite Nail Base Insulated Sheathing
06 20 13 Exterior Finish Carpentry
06 20 23 Interior Finish Carpentry
06 41 13 Wood Veneer Faced Cabinets
A Cabinet Materials
1 Solid Hardwood Lumber
2 Particleboard
3 Softwood Exterior Grade Plywood
4 Hardwood Plywood
5 High-Pressure Laminate
6 Solid-Surfacing Material
B Hardware & Accessories
1 Knobs & Pulls
2 Drawer & Door Locks
3 Shelf Standards & Supports
06 41 16 Plastic Laminate Faced Cabinets
A Cabinet Materials
1 Solid Hardwood Lumber
2 Particleboard
3 Softwood Exterior Grade Plywood
4 Hardwood Plywood
5 High-Pressure Laminate
6 Solid-Surfacing Material
B Hardware & Accessories
1 Knobs & Pulls
2 Drawer & Door Locks
3 Shelf Standards & Supports
06 64 00 Plastic Paneling
06 82 00 Exterior Architectural Fiberglass
07 11 13 Bituminous Dampproofing
07 13 26 Sheet Waterproofing
A Vertical Surface
B Horizontal Surface
07 14 16 PMMA Waterproofing & Traffic Coating
07 18 00 Traffic Coatings
07 21 00 Thermal Insulation
A Extruded Polystyrene Board
B Foil-faced Polyisocyanurate Board
C Unfaced Glass-Fiber Blankets
D Kraft Faced Glass-Fiber Blankets
E Sound Attenuation Blankets
F Mineral Wool Blankets
G Spray Polyurethane Foam
H Self-Adhering Sheet Air Barrier
07 24 13 Polymer Based EIFS
07 24 19 Water Drainage EIFS
07 25 00 Weather Barriers
07 31 13 Asphalt Shingles
07 41 13 Standing Seam Metal Roof
A Roof Panels
B Flashing & Trim
C Ridge & Rake Cap
D Gutter
E Downspout
F Roof Curb
G Extruded Polystyrene Board Insulation
H Underlayment Material
07 42 13 13 Formed Metal Wall Panels
07 42 13 19 Insulated Metal Wall Panels
07 42 13 23 Metal Composite Material Wall Panels
07 42 17 Metal Soffit Panels
07 46 46 01 Fiber-Cement Siding
07 46 46 Fiber-Cement Siding Panels
07 52 16 SBS Modified Bituminous Membrane Roofing
A Modified Bituminous Membrane Sheet
B Substrate Board
C Insulation Board
D Cover Board
E Flashing Membrane
F Walkway Pads
07 53 23 Adhered EPDM Roofing
A EPDM Membrane Sheet
B Substrate Board
C Insulation Board
D Cover Board
E Flashing Membrane
F Walkway Pads
07 54 19 Polyvinyl-Chloride (PVC) Roofing
A PVC Membrane Sheet
B Substrate Board
C Insulation Board
D Cover Board
E Flashing Membrane
F Walkway Pads
07 54 21 Polyvinyl-Chloride (PVC) Recover-Retrofit
A PVC Membrane Sheet
B Substrate Board
C Insulation Board
D Cover Board
E Flashing Membrane
F Walkway Pads
07 54 23 TPO Roofing
A TPO Membrane Sheet
B Substrate Board
C Insulation Board
D Cover Board
E Flashing Membrane
F Walkway Pads
07 54 23 TPO Retrofit Roofing
A TPO Membrane Sheet
B Substrate Board
C Insulation Board
D Cover Board
E Flashing Membrane
F Walkway Pads
07 62 00 Sheet Metal Flashing & Trim
A Base Flashing
B Roof Penetration Flashing
C Cavity Wall & Rain Screen Wall Flashing
D Equipment Support Flashing
E Safety Pans
F Underlayment Material
07 71 00 Roof Specialties -Coated Steel
A Copings
B Roof Edge Flashings
C Gutters
D Downspouts
E Scuppers
F Conductor Heads
G Reglets
H Counterflashing
J Underlayment Material
07 71 29 Manufactured Roof Expansion Joints
A Bellows-Type Roof Expansion Joint
B Aluminum Roof Expansion Joints
07 72 00 Roof Accessories
A Roof Curb
B Equipment Support
C Roof Hutch
D Pre-Formed Flashing Sleeve
E Fall Protection Safety Rail System
07 81 00 Applied Fireproofing
07 84 13 Penetration Firestopping
07 84 46 Fire Resistive Joint System
07 92 00 Joint Sealants
07 95 00 Expansion Control
A Pedestrian Traffic Joints
B Wall Joints
C Ceiling Joints
08 11 13 Hollow Metal
08 14 16 Flush Wood Doors
08 31 13 Access Doors & Frames
08 32 10 .13 Solid FRP Doors & Frames
08 32 10 Hybrid FRP Doors
08 32 13 Sliding Aluminum-Framed Glass Doors
08 32 17 Folding Aluminum-Framed Glass Doors
08 33 13 Coiling Counter Doors
08 33 23 Overhead Coiling Doors
08 33 26 Overhead Coiling Grilles
08 34 73 Sound Control Door Assemblies
08 36 13 Electrically Operated Sectional Doors
08 41 13 Alum Entrances & Storefronts
08 42 26 All Glass Entrances
08 44 13 Alum Curtain Wall
08 45 13 Polycarbonate Panels
08 45 23 Fiberglass Sandwich Panel Assemblies
08 51 13 Aluminum Windows
08 51 23 Steel Windows
08 52 00 Wood Windows
08 71 00 Door Hardware
08 80 00 Glazing
08 84 00 Plastic Glazing
08 90 00 Louvers & Vents
09 21 16 .23 Shaft Wall Assemblies
09 22 16 Non-Structural Metal Framing
A Steel Studs & Runners
B Channel Bridging
C Furring Channel
D Ceiling & Soffit Framing
09 29 00 Gypsum Board
A Interior Gypsum Board
B Exterior Gypsum Board
C Ceiling & Soffit Framing
09 30 13 Ceramic Tile
09 51 13 Acoustical Panel Ceilings
09 62 29 Cork Flooring
09 64 66 Wood Athletic Flooring
09 65 13 Resilient Base & Accessories
09 65 16 Resilient Sheet Flooring
09 65 19 Resilient Tile Flooring
09 65 43 Linoleum Flooring
09 65 66 Resilient Athletic Flooring
09 66 13 Portland Cement Terrazzo Flooring
09 66 14 Restoration of Portland Cement Terrazzo Flooring
09 66 23 .16 Precast Portland Cement Terrazzo Stairs
09 66 23 Resinous Matrix Terrazzo Flooring
09 67 23 Resinous Flooring
09 68 13 Tile Carpeting
09 68 16 Sheet Carpeting
09 72 00 Wall Covering
09 77 23 Fabric Wrapped Panels
09 84 72 Sound Absorptive Ceiling Canopies
09 91 13 Exterior Painting
09 91 14 Exterior Re-Painting
09 91 23 Interior Painting
09 91 24 Interior Re-Painting
10 11 00 Visual Display Units
A Porcelain Enamel Markerboards
B Vinyl Fabric Faced Cork Tackboards
C Tackable Display Rails
10 14 16 Plaques
10 14 19 Dimensional Letter Signage
10 14 23 Panel Signage
10 14 26 Message Boards
10 21 13 .16 Plastic-Laminate-Clad Toilet Compartments
10 21 13 .17 Phenolic-Core Toilet Compartments
10 21 13 .19 Plastic Toilet Compartments
10 21 13 .24 FRP Toilet Compartments
10 21 23 Cubicles
10 22 33 Accordion Folding Partitions
10 22 39 Folding Panel Partitions
10 28 00 Toilet & Bath Accessories
A Paper Towel Dispenser
B Soap Dispenser
C Framed Mirrors
D Toilet Tissue Dispenser
E Grab Bars
F Shower Rod
G Shower Curtain & Hooks
H Towel Bar
J Soap Dish
K Handicapped Shower & Tub Seat
L Mop & Broom Holder
M Electric Hand Dryer
N Surface Mounted Sanitary Napkin Disposal
P Surface Mounted Diaper Changing Station
10 44 16 Fire Extinguishers & Cabinets
A Portable Fire Extinguishers
B Fire Extinguishers Cabinet
1 Semi -Recessed
2 Surface Mounted
10 51 13 Lockers
A Corridor Lockers
B Kitchen Lockers
C P.E. Lockers
D Athletic Lockers
E Locker Room Benches
10 56 13 Metal Storage Shelving
A Post & Shelf Storage Units
B Prefabricated Coat Rack
10 56 26 Mobile Storage Shelving
10 73 10 Walkway & Canopy Covers
10 73 13 Fabric Awnings
10 73 43 Fabricated Shelters
10 75 16 Ground-Set Flagpoles
10 83 16 Banners
11 12 00 Parking Control Equipment
11 13 13 Loading Dock Bumpers
11 31 00 Residential Appliances
11 31 13 Commercial Appliances
11 40 00 Foodservice Equipment
11 51 23 Library Stack Systems
11 52 13 Projection Screens
11 52 23 Motorized Projector Lifts
11 53 13 Laboratory Fume Hoods
11 61 43 Stage Curtains
11 61 23 Folding & Portable Stages
11 61 43 Stage Curtains
11 61 73 Theater Rigging Systems
11 66 13 Artroom Equipment
11 66 23 Athletic Equipment
A Basketball Equipment
B Volleyball Equipment
C Safety Pads
D Divider Curtain
11 66 40 Athletic Scoreboards
12 21 13 Horizontal Louver Blinds
12 21 16 Vertical Louver Blinds
12 24 13 Roller Window Shades
12 32 00 Wood Library Casework
12 32 13 Display Casework
12 35 53 .16 Plastic Laminate Clad Laboratory Casework
12 35 53 .19 Wood Laboratory Casework
12 48 13 Entrance Mats & Frames
12 48 16 Entrance Floor Grilles
12 61 00 Fixed Audience Seating
12 66 00 Telescoping Stands
12 76 00 Grandstands
13 34 12 Greenhouses
13 34 19 Metal Building Systems
A Primary Framing
B End Wall Framing
C Secondary Framing
1 Purlins
2 Girts
3 Eave Struts
D Canopy Framing
E Roof Panels
1 Thermal Spacer Block
2 Backing Plate
F Wall Panels
G Wall Liner Panels
H Soffit Panels
J Accessories
1 Flashing & Trim
2 Ridge & Rake Cap
3 Gutter
4 Downspout
5 Roof Curb
6 Closures
7 Pipe Flashing
8 Cont. Eave Vent
K Vinyl Faced Glass-Fiber Blanket Insulation
L Extruded Polystyrene Board Insulation
M Underlayment Material
13 34 21 Metal Over Metal Retrofit Roof Systems
14 21 00 Electric Traction Elevators
14 24 00 Hydraulic Elevators
14 26 00 Limited Use -Limited Application Elevators
14 42 00 Wheelchair Lifts
PROJECT TITLE
REROOF AND HVAC RENOVATION FOR: TURNER MIDDLE SCHOOL 7101 TURNER DRIVE, LITHIA SPRINGS, GA 30122 FOR: DOUGLAS COUNTY SCHOOLS 11490 VETERANS MEMORIAL HWY, DOUGLASVILLE, GA 30134 FACILITY CODE NUMBER: 648-2054 PROJECT FUNDING : FY 2026 / LOCAL
LOCATION MAP
FACILITY INFORMATION
FACILITY FULL TIME ENROLLMENT (FTE) : EXISTING: 625 FACILITY NUMBER OF INSTRUCTIONAL UNITS: EXISTING : 40 SQUARE FOOTAGE: 94,725 S.F. WING "A1" ...........................................................13,027 S.F. WING "A2" ...........................................................22,815 S.F. WING "B" .............................................................11,476 S.F. WING "C1" .............................................................8,408 S.F. WING "C2" .............................................................7,662 S.F. WING "D MAIN" ...................................................16,933 S.F. WING "D LOWER"................................................14,404 S.F. NEW ADDITION BUILDING CODE CLASSIFICATIONS: TYPE OF OCCUPANCY (ACADEMIC BUILDINGS) : ...............EDUCATIONAL TYPE OF OCCUPANCY (GYMNASIUM BUILDING): ...............ASSEMBLY TYPE OF CONSTRUCTION: ....................................................IBC-IIB NFPA-II (000) BUILDING PROTECTION: ........................................................NOT SPRINKLERED TOTAL OCCUPANT LOAD: ......................................................UNCHANGED
CODES
DESIGNED IN ACCORDANCE WITH THE FOLLOWING CODES: GENERAL: FIRE PROTECTION SYSTEM: International Building, Code 2024 Edition Fire Protection Equipment List Published by Underwriters with Georgia Amendments. Laboratories. International Fire Code, 2024 Edition NFPA-24 Installation of Private Fire Service Mains & with Georgia Amendments. the Appurtences, 2025 Edition. International Energy Conservation Code, 2015 Edition NFPA-13 Installation of Sprinkler Systems, 2022 Edition. with Georgia Amendments. National Fire Protection Association Publication PLUMBING: Number 101 (Life Safety Code), 2024 Edition. International Plumbing Code, 2024 Edition National Fire Protection Association NFPA 13. with Georgia Amendments. National Fire Protection Association NFPA 24. International Fuel Gas Code, 2024 Edition National Fire Protection Association NFPA 70, with Georgia Amendments. 2023 Edition L. P. Gas Code - GA 120-3-16 Rules & Reg. for LP Gases National Fire Protection Association NFPA 72, 2022 Ed. State of Georgia "Rules of Safety Fire HEATING, VENTILATION, & AIR CONDITIONING: Commissionery Chapter 120-3-3". International Mechanical Code, 2024 Edition. State of Georgia Department of Education Air Conditioning & Ventilating Systems- NFPA Standard "Regulations & Procedures". 90A, 2024 edition. 2010 ADA Standards For Accessibe Design (120.3-20A). HVAC Duct Construction Standards Metal & Flexible, ANSI A117.1 Providing accessibility & 4th. Edition 2006, Published by SMACNA. usability for physically handicapped people. Fire, Smoke & Radiation Damper Installation Guide, Local & State Codes or Regulations. 5th. Edition 2002, Published by SMACNA. Vapor Removal from Cooking Equipment - NFPA Standard STRUCTURAL: 96, 2024 Edition. American Institute of Steel Construction, AISC 15 Edition (ANSI/AISC 360-16) ELECTRICAL GENERAL: American Concrete Institute, ACI 318-14 (most recent edition, unless noted): Steel Joist Institute, SJI 100-15 Building Code Requirement for Concrete Masonry NFPA 70 (National Electrical Code), 2023 Edition Structures, TMS 402/602-16 NFPA 72, (National Fire Alarm Code) 2022 Edition, ASCE 7-16 Minimum Design Loads for Buildings & with Georgia Amendments. Other Structures NFPA 37, (Standard for the Installation & Use of Stationary Combustion Engines & Gas Turbines) MECHANICAL GENERAL: NFPA 780, 2023 Edition (Lightning Protection Code) Underwriters' Laboratories, Inc., Approved Materials List. NFPA 90A, (Air Conditioning & Ventilating Systems) Materials & apparatus of a type that have been tested NFPA 110, 2025 Edition (Standard for Emergency & and listed by UL shall be manufactured under their Standby Power Systems) reinspection service & bear the UL label. NFPA 30, (Flammable & Combustible Liquids Code) All local prevailing city & county codes. All local prevailing city & county codes. Georgia Laws & Rules "Regulating Boilers & Pressure Vessels" by Georgia Department of Labor, Safety
LIST OF CONTACTS
Owner's Representative: Architect of Record: Landscape Architect of Record: Dr. Christopher Small, A. Superintendent Gregory J. Schillinger, A.I.A. Patrick Hallahan Douglas County Schools Southern A&E, LLC Southern A&E, LLC 11490 Veterans Memorial HWY, 7951 Troon Cir, Austell, GA 30168 7951 Troon Cir, Austell, GA 30168 Douglasville, GA 30134 phone: 770-819-7777 phone: 770-819-7777 phone: 770-651-2062 email: gschillinger@southernae.com email: phallahan@southernae.com email: christopher.small@dcssga.org Structural Engineer of Record: Mechanical Engineer of Record: Electrical Engineer of Record: Daniel Chiles, P.E., S.E. Laban Busieney, P.E. Frank Campo, P.E. Southern A&E, LLC Southern A&E, LLC Southern A&E, LLC 7951 Troon Cir, Austell, GA 30168 7951 Troon Cir, Austell, GA 30168 7951 Troon Cir, Austell, GA 30168 phone: 770-819-7777 phone: 770-819-7777 phone: 770-819-7777 email: dchiles@southernae.com email: lbusieney@southernae.com email: fcampo@southernae.com

PROJECT INFORMATION PROJECT DESCRIPTION LIST OF KEYNOTES LIST OF DRAWINGS
FACILITY DESCRIPTION: CONTENT DISCLAIMER: THE DOCUMENT BELOW IS THE MASTER KEYNOTE LIST, WHICH INCLUDES ALL ITEMS SPANNING DIVISIONS 3 THROUGH 14 & SHEET NUMBER SHEET NAME
DIVISIONS 31, 32 & 33. PLEASE NOTE THAT THE INCLUSION OF AN ITEMON THIS LIST DOES NOT MEAN THAT IT IS WITHIN THE CURRENT SCOPE OF
* THIS IS EXISTING FACILITY CONSISTING OF MULTIPLE BUILDINGS.
WORK FOR THE PROJECT. THIS DOCUMENT IS INTENDED SOLELY AS A COMPREHENSIVE REFERENCE GUIDE FOR POTENTIAL KEYNOTES.
SA&E PROJECT NUMBER: 01-782-168 31 10 00 Site Clearing 07 71 29 Manufactured Roof Expansion Joints GENERAL
SCOPE OF WORK DESCRIPTION: 31 20 00 Earth Moving A Bellows-Type Roof Expansion Joint
A Subgrade B Aluminum Roof Expansion Joints G001 COVER SHEET
WORK IN THIS PROJECT INCLUDES, BUT IS NOT LIMITED TO:
B Drainage Course 07 72 00 Roof Accessories
* RENOVATION OF ALL EXISTING ROOFS 32 18 23 Athletic Surfacing & Paving (Polyurethane) A Roof Curb
BID PACKAGE: BP#1 * RENOVATION OF EXISTING HVAC SYSTEM 32 18 25 Athletic Surfacing & Paving (Latex) B Equipment Support ARCHITECTURAL
32 12 16 Asphalt Paving C Roof Hutch
32 13 13 Concrete Paving D Pre-Formed Flashing Sleeve A100 OVERALL FLOOR PLAN - DEMOLITION AND RENOVATION
CONSTRUCTION DELIVERY METHOD: COMPETITIVE SEALED PROPOSAL 32 13 13 Tennis Court Paving & Surfacing E Fall Protection Safety Rail System
32 14 00 Unit Pavers 07 81 00 Applied Fireproofing A101 FLOOR PLAN - WING A - DEMOLITION AND RENOVATION
PHASING:
32 31 13 Chain Link Fences & Gates 07 84 13 Penetration Firestopping
ISSUED FOR CONSTRUCTION: 10-06-2026 * PROJECT CONSISTS OF SINGLE BID PACKAGE. 32 32 23 Segmental Retaining Walls 07 84 46 Fire Resistive Joint System A102 REFLECTED CEILING PLAN - WING A
33 41 00 Storm Utility Drainage Piping 07 92 00 Joint Sealants
* WORK SHALL BE CONDUCTED IN SINGLE PHASE. A103 FLOOR PLAN - WING B & C - DEMOLITION AND RENOVATION
33 46 00 Subdrainage 07 95 00 Expansion Control
A Drainage Pipe & Fittings A Pedestrian Traffic Joints A104 REFLECTED CEILING PLAN - WING B & C
B Drainage Fill B Wall Joints
03 30 00 Cast-In-Place Concrete C Ceiling Joints A105 FLOOR PLAN - WING D - DEMOLITION AND RENOVATION
A Concrete 08 11 13 Hollow Metal
PROJECT TITLE LOCATION MAP A106 REFLECTED CEILING PLAN - WING D
B Steel Reinforcement 08 14 16 Flush Wood Doors
C Welded Wire Fabric 08 31 13 Access Doors & Frames A107 PARTIAL ROOF PLAN/ ROOF DETAILS - SECTION 1
D Vapor Barrier 08 32 10 .13 Solid FRP Doors & Frames
E Bond-Breaker Strips 08 32 10 Hybrid FRP Doors A108 PARTIAL ROOF PLAN/ ROOF DETAILS - SECTION 2
03 35 43 Polished Concrete Finishing 08 32 13 Sliding Aluminum-Framed Glass Doors
03 41 00 Plant Precast Structural Concrete 08 32 17 Folding Aluminum-Framed Glass Doors A600 FINISH SCHEDULE
03 45 00 Precast Architectural Concrete 08 33 13 Coiling Counter Doors
03 51 13 Cementitious Wood-Fiber Decks 08 33 23 Overhead Coiling Doors
REROOF AND HVAC RENOVATION FOR: 03 52 16 Lightweight Insulating Concrete 08 33 26 Overhead Coiling Grilles STRUCTURAL
04 20 00 Unit Masonry 08 34 73 Sound Control Door Assemblies
A Face Brick 08 36 13 Electrically Operated Sectional Doors S001 COMPONENTS & CLADDING WIND PRESSURE PLAN
B Concrete Block 08 41 13 Alum Entrances & Storefronts
C Mortar & Grout 08 42 26 All Glass Entrances
D Masonry Joint Reinforcement 08 44 13 Alum Curtain Wall
PLUMBING
E Ties & Anchors 08 45 13 Polycarbonate Panels
F Embedded Flashing 08 45 23 Fiberglass Sandwich Panel Assemblies P101 PLUMBING DEMOLITION PLAN - ROOF
G Masonry Weeps 08 51 13 Aluminum Windows
TURNER MIDDLE SCHOOL
H Cavity Drainage Material 08 51 23 Steel Windows P102 PLUMBING RENOVATION PLAN - ROOF
04 23 00 Glass Unit Masonry 08 52 00 Wood Windows
P501 PLUMBING DETAILS & SCHEDULES
04 72 00 Cast Stone Masonry 08 71 00 Door Hardware
04 73 00 Stone Veneer 08 80 00 Glazing
05 12 00 Structural Steel Framing 08 84 00 Plastic Glazing
7101 TURNER DRIVE, LITHIA SPRINGS, GA 30122 05 21 00 Steel Joist Framing 08 90 00 Louvers & Vents MECHANICAL
05 31 00 Steel Deck 09 21 16 .23 Shaft Wall Assemblies
05 40 00 Cold-Formed Metal Framing 09 22 16 Non-Structural Metal Framing M001 MECHANICAL LEGEND, ABBREVIATIONS, AND OVERALL VIEW
05 50 00 Metal Fabrications A Steel Studs & Runners
M101 MECHANICAL DEMOLITION PLAN - WING A
A Steel Ladder B Channel Bridging
B Ladder Safety Cage C Furring Channel
M102 MECHANICAL DEMOLITION PLAN - WING A ROOF
C Steel Ship's Ladder D Ceiling & Soffit Framing
D Loose Bearing & Leveling Plates 09 29 00 Gypsum Board M103 MECHANICAL DEMOLITION PLAN - WING B
E Loose Steel Lintels A Interior Gypsum Board
F Shelf Angles B Exterior Gypsum Board M104 MECHANICAL DEMOLITION PLAN - WING C
FOR: G Strut System Channel Framing C Ceiling & Soffit Framing
M105 MECHANICAL DEMOLITION PLAN - WING C ROOF
H Miscellaneous Steel Framing 09 30 13 Ceramic Tile
J Loading Dock Edge Angle 09 51 13 Acoustical Panel Ceilings M106 MECHANICAL DEMOLITION PLAN - WING D
K Metal Floor Plate & Support Frame 09 62 29 Cork Flooring
L Pipe Bollard 09 64 66 Wood Athletic Flooring M107 MECHANICAL DEMOLITION PLAN - WING D ROOF
DOUGLAS COUNTY SCHOOLS M Cast Nosing, Treads & Threshold 09 65 13 Resilient Base & Accessories
N Student Toilet Tissue Dispenser 09 65 16 Resilient Sheet Flooring M108 MECHANICAL RENOVATION PLAN - WING A
05 51 00 Metal Stairs 09 65 19 Resilient Tile Flooring
M109 MECHANICAL RENOVATION PLAN - WING A ROOF
A Stair Framing 09 65 43 Linoleum Flooring
B Metal Risers 09 65 66 Resilient Athletic Flooring M110 MECHANICAL RENOVATION PLAN - WING B
C Metal Subtreads 09 66 13 Portland Cement Terrazzo Flooring
11490 VETERANS MEMORIAL HWY, DOUGLASVILLE, GA 30134 05 52 13 Pipe & Tube Railing 09 66 14 Restoration of Portland Cement Terrazzo Flooring M111 MECHANICAL RENOVATION PLAN - WING C
05 71 13 Fabricated Metal Spiral Stairs 09 66 23 .16 Precast Portland Cement Terrazzo Stairs
M112 MECHANICAL RENOVATION PLAN - WING C ROOF
06 10 53 Miscellaneous Rough Carpentry 09 66 23 Resinous Matrix Terrazzo Flooring
A Wood Nailers & Blocking 09 67 23 Resinous Flooring
M113 MECHANICAL RENOVATION PLAN - WING D
06 15 33 Wood Patio Decking 09 68 13 Tile Carpeting
06 16 00 Sheathing 09 68 16 Sheet Carpeting M114 MECHANICAL RENOVATION PLAN - WING D ROOF
A Plywood Sheathing 09 72 00 Wall Covering
FACILITY CODE NUMBER: 648-2054 B Oriented Strand Board Sheathing 09 77 23 Fabric Wrapped Panels M501 MECHANICAL EQUIPMENT DETAILS
C Glass-Mat Gypsum Sheathing 09 84 72 Sound Absorptive Ceiling Canopies
M502 MECHANICAL EQUIPMENT DETAILS
D Cementitious Tile Backer Units 09 91 13 Exterior Painting
E Composite Nail Base Insulated Sheathing 09 91 14 Exterior Re-Painting
M601 MECHANICAL EQUIPMENT SCHEDULES
06 20 13 Exterior Finish Carpentry 09 91 23 Interior Painting
PROJECT FUNDING : FY 2026 / LOCAL
06 20 23 Interior Finish Carpentry 09 91 24 Interior Re-Painting M701 MECHANICAL CONTROL SCHEMATICS
06 41 13 Wood Veneer Faced Cabinets 10 11 00 Visual Display Units
A Cabinet Materials A Porcelain Enamel Markerboards
1 Solid Hardwood Lumber B Vinyl Fabric Faced Cork Tackboards
ELECTRICAL
2 Particleboard C Tackable Display Rails
3 Softwood Exterior Grade Plywood 10 14 16 Plaques E001 LEGEND & MECHANICAL EQUIPMENT CONNECTION SCHEDULE
4 Hardwood Plywood 10 14 19 Dimensional Letter Signage
5 High-Pressure Laminate 10 14 23 Panel Signage E101 ELECTRICAL DEMOLITION PLAN
6 Solid-Surfacing Material 10 14 26 Message Boards
FACILITY INFORMATION CODES B Hardware & Accessories 10 21 13 .16 Plastic-Laminate-Clad Toilet Compartments E102 ELECTRICAL DEMOLITION PLAN - ROOF
1 Knobs & Pulls 10 21 13 .17 Phenolic-Core Toilet Compartments
E103 WING A1 - ELECTRICAL RENOVATION PLAN
2 Drawer & Door Locks 10 21 13 .19 Plastic Toilet Compartments
3 Shelf Standards & Supports 10 21 13 .24 FRP Toilet Compartments E104 WING A2 & WING B - ELECTRICAL RENOVATION PLAN
06 41 16 Plastic Laminate Faced Cabinets 10 21 23 Cubicles
DESIGNED IN ACCORDANCE WITH THE FOLLOWING CODES: A Cabinet Materials 10 22 33 Accordion Folding Partitions E105 WING C - ELECTRICAL RENOVATION PLAN
1 Solid Hardwood Lumber 10 22 39 Folding Panel Partitions
FACILITY FULL TIME ENROLLMENT (FTE) : 2 Particleboard 10 28 00 Toilet & Bath Accessories E106 WING D - ELECTRICAL RENOVATION PLAN
3 Softwood Exterior Grade Plywood A Paper Towel Dispenser
E107 WING A1 - ROOF - ELECTRICAL RENOVATION PLAN
GENERAL: FIRE PROTECTION SYSTEM: 4 Hardwood Plywood B Soap Dispenser
5 High-Pressure Laminate C Framed Mirrors E108 WING A2 & WING B - ROOF - ELECTRICAL RENOVATION PLAN
EXISTING: 625 International Building, Code 2024 Edition Fire Protection Equipment List Published by Underwriters 6 Solid-Surfacing Material D Toilet Tissue Dispenser
with Georgia Amendments. Laboratories. B Hardware & Accessories E Grab Bars E109 WING C - ROOF - ELECTRICAL RENOVATION PLAN
International Fire Code, 2024 Edition NFPA-24 Installation of Private Fire Service Mains & 1 Knobs & Pulls F Shower Rod
E501 DETAILS
2 Drawer & Door Locks G Shower Curtain & Hooks
FACILITY NUMBER OF INSTRUCTIONAL UNITS: with Georgia Amendments. the Appurtences, 2025 Edition. 3 Shelf Standards & Supports H Towel Bar E601 RISER DIAGRAMS
International Energy Conservation Code, 2015 Edition NFPA-13 Installation of Sprinkler Systems, 2022 Edition. 06 64 00 Plastic Paneling J Soap Dish
06 82 00 Exterior Architectural Fiberglass K Handicapped Shower & Tub Seat E602 PANELBOARD SCHEDULES
with Georgia Amendments.
07 11 13 Bituminous Dampproofing L Mop & Broom Holder
National Fire Protection Association Publication PLUMBING: 07 13 26 Sheet Waterproofing M Electric Hand Dryer
EXISTING : 40
A Vertical Surface N Surface Mounted Sanitary Napkin Disposal
Number 101 (Life Safety Code), 2024 Edition. International Plumbing Code, 2024 Edition
B Horizontal Surface P Surface Mounted Diaper Changing Station
National Fire Protection Association NFPA 13. with Georgia Amendments. 07 14 16 PMMA Waterproofing & Traffic Coating 10 44 16 Fire Extinguishers & Cabinets
SQUARE FOOTAGE: 94,725 S.F. National Fire Protection Association NFPA 24. International Fuel Gas Code, 2024 Edition 07 18 00 Traffic Coatings A Portable Fire Extinguishers
07 21 00 Thermal Insulation B Fire Extinguishers Cabinet
National Fire Protection Association NFPA 70, with Georgia Amendments.
A Extruded Polystyrene Board 1 Semi -Recessed
2023 Edition L. P. Gas Code - GA 120-3-16 Rules & Reg. for LP Gases B Foil-faced Polyisocyanurate Board 2 Surface Mounted
C Unfaced Glass-Fiber Blankets 10 51 13 Lockers
WING "A1" ...........................................................13,027 S.F. National Fire Protection Association NFPA 72, 2022 Ed.
D Kraft Faced Glass-Fiber Blankets A Corridor Lockers
State of Georgia "Rules of Safety Fire HEATING, VENTILATION, & AIR CONDITIONING: E Sound Attenuation Blankets B Kitchen Lockers
WING "A2" ...........................................................22,815 S.F.
Commissionery Chapter 120-3-3". International Mechanical Code, 2024 Edition. F Mineral Wool Blankets C P.E. Lockers
G Spray Polyurethane Foam D Athletic Lockers
WING "B" .............................................................11,476 S.F. State of Georgia Department of Education Air Conditioning & Ventilating Systems- NFPA Standard H Self-Adhering Sheet Air Barrier E Locker Room Benches
"Regulations & Procedures". 90A, 2024 edition. 07 24 13 Polymer Based EIFS 10 56 13 Metal Storage Shelving
WING "C1" .............................................................8,408 S.F. 07 24 19 Water Drainage EIFS A Post & Shelf Storage Units
2010 ADA Standards For Accessibe Design (120.3-20A). HVAC Duct Construction Standards Metal & Flexible,
07 25 00 Weather Barriers B Prefabricated Coat Rack
WING "C2" .............................................................7,662 S.F. ANSI A117.1 Providing accessibility & 4th. Edition 2006, Published by SMACNA. 07 31 13 Asphalt Shingles 10 56 26 Mobile Storage Shelving
usability for physically handicapped people. Fire, Smoke & Radiation Damper Installation Guide, 07 41 13 Standing Seam Metal Roof 10 73 10 Walkway & Canopy Covers
WING "D MAIN" ...................................................16,933 S.F. A Roof Panels 10 73 13 Fabric Awnings
Local & State Codes or Regulations. 5th. Edition 2002, Published by SMACNA. B Flashing & Trim 10 73 43 Fabricated Shelters
WING "D LOWER"................................................14,404 S.F. Vapor Removal from Cooking Equipment - NFPA Standard C Ridge & Rake Cap 10 75 16 Ground-Set Flagpoles
D Gutter 10 83 16 Banners
STRUCTURAL: 96, 2024 Edition. E Downspout 11 12 00 Parking Control Equipment
American Institute of Steel Construction, AISC 15 Edition F Roof Curb 11 13 13 Loading Dock Bumpers
G Extruded Polystyrene Board Insulation 11 31 00 Residential Appliances
(ANSI/AISC 360-16) ELECTRICAL GENERAL:
H Underlayment Material 11 31 13 Commercial Appliances
American Concrete Institute, ACI 318-14 (most recent edition, unless noted): 07 42 13 13 Formed Metal Wall Panels 11 40 00 Foodservice Equipment
Steel Joist Institute, SJI 100-15 07 42 13 19 Insulated Metal Wall Panels 11 51 23 Library Stack Systems
07 42 13 23 Metal Composite Material Wall Panels 11 52 13 Projection Screens
Building Code Requirement for Concrete Masonry NFPA 70 (National Electrical Code), 2023 Edition 07 42 17 Metal Soffit Panels 11 52 23 Motorized Projector Lifts
Structures, TMS 402/602-16 NFPA 72, (National Fire Alarm Code) 2022 Edition, 07 46 46 01 Fiber-Cement Siding 11 53 13 Laboratory Fume Hoods
07 46 46 Fiber-Cement Siding Panels 11 61 43 Stage Curtains
ASCE 7-16 Minimum Design Loads for Buildings & with Georgia Amendments.
NEW ADDITION BUILDING CODE CLASSIFICATIONS: 07 52 16 SBS Modified Bituminous Membrane Roofing 11 61 23 Folding & Portable Stages
Other Structures NFPA 37, (Standard for the Installation & Use of Stationary A Modified Bituminous Membrane Sheet 11 61 43 Stage Curtains
TYPE OF OCCUPANCY (ACADEMIC BUILDINGS) : ...............EDUCATIONAL B Substrate Board 11 61 73 Theater Rigging Systems
Combustion Engines & Gas Turbines)
C Insulation Board 11 66 13 Artroom Equipment
MECHANICAL GENERAL: NFPA 780, 2023 Edition (Lightning Protection Code) D Cover Board 11 66 23 Athletic Equipment
TYPE OF OCCUPANCY (GYMNASIUM BUILDING): ...............ASSEMBLY
Underwriters' Laboratories, Inc., Approved Materials List. NFPA 90A, (Air Conditioning & Ventilating Systems) E Flashing Membrane A Basketball Equipment
F Walkway Pads B Volleyball Equipment
TYPE OF CONSTRUCTION: ....................................................IBC-IIB NFPA-II (000) Materials & apparatus of a type that have been tested NFPA 110, 2025 Edition (Standard for Emergency & 07 53 23 Adhered EPDM Roofing C Safety Pads
and listed by UL shall be manufactured under their Standby Power Systems) A EPDM Membrane Sheet D Divider Curtain
BUILDING PROTECTION: ........................................................NOT SPRINKLERED B Substrate Board 11 66 40 Athletic Scoreboards
reinspection service & bear the UL label. NFPA 30, (Flammable & Combustible Liquids Code)
C Insulation Board 12 21 13 Horizontal Louver Blinds
TOTAL OCCUPANT LOAD: ......................................................UNCHANGED All local prevailing city & county codes. All local prevailing city & county codes. D Cover Board 12 21 16 Vertical Louver Blinds
Georgia Laws & Rules "Regulating Boilers & Pressure E Flashing Membrane 12 24 13 Roller Window Shades
F Walkway Pads 12 32 00 Wood Library Casework
Vessels" by Georgia Department of Labor, Safety 07 54 19 Polyvinyl-Chloride (PVC) Roofing 12 32 13 Display Casework
A PVC Membrane Sheet 12 35 53 .16 Plastic Laminate Clad Laboratory Casework
B Substrate Board 12 35 53 .19 Wood Laboratory Casework
C Insulation Board 12 48 13 Entrance Mats & Frames
LIST OF CONTACTS D Cover Board 12 48 16 Entrance Floor Grilles
E Flashing Membrane 12 61 00 Fixed Audience Seating
F Walkway Pads 12 66 00 Telescoping Stands
07 54 21 Polyvinyl-Chloride (PVC) Recover-Retrofit 12 76 00 Grandstands
Owner's Representative: Architect of Record: Landscape Architect of Record: A PVC Membrane Sheet 13 34 12 Greenhouses
B Substrate Board 13 34 19 Metal Building Systems
Dr. Christopher Small, A. Superintendent Gregory J. Schillinger, A.I.A. Patrick Hallahan
C Insulation Board A Primary Framing
Douglas County Schools Southern A&E, LLC Southern A&E, LLC D Cover Board B End Wall Framing
E Flashing Membrane C Secondary Framing
11490 Veterans Memorial HWY, 7951 Troon Cir, Austell, GA 30168 7951 Troon Cir, Austell, GA 30168
F Walkway Pads 1 Purlins
Douglasville, GA 30134 phone: 770-819-7777 phone: 770-819-7777 07 54 23 TPO Roofing 2 Girts
phone: 770-651-2062 email: gschillinger@southernae.com email: phallahan@southernae.com A TPO Membrane Sheet 3 Eave Struts
B Substrate Board D Canopy Framing
email: christopher.small@dcssga.org
C Insulation Board E Roof Panels
D Cover Board 1 Thermal Spacer Block
Structural Engineer of Record: Mechanical Engineer of Record: Electrical Engineer of Record: E Flashing Membrane 2 Backing Plate
Daniel Chiles, P.E., S.E. Laban Busieney, P.E. Frank Campo, P.E. F Walkway Pads F Wall Panels
07 54 23 TPO Retrofit Roofing G Wall Liner Panels
Southern A&E, LLC Southern A&E, LLC Southern A&E, LLC
A TPO Membrane Sheet H Soffit Panels
7951 Troon Cir, Austell, GA 30168 7951 Troon Cir, Austell, GA 30168 7951 Troon Cir, Austell, GA 30168 B Substrate Board J Accessories
C Insulation Board 1 Flashing & Trim
phone: 770-819-7777 phone: 770-819-7777 phone: 770-819-7777
D Cover Board 2 Ridge & Rake Cap
email: dchiles@southernae.com email: lbusieney@southernae.com email: fcampo@southernae.com E Flashing Membrane 3 Gutter
F Walkway Pads 4 Downspout
07 62 00 Sheet Metal Flashing & Trim 5 Roof Curb
A Base Flashing 6 Closures
WARNING: B Roof Penetration Flashing 7 Pipe Flashing
C Cavity Wall & Rain Screen Wall Flashing 8 Cont. Eave Vent
Contractors, subcontractors, vendors & suppliers are advised that the Contract Documents consist D Equipment Support Flashing K Vinyl Faced Glass-Fiber Blanket Insulation
E Safety Pans L Extruded Polystyrene Board Insulation SHEET NAME DRAWING NUMBER
of Drawings, Specifications, Addenda, Post-Bid Addenda & Change Orders that have been printed,
F Underlayment Material M Underlayment Material
bound & numbered by the Architect. Any documents reproduced by parties other than the Architect, 07 71 00 Roof Specialties -Coated Steel 13 34 21 Metal Over Metal Retrofit Roof Systems
COVER SHEET G001
A Copings 14 21 00 Electric Traction Elevators
whether hard copy or electronic format, shall not be considered part of the Contract Documents & B Roof Edge Flashings 14 24 00 Hydraulic Elevators
(C) COPYRIGHT 2026 BY SOUTHERN A&E, LLC. ALL RIGHTS RESERVED. THIS C Gutters 14 26 00 Limited Use -Limited Application Elevators
do not supercede the provisions of the Contract Documents. Contractors, subcontractors, vendors D Downspouts 14 42 00 Wheelchair Lifts
DOCUMENT IS THE PROPERTY OF SOUTHERN A&E, LLC & SHALL NOT BE E Scuppers
& suppliers are solely responsible for verifying that information used for bidding, development of
F Conductor Heads
COPIED OR REPRODUCED IN WHOLE OR PART WITHOUT EXPRESSED shop drawings & construction of the facility are identical to the Architect's Contract Documents. G Reglets
H Counterflashing
WRITTEN CONSENT FROM SOUTHERN A&E, LLC. J Underlayment Material

STORAGE 310 187 SF BRIGHT RED LETTERS "YOUR S.P.L.O.S.T. DOLLARS A 1/2" EXTERIOR GRADE DURAPLY PLYWOOD PRIMED & PAINTED W/ DOUGLAS COUNTY BOARD OF E 2 COATS GLOSS WHITE CHOIR ENAMEL ON BOTH SIDES REROOF AND HVAC RENOVA 309 988 SF CLASSROOM CLASSROOM CLASSROOM TURNER 28 29 30 728 SF 728 SF 722 SF BAND MIDDLE SCHOOL 40 BLACK LETTERS 1215 SF CORRIDOR 407 1513 SF STO. WORK RM. 307 CLASSROOM 405 48 SF 39 CONTRACTOR SHALL BOARD OF EDUCATION: 173 SF CLASSROOM 801 SF VERIFY ALL COPY PRIOR CLASSROOM 31 STORAGE STO. TO CONSTRUCTION. ALL XXXXXX XXXXXX, CHAIRMAN 300 linear ft 27 644 SF 308 304 LETTERING TO BE NAVY CAN W. LOADING 663 SF 288 SF 104 SF BLUE UNLESS NOTED XXXXXX XXXXXX, VICE-CHAIRMAN 140a 140 OTHERWISE. XXXXXX XXXXXX 123 SF GIRL'S BOY'S 51 SF 403 404 CORRIDOR STORAGE XXXXXX XXXXXX JAN. DATA 189 SF 194 SF 300 303 XXXXXX XXXXXX 135 136 CORRIDOR 456 SF 138 SF 59 SF 71 SF 134 FREEZER/ CLASSROOM XXXXXX XXXXXX COOLER 118 SF 25 CLASSROOM XXXXXX XXXXXX, SUPERINTENDENT TLT.LOCKER OFFICE 638 SF 32 STORAGE 627 SF 131 132 133 36B 42 SF 49 SF 82 SF 186 SF CLASSROOM 37 OFFICE 1109 SF DRY ST. 36A 4" X 4" P.T. POST 128 104 SF CORR. SERVING 182 SF WORK AREA MECH. ROOM STO. STO. 301 378 SF 129 142 SCIENCE 145 SCIENCE SCIENCE 149 151 GROUND LINE 1366 SF 384 SF CLASSROOM 273 SF CLASSROOM 83 SF 138 SF STO. CLASSROOM 23 24 ART 150 33 JAN. 965 SF 726 SF 214 SF 960 SF SCIENCE 36C DISH. TLT. CLASSROOM 1373 SF 144 127 146 34 91 SF 182 SF 51 SF 968 SF CORRIDOR TOILET CORRIDOR CORRIDOR 141 143 121 213 369 SF 22 SF 2579 SF 188 SF TLT. STO. 108 WORK RM. PRINCIPL 112 107 52 SF CONFERENCE 60 SF 119 109 130 SF 5 DETAIL - JOB SIGN 171 SF MECH. CLASSROOM 210 SF CLASSROOM 211 A100 3/4" = 1'-0" 22 646 SF 35 231 SF 616 SF PRINCIPAL WORK RM. GIRL'S WORK RM. 106 110 114 118 CAFETERIA OPEN 193 SF 160 SF 185 SF 207 SF OPEN 126 COURT MEDIA COURT 4070 SF TLT. VAULT CENTER 104 105 120 GIRL'S 52 SF 95 SF BOY'S CONF. 2364 SF 210 CLASSROOM RECEPTION 113 117 169 SF SP ED MECH 02 102 236 SF 123 SF CLASSROOM CLASSROOM CLASSROOM CLASSROOM 7 WORK 643 SF OFFICE 646 SF 09 12 14 331 SF ROOM 6 103 STORAGE 600 SF BOY'S 683 SF 693 SF 608 SF 8 194 SF 209 548 SF 116 170 SF 114 SF CORRIDOR CORRIODOR CORRIDOR CORRIDOR CORRIDOR 122 201 219 19 101 381 SF 1996 SF 290 SF 1000 SF CLASSROOM 2475 SF 205 527 SF SP ED OFFICE OFFICE CLASSROOM DRESS. STAGE DRESS. 207 203 OFFICE 217 GIRLS 125 124 123 CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM 204 SF 154 SF 202 CLASSROOM 486 SF 21 ELEC. 179 SF 561 SF 162 SF 01 03 04 05 06 07 08 10 CLASSROOM 252 SF CLASSROOM 15 202 SF 158 46 SF 607 SF 596 SF 604 SF 602 SF 605 SF 608 SF 615 SF 608 SF 11 13 688 SF OFFICE 927 SF 773 SF BOYS 206 STO. 18 177 SF 157 186 SF 103 SF CLASSROOM SUPPLY 216 OVERALL FLOOR PLAN 1 204 649 SF A100 1/16" = 1'-0" 127 SF STAIR 17 216 SF CLASSROOM 9 894 SF CLASSROOM Room 215 154 645 SF 22 SF H.C. LIFT 5 21 SF JANITOR LAUNDRY 214 16 58 SF 59 SF SUMMARY OF WORK: ARCHITECTURAL DEMOLITION -GENERAL REQUIREMENTS: ARCHITECTURAL RENOVATIONS -GENERAL NOTES: SBS MODIFIED BITUMEN ROOF: * DEMOLITION SCOPE AND COORDINATION: * RENOVATION SCOPE AND COORDINATION: THE EXISTING SBS MODIFIED BITUMEN ROOF WILL REMAIN EXCEPT IN THE ARCHITECTURAL DEMOLITION PLANS ONLY SHOW THE SELECTIVE SCOPE. YOU MUST REFER TO ALL OTHER ARCHITECTURAL, STRUCTURAL, THE ARCHITECTURAL RENOVATION PLANS SHOW ONLY THE SELECTIVE SCOPE. YOU MUST REFER TO ALL OTHER ARCHITECTURAL LOCATIONS WHERE BLISTERS OR LIFTING ARE NOTED. THE CONTRACTOR SHALL PROVIDE PLUMBING, MECHANICAL, AND ELECTRICAL DRAWINGS FOR THE COMPLETE SCOPE. ADDITIONAL DETAILS ARE LOCATED IN SPECIFICATION DRAWINGS (FLOOR PLANS, ELEVATIONS, SECTIONS, AND DETAILS) AS WELL AS STRUCTURAL, PLUMBING, MECHANICAL, AND UNIT PRICES AS SPECIFIED AND WILL USE UNIT COST ALLOWANCES FOR ALL ROOFING SECTION 024119. ALL DEMOLITION WORK MUST BE COORDINATED WITH THENEW CONSTRUCTION, AND THE CONTRACTOR IS REQUIRED TO FIELD- ELECTRICAL DRAWINGS FOR THE COMPLETE SCOPE. ALL NEW CONSTRUCTIONWORK MUST BE COORDINATED WITH DEMOLITION. REPAIRS. WHERE BLISTERS OR LIFTING ARE NOTED, THE CONTRACTOR WILL REMOVE THE VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS PRIOR TO BEGINNINGWORK. CONTRACTOR IS REQUIRED TO FIELD-VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS PRIOR TO BEGINNING WORK. EXISTING CAP AND BASE SHEETS AND REPLACE WITH NEW. IN AREAS WHERE BASE AND CAP * MOVING OF EQUIPMENT AND FURNISHINGS GENERAL: SHEET ARE REMOVED, EXAMINE THE INSULATION AND REPLACE IF SATURATED. FOR ALL THE OWNER WILL REMOVE LOOSE EQUIPMENT AND SUPPLIES, SUCH AS DESKS, CHAIRS, AND ELECTRONIC DEVICES. HOWEVER, INTERACTIVE ARCHITECTURAL RENOVATIONS -NOTES AND KEYNOTES: MODIFIED ROOF AREAS THE EXISTING ROOF EDGE DRAINAGE SYSTEMS WILL REMAIN. BOARDS MUST BE REMOVED AND REINSTALLED BY A CERTIFIED INSTALLER OR AN ELECTRICAL/DATA CONTRACTOR. AT ALL WALL ATTACHED METAL FLASHING REMOVE THE EXISTING SEALANT AND REPLACE *DEMOLITIONS & REPAIRS: PLEASE BE ADVISED THAT THE SCOPE OF THE RENOVATION WORK IS DEPICTED ACROSS THE PROVIDED PLANS, WHICH INCLUDE WITH NEW. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE ENTIRE DEMOLITION PROCESS, INCLUDING ALL REQUIRED PATCHING AND REPAIRS RANDOM RENOVATION NOTES IN ADDITION TO THE GENERAL NOTES AND KEYNOTES LISTED BELOW. THE CONTRACTOR IS AT THE CONNECTOR ROOF TO WING C1, REMOVE THE MODIFIED BITUMEN ROOF SYSTEM 48 TO EXISTING FLOOR SLABS, WALLS AND OTHER STRUCTURAL ELEMENTS FOLLOWING THE REMOVAL OF ANY PLUMBING, MECHANICAL, OR RESPONSIBLE FOR REVIEWING ALL SUCH NOTATIONS TO ENSURE A COMPLETE UNDERSTANDING OF THE REQUIREMENTS.ENSURE INCHES FROM THE PARAPET WALL AND EXPOSE THE STEEL DECK. INSTALL NEW SCUPPERS ELECTRICAL EQUIPMENT THAT MAY NOT BE SHOWN ON THE ARCHITECTURAL DRAWINGS. THESE SPECIFICATIONS ARE COORDINATED ACROSS ALL TRADES INVOLVED IN THE DEMOLITION AND RENOVATION PHASES. AND OVERFLOW DRAINS IN THE EXISTING PARAPET WALL AT THE EXISTING SCUPPER *DEBRIS DISPOSAL: LOCATIONS. USE TAPERED INSULATION TO CREATE CRICKETS TO DIVERT THE WATER TO THE ALL REMOVED MATERIAL AND DEBRIS WILL BECOME THE PROPERTY OF THE CONTRACTOR AND MUST BE PROMPTLY REMOVED FROM THE SITE BUILDING STRUCTURE: SCUPPERS. INSTALL NEW CONDUCTOR HEADS AND DOWNSPOUTS AT SCUPPER LOCATIONS. UNLESS OTHERWISE NOTED. General Note: REROOF THE DEMOLISHED AREA WITH A SBS MODIFIED ROOF SYSTEM TO MATCH EXISTING * GENERAL SITE REQUIREMENTS: ALL EXISTING BUILDING STRUCTURAL COMPONENTS (STEEL COLUMNS, BEAMS, LOAD-BEARING WALLS, ETC.) ARE TO REMAIN IN ALL EXISTING STRUCTURES AND FINISHES NOT NOTED FOR WORK MUST REMAIN IN PLACE. UNLESS OTHERWISE SPECIFIED, ALL REMOVED DEBRIS PLACE UNLESS OTHERWISE NOTED. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING THE EXISTING STRUCTURE FROM STANDING SEAM METAL ROOF (Base Bid): BECOMES THE PROPERTY OF THE CONTRACTOR AND MUST BE REMOVED FROM THE SITE. DAMAGE DURING CONSTRUCTION. AT THE GYMNASIUM REPLACE THE FOLLOWING HARDWARE AND REPLACE ALL PIPE BOOTS, INSTALL NEW BUTYL TAPE IN THE VALLEYS, SEAL ALL ROOF OPENINGS AND PENETRATIONS, ARCHITECTURAL DEMOLITION -NOTES AND KEYNOTES: WALLS: AND INSTALL NEW GUTTERS WHERE WATER IS DIRECTED ONTO THE SBS MODIFIED BITUMEN PLEASE BE ADVISED THAT THE SCOPE OF DEMOLITION WORK IS DEPICTED ACROSS THE PROVIDED PLANS, WHICH INCLUDE RANDOM DEMOLITION R-1.0(General Note): ROOF. NOTES IN ADDITION TO THE GENERAL NOTES AND KEYNOTES LISTED BELOW. THE CONTRACTOR IS RESPONSIBLE FOR REVIEWING ALL SUCH C1 * PATCHING AND REPAIRS: THE CONTRACTOR IS RESPONSIBLE FOR PATCHING AND REPAIRING ALL EXISTING WALLS DISTURBED BY 1. REPLACE ALL EXISTING SCREWS. SCREWS TO BE ONE SIZE UP AND PULL TESTED FOR UPLIFT. NOTATIONS TO ENSURE A COMPLETE UNDERSTANDING OF THE REQUIREMENTS. DEMOLITION THIS INCLUDES FILLING OPENINGS FROM REMOVED DOORS, WINDOWS, AND LOUVERS, AS WELL AS ANY 2. REPLACE RIDGE CAP 4022 C2 PENETRATIONS REQUIRED FOR NEW INSTALLATIONS. THIS APPLIES TO ALLAREAS FOLLOWING THE REMOVAL OF PLUMBING, 3. INSTALL NEW CLOSURES BUILDING STRUCTURE: MECHANICAL, AND ELECTRICAL EQUIPMENT NOT EXPLICITLY SHOWN ON THEARCHITECTURAL DRAWINGS. General Note: 4021 * CONSISTENCY AND COMPLIANCE: ALL REPAIRS MUST USE MATERIALS AND THICKNESS MATCHING THE EXISTING WALLS TO ENSURE STANDING SEAM METAL ROOF (Alternate Bid): ALL EXISTING BUILDING STRUCTURAL COMPONENTS (STEEL COLUMNS, BEAMS, LOAD-BEARING WALLS, ETC.) ARE TO REMAIN IN PLACE UNLESS A COHESIVE APPEARANCE. MASONRY MUST BE TOOTHED IN WHERE APPLICABLE. FURTHERMORE, THE CONTRACTOR MUST AT THE GYMNASIUM, INSTALL A NEW TPO RETROFIT ROOF SYSTEM OVER THE EXISTING OTHERWISE NOTED. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING THE EXISTING STRUCTURE FROM DAMAGE DURING CONSTRUCTION. MAINTAIN EXISTING FIRE RATINGS AND ENSURE ALL PENETRATIONS ARE PROPERLY SEALED TO THE DECK. STANDING SEAM METAL ROOF. THIS SYSTEM WILL INCLUDE A TPO MEMBRANE, 12 INCH COVER BOARD, 1 INCH CONTINUOUS RIGID INSULATION WITH THE JOINTS STAGGERED AND TAPED, WALLS: ROOF: FLUTE FILLER INSULATION FLUSH TO THE TOP OF THE RIBS. APPLY ASPHALT PRIMER TO D-1.0 (General Note):THE CONTRACTOR SHALL IMPLEMENT ALL REQUIRED REPAIRS AND FIRESTOPPING PROCEDURES FOLLOWING ANY WALL R-4.0 (General Note): RENOVATION WORK INCLUDES PROVISION AND INSTALLATION OF NEW ROOFING SYSTEM. REFER TO ROOF EXISTING SYSTEM PRIOR TO INSTALL. INSTALL NEW METAL FLASHING. PENETRATIONS ON THIS PROJECT. SPECIFICALLY, ANY EXISTING INTERIOR AND EXTERIOR WALLS WHERE NEW HOLES OR OPENINGS ARE CORED PLANS FOR INFORMATION AND DETAILS. A1 A2 METAL TRIM, GUTTERS, AND DOWNSPOUTS. FOR NEW PENETRATIONS MUST BE PATCHED AND REPAIRED TO MATCH THE EXISTING CONSTRUCTION. FURTHERMORE, THESE NEW OPENINGS MUST BE PROPERLY FIRESTOPPED AND CAULKED AS REQUIRED TO MAINTAINTHE WALL'S FIRE RATING OR FULL-HEIGHT SPACE SEPARATION. CEILINGS: 4020 4020 B ADDITIONALLY, ALL EXISTING ABANDONED HOLES IN INTERIOR AND EXTERIOR WALLS, RESULTING FROM REMOVED CIRCUITS, CONDUITS, R-6.0 (General Note): RENOVATION WORK INCLUDES PROVISION AND INSTALLATION OF NEW CEILINGS. REFER TO FLOOR PLANS FOR DUCTWORK, PIPING, OR OTHER ELEMENTS, SHALL BE PATCHED AND REPAIRED TO MATCH THE EXISTING CONSTRUCTION AND TO MAINTAIN THE LOCATIONS AND DETAILS, AND SEE SPECIFICATION SECTION 09 51 13 ACOUSTICAL PANEL CEILINGS FOR FURTHER INFORMATION. 4021 SPECIFIED FIRE RATING OR SPACE SEPARATION. R-6.1 (General Note:) IN ALL SPACES RECEIVING NEW CEILINGS, CONTRACTOR SHALL SUPPORT FROM STRUCTURE ALL LIGHTING 4055 D FIXTURES, SMOKE DETECTORS, MOTION SENSORS, WIRELESS ACCESS POINTS, AND OTHER DEVICES FOR THE REMOVAL OF ROOF: EXISTING CEILINGS. CONTRACTOR SHALL SUPPORT ANY EXISTING LOW VOLTAGE CABLING CURRENTLY LAYING ON TOP OF THE D-4.0 (General Note):DEMOLITION WORK INCLUDES REMOVAL AND REPLACEMENT OF EXISTING ROOFING SYSTEM.REFER TO ROOF PLAN FOR 4060 CEILING GRID. ADDITIONAL DETAILS AND KEYNOTES REGARDING THIS SCOPE. A107 & A108 FLOOR FINISHES: CEILINGS & SOFFITS: R-8.0(General Note): RENOVATION WORK INCLUDES INSTALLATION OF NEW LVT FLOORING AND WALL BASE ON TOP OF FLOOR SLAB. D-6.0(Keynote. See Plan):REMOVE EXISTING CEILING (PANELS & GRID) IN THE AREA SHOWN ON PLAN AS REQUIRED FOR RENOVATION WORK. REFER TO THE FLOOR PLANS AND INTERIOR FINISH SCHEDULE FOR DETAILS ON THE NEW FLOORING. THE CONTRACTOR SHALL CLEAN AND PATCH THE EXISTING FLOOR SLAB AS REQUIRED FOR A PROFESSIONAL INSTALLATION. THE CONTRACTOR SHALL ALSO FLOOR FINISHES: PATCH AND PAINT BEHIND ALL WALL BASED REMOVED PRIOR TO INSTALLING NEW. D-8.0 (General Note):DEMOLITION WORK INCLUDES EXTENSIVE OR PARTIAL REMOVAL OF CARPET TILE AND WALL BASES. REFER TO DEMOLITION PLAN FOR ADDITIONAL DETAILS AND KEYNOTES REGARDING THIS SCOPE. THE CONTRACTOR SHALL FIELD VERIFY THE TYPE OF EXISTING FLOORING TO BE REMOVED AND COORDINATE ALL WORK WITH THE REQUIREMENTS FOR NEW FLOORING INSTALLATION, AS SHOWN ON THE KEYPLAN TRUE INTERIOR FINISH SCHEDULE. NORTH 8 0 8 16 SCALE: 1 / 8 " = 1'-0" T WORK" DUCATION TION FOR ARCHITECT: CONTRACTOR: XXXXXX XXXXXX CONSTRUCTION COMPANY XXXXXX, GA NOTE: 1. CONTRACTOR SHALL VERIFY ALL COPY PRIOR TO CONSTRUCTION. "0 2. ALL LETTERING TO BE PAINTED RED TO - MATCH PANTONE COLOR SYSTEM #201. '2 3. LETTER STYLE SHALL BE HELVETICA. 4. LOCATION OF JOB SIGN ON SITE MUST BE COORDINATED WITH AND APPROVED BY OWNER PRIOR TO INSTALLATION. OPEN BELOW SA&E PROJECT NUMBER 01-782-168 BID PACKAGE BP-1 ISSUED FOR CONSTRUCTION 10-06-2026 REVISIONS # Doc # Date 7951 Troon Circle, Austell, Ga 30168 (770) 819-7777 a r c h i t e c t s & e n g i n e e r s (C) COPYRIGHT 2026 BY SOUTHERN A&E, LLC. ALL RIGHTS RESERVED. THIS DOCUMENT IS THE PROPERTY OF SOUTHERN A&E, LLC AND SHALL NOT BE COPIED OR REPRODUCED IN WHOLE OR IN PART WITHOUT EXPRESSED WRITTEN CONSENT FROM SOUTHERN A&E, LLC. FACILITY CODE NUMBER: 648-2054 REROOF & HVAC RENOVATION FOR: TURNER MIDDLE SCHOOL 7101 TURNER DR, LITHIA SPRINGS, GA 30122 DOUGLAS COUNTY SCHOOLS 11490 VETERANS MEMORIAL HWY, DOUGLASVILLE, GA 30134 OVERALL FLOOR PLAN - DEMOLITION AND RENOVATION DRAWING NUMBER A100
"YOUR S.P.L.O.S.T. DOLLARS A DOUGLAS COUNTY BOARD OF E REROOF AND HVAC RENOVA TURNER MIDDLE SCHOOL BOARD OF EDUCATION: XXXXXX XXXXXX, CHAIRMAN XXXXXX XXXXXX, VICE-CHAIRMAN XXXXXX XXXXXX XXXXXX XXXXXX XXXXXX XXXXXX XXXXXX XXXXXX XXXXXX XXXXXX, SUPERINTENDENT T WORK" DUCATION TION FOR ARCHITECT: CONTRACTOR: XXXXXX XXXXXX CONSTRUCTION COMPANY XXXXXX, GA
CLASSROOM 28 728 SF CLASSROOM 29 728 SF CLASSROOM 30 722 SF
CORRIDOR 407 1513 SF WORK RM. 405 173 SF CLASSROOM CLASSROOM 31 27 644 SF 663 SF GIRL'S BOY'S 403 404 189 SF 194 SF CLASSROOM 25 CLASSROOM 638 SF 32 627 SF
CLASSROOM 27 663 SF
CLASSROOM 25 638 SF
BAND 40 1215 SF
WORK RM. 405 173 SF GIRL'S BOY'S 403 404 189 SF 194 SF
GIRL'S 403 189 SF
51 SF JAN. DATA 135 136 CORR 59 SF 71 SF 13 118 TLT.LOCKER OFFICE 131 132 133 42 SF 49 SF 82 SF IDOR FREEZER/ 4 COOLER SF
TLT.LO 131 1 42 SF 49 CKER OFFICE 32 133 SF 82 SF
DRY ST. 128 182 SF
DISH. 127 182 SF
DRESS 125 179 SF . STAGE DRESS. 124 123 561 SF 162 SF
MECH 142 384 S JAN. 144 91 SF . SCIENCE F CLASSROOM 23 965 SF WORK ROOM 145 273 SF TLT. 146 51 SF SCIENCE CLASSROOM 24 726 SF
STO. STO. 149 151 SCIENCE 83 SF 138 SF . CLASSROOM 33 SCIENCE F 960 SF CLASSROOM 34 968 SF
STO. 149 SCIENCE 83 SF . CLASSROOM 33 F 960 SF STO. 151 138 SF
RRIDOR 213 88 SF
CLASSROOM 35 616 SF CLASSROOM 09 600 SF OPEN COURT
CLASSROOM 06 605 SF CLASSROOM 07 608 SF CLASSROOM 08 615 SF CLASSROOM 10 608 SF OFFICE 207 204 SF CLASSROOM 11 927 SF
OFFICE 206 177 SF
CLASSROOM 22 646 SF CLASSROOM 02 643 SF TLT. 108 PRINCIPL 52 SF CONFERENCE 107 109 171 SF 210 SF PRINCIPAL WORK RM. 106 110 OPEN 193 SF 160 SF COURT TLT. VAULT 104 105 52 SF 95 SF RECEPTION 102 OFFICE 646 SF 103 194 SF CONFERENCE 109 210 SF
WORK RM. 110 160 SF
VAULT 105 95 SF
SP ED CLASSROOM 6 608 SF MECH 7 331 SF WORK ROOM 8 548 SF OPEN BELOW
CORRIDOR 219 290 SF CLASSROOM 205 527 SF LS ELEC. 1 158 SF 46 SF OYS STO. 18 157 6 SF 103 SF
CLASSROOM 15 688 SF
LS 1 SF OYS 18 6 SF
ELEC. 158 46 SF
STO. 157 103 SF
R F CLASSROOM 9 894 SF H.C. LIFT 5 21 SF
LAUNDRY 16 59 SF
CLASSROOM 01 607 SF CLASSROOM 03 596 SF CLASSROOM 04 604 SF
REVISIONS
# Doc # Date
C 1
22
A 4 1 0 A2 4020
B 4021
02 0
4020
D
060
OVERALL FLOOR PLAN -
SCALE: 1 / 8 " = 1'- 0"
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Project: CONSTRUCTION TIME AND MATERIALS Ref. #: RFP 27-261110 Type: RFP Status: Open ...

Paulding County School District

Bid Due: 12/10/2026

...CONSTRUCTION TIME AND MATERIALS Paulding County School District Nov 10, 2026 @ 09:31 ...

State Government of Georgia

Bid Due: 12/10/2026

...Construction Manager at Risk (CMAR) Preconstruction and Construction Services for Middle Oconee WRF... ...

State Government of Georgia

Bid Due: 12/17/2026

...Follow Prefabrication Training Venues and Construction Supplies Active Contract Opportunity Notice...

HOMELAND SECURITY, DEPARTMENT OF

Bid Due: 12/29/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.