DWR REDWOOD PARK & ECHO TANK REPLACEMENT
San Lorenzo Valley Water District
Contract Documents Table of Contents
00015-1
SECTION 00015
CONTRACT DOCUMENTS TABLE OF CONTENTS
VOLUME I – CONTRACT DOCUMENTS
DIVISION 0 – General Condition
Section
00010
00015
00020
00100
00500
00610
00620
00630
00655
00657
00660
00662
00664
00666
00668
00670
00680
00685
00686
00687
00692
00693
00694
00695
00700
00700A
00800
00800CA
01015
01025
01300
01530
01550
01560
01600
01700
01780
Title Page
Contract Documents Table of Contents
Notice of Inviting Bids
Instructions to Bidders
Contract Agreement
Performance Bond
Payment Bond
Escrow Agreement for Security Deposit in Lieu of Retention
Worker’s Compensation Insurance Certificate
Certificate of Contractor
Contractor Release
Contractor’s Certificate (Worker’s Compensation)
Certificate of Insurance (Worker’s Compensation)
Insurance Endorsement (Worker’s Compensation)
Certificate of Insurance (Liability Insurance)
Insurance Endorsement (Liability Insurance)
Notice of Award
Notice to Proceed
Unconditional Release and Certificate of Final Payment
Notice of Completion
Conditional Waiver and Release Upon Progress Payment
Unconditional Waiver and Release Upon Progress Payment
Conditional Waiver and Release Upon Final Payment
Unconditional Waiver and Release Upon Final Payment
General Conditions
Cal Trans Standard Specifications Section 8-1.14
Supplementary Conditions
California State Requirements
Summary of Work
Measurement and Payment
Submittals
Protection of Existing Facilities
Site Access and Storage
Temporary Environmental Controls
Products, Materials, Equipments and Substitutions
Project Closeout
Operations and Maintenance Data
DWR REDWOOD PARK & ECHO TANK REPLACEMENT
San Lorenzo Valley Water District
Contract Documents Table of Contents
00015-2
TECHNICAL SPECIFICATIONS
DIVISION 01
01 75 00
01 78 20
GENERAL REQUIREMENTS
Start-Up, Testing and Training
Operation and Maintenance Data
DIVISION 03
03 10 00
03 20 00
03 30 00
03 60 00
0363 00
CONCRETE
Concrete Forming and Accessories
Concrete Reinforcing
Cast-In-Place Concrete
Grouting
Epoxies
DIVISION 04
0420 00
MASONRY
Masonry
DIVISION 05
0550 00
METALS
Metal Fabrications
DIVISION 07
0719 00
THERMAL AND MOISTURE PROTECTION
Masonry Water Repellant Coating
DIVISION 08
0811 13
08 33 23
0891 00
OPENINGS
Steel Doors, Frames, and Hardware
Overhead Coiling Doors
Louvers
DIVISION 09
0990 00
FINISHES
Painting and Coating
DIVISION 13
13 40 00
SPECIAL CONSTRUCTION
Engineered Buildings and Structures
DIVISION 22
22 05 53
22 11 13
22 11 19
22 11 23
PLUMBING
Underground Facilities Identification
Copper and Brass Pipe, Fittings and Appurtenances
Chlorination of Water Mains
Vertical, Multistage, In-line Centrifugal Domestic Water Pumping System
DIVISION 26
ELECTRICAL (See Drawings E1.0 to E1.2)
DIVISION 31
31 23 00
EARTHWORK
Trenching, Backfilling and Compacting
DIVISION 33
33 05 05.31
UTILITIES
Hydrostatic Testing
DWR REDWOOD PARK & ECHO TANK REPLACEMENT
San Lorenzo Valley Water District
Contract Documents Table of Contents
00015-3
33 05 16
33 11 00
33 11 13.15
33 11 13.20
33 11 13.90
33 11 21
33 12 16
DIVISION 40
40 91 13
Precast Concrete Utility Structures
General Piping Requirements
Ductile Iron Pipe and Fittings
Polyvinyl Chloride (PVC) Pipe
Thrust Restraint
Force-Balanced Flexible Expansion Joint
Manual Valves
PROCESS INTEGRATION
Automatic Valves
ATTACHMENTS
1. Geotechnical Investigation for Swim Tank Alternate Site (Haro, Kasunich & Associates, August 2019).
*Note that the Redwood Park Tank will be replacing the nearby Swim Tanks. This name change had not
yet occurred at the time of the geotechnical investigation.
2. Geotechnical Investigation for Echo Tank Site (Haro, Kasunich & Associates, October 2024).
VOLUME II – CONSTRUCTION CONTRACT BID FORMS
00010A
00015A
00300
00301
00404
00405
00406
00408
00410
00415
00420
00480
Title Page
Contract Bid Forms Table of Contents
Bid Proposal
Bid Schedule of Values
List of Material and Equipment Manufacturers
List of Subcontractors
Contractor’s Licensing Statement
Contractor’s Experience Statement
Bid Security
Bid Guaranty Bond
Safety Compliance
Non-Collusion Affidavit
DWR REDWOOD PARK & ECHO TANK REPLACEMENT
San Lorenzo Valley Water District
Notice of Inviting Bids
00020-1
SECTION 00020
NOTICE OF INVITING BIDS
RECEIPT AND OPENING OF BIDS.
A. Sealed Bids will be received by Leah Mattle at SLVWD, 13060 CA-9, Boulder Creek, California,
95006, Telephone (831) 338-2153 until 3:00PM on FEBRUARY 12TH 2026 for the construction of
the Work entitled:
DWR REDWOOD PARK & ECHO TANK REPLACEMENT
DESCRIPTION OF WORK: This project includes installation of a two new 120,000 gallon
bolted steel water tanks at two existing tank sites. Redwood Park Tank Site, off Country
Club Drive in Ben Lomond, CA also includes a small retaining wall, an enclosed pump
station, and storm water drainage. Echo Tank Site, off Echo Lane in Boulder Creek, CA
also includes large retaining walls with tie-backs and storm water drainage.
SITE OF WORK: Ben Lomond, CA and Boulder Creek, CA
B. Bids will be publicly opened and read aloud at the place and time stated above. Bidders are invited
to be present.
C. The Owner shall not open any bids received after the time specified above and shall return the
unopened Bids to the Bidder.
SECURING BID DOCUMENTS. Bidders may examine the Contract Documents at 13060 CA-9, Boulder
Creek, California, 95006. The complete project specifications and bidding documents will be available on
the San Lorenzo Valley Water District website at https://www.slvwd.com/doing-business/pages/bid-
opportunities.
PRE-BID MEETING. SLWVD will host a MANDATORY pre-bid meeting at 10:00AM on FRIDAY JANUARY
16th 2026. Interested parties shall meet by 10AM at the SLVWD Conference Room located at 12788
Highway 9, Boulder Creek for discussion with SLVWD staff before being led to the tank sites. Those unable
to make this meeting may schedule a visit by contacting Garret Roffe at groffe@slvwd.com.
CONTRACT TIME. The contract time is hereby established as 300 calendar days. The contract time shall
be consecutive calendar days from the date of receipt of the Notice to Proceed.
LIQUIDATED DAMAGES. The fixed liquidated damages amount is hereby established as one thousand
dollars ($1,000) for each calendar day of unauthorized delay in completion of the Work.
BONDS. The Bidder to whom the award is made will be required to submit a payment bond and a
performance bond, each in a principal amount not less than one hundred percent (100%) of the total
Contract Price.