Invitation to bid EDPL 8-2026 Coakley

Location: Illinois
Posted: Jul 2, 2026
Due: Jul 9, 2026
Agency: City of Rock Island
Type of Government: State & Local
Category:
  • 89 - Subsistence (Food)
Publication URL: To access bid details, please log in.
Bid Title: Invitation to bid EDPL 8-2026 Coakley
Category: Housing Programs
Status: Open
Description:

Invitation to bid roof replacement located at 3909 11th Street, Rock Island.

Publication Date/Time:
7/2/2026 12:00 am
Closing Date/Time:
7/9/2026 2:00 pm
Contact Person:
Jeff Laxton
Related Documents:

Attachment Preview

Invitation to Bid-Posted Date
Roof Replacement
3909 11th Street
EDPL 8-2026
Introduction
The City of Rock Island is requesting bids from contractors for a rehabilitation project at a house located
at 3909 11th Street . This owner-occupied property will be undergoing rehabilitation using Housing and
Urban Development (HUD) funds to ameliorate deteriorating and deteriorated conditions. All work shall
be subject to HUD 35.930 and Environmental Protection Agency (EPA) regulations. Contractors who are
interested in this project will need to schedule a site visit with the homeowner, Chase Coakly, by calling
them at 309-269-2935, prior to submitting the bid. Sealed bids must be received on or before July 9th by
2p.m. They shall be addressed and marked as follows.
CED Department
Attn: Jeff Laxton
1528 3rd Avenue
Rock Island, IL 61201
ENCLOSED: 3909 11th Street Bid
Bids may be mailed or delivered in person. Late bids shall not be opened. All sealed bids shall be opened
on 7/9/2026 by 2p.m. at City Hall in the CED Department offices. Contractors who have submitted bids
may attend but are not required to do so. A bid tabulation shall be posted online afterward. All
questions shall be directed to the Construction Officer at 309-732-2906.
Scope of Work
The bidder shall submit a project plan using the design standards below that is in compliance with all
applicable HUD, EPA, and State of Illinois regulations as well as all local building and zoning codes. The
plan must include a clear project timeline and budget with line item costs. The contractor shall act as the
general contractor for the project using subcontractors as required. Subcontractors that will be required
should be clearly identified in the project plan.
Remove the chimney below the roof line. Install a mechanical vent liner, new roof collar, flashing,
and vent cap. Vent liner must be connected to the gas fired appliances. Remove existing roof on the
house down to sheathing. Existing records show there are 3 layers currently on this roof. Replace any
rotted or damaged wood. If this is old slat sheathing with gaps larger than ½” then osb or plywood
may need to be installed as a substrate in accordance with shingle manufacturer’s instructions. This
roof has had a tree drop limbs and may have rafter damage, which may need some rafter framing
addressed. There is a double gable on the front elevation which has created a valley that will need a
saddle framed to divert the water off the roof. This area will need completely covered in Ice and
Snow guard. Ice and snow guard must be installed per code and water barrier over remaining roof,
if using traditional felt paper 30 lbs. minimum requirement. Use 2” style D roof edge. Install new
flashing over plumbing boots, mast, and flues. Shingle’s will be a minimum of 35 year manufactures
warranty. Color selection will be decided by the homeowner from a color selection the contractor
shall provide at the preconstruction meeting. Install new step flashing, head flashing, & counter
flashing as needed. Flashing must be tucked behind siding leaving a water tight seal at roof lines to
wall lines. Remove center sheathing along the peak to manufacture’s specifications for a shingle over
ridge vent. Install new the entire length of the peak on the house, not to encroach into the
overhangs. The shed roof tied in to the main roof on the rear elevation should be rolled roofing do to
the shallow roof pitch. There has been multiple leaks in this area. Building permit required before
work begins.
Alternative specifications shall be considered only if they are clearly justified, cost effective, and meet
all project objectives. The contractor shall have 30 days to complete the work from the date of contract
signing. Change work orders over the course of the project are strongly discouraged.
Bidder Qualifications & Requirements
1. Bidders must be currently licensed with the Illinois Secretary of State, bonded, and insured.
2. Bidders must have or be able to obtain all applicable licenses and permits in addition to meeting
all local, state, and federal requirements to perform requested work. Contractors maybe
required additional plans upon permit submittals.
3. Bidders must have and provide proof of General Liability, Vehicle, and Workers Compensation
Insurances and name the City of Rock Island as a Certificate Holder.
4. Bidders must own or be able to rent sufficient equipment to complete the work.
5. Contractor maybe required to supply additional plans or stamped drawings for a plan
review. Which maybe need to obtain a building permit.
Preparation of Bid
Each bid must be submitted on paper and delivered in a sealed envelope. Said envelope shall be clearly
labeled with “ENCLOSED: 3909 11th Street Bid.” The bid must clearly address all requirements as
described above. The cost of the work must be separated into line items with individual costs in addition
to providing a total project cost. Labor costs and material costs must be clearly delineated. The company
name, federal tax ID number, SAMs entity number, contact person, email, phone number, and a date
with signature are all required as well.
Awarding Contracts
The lowest bid shall not automatically guarantee that a contractor will get the work they bid on. Bids
shall be reviewed for pricing, experience, previous work history, references, State Licenses, State
Registration, insurances, bonds, subcontractors, equipment owned, equipment rented, operator
experience, and financial stability. The City at its sole discretion shall decide after a review which
contractor, if any, is responsive to the invitation to bid. All bidding and award procedures undertaken by
the City in regard to this project shall be consistent with the City’s adopted procurement procedures.
Submitted bid prices shall remain valid for 60 days after bid opening.
Bidder Responsibility
Bidders shall keep the bidding process confidential. Each bidder shall be fully acquainted with conditions
relating to the site, the scope of work, any current EPA and HUD regulations pertaining to the work, and
restrictions associated with acceptable execution of requested work. Failure or omission of the bidder to
acquaint themselves with site conditions shall in no way relieve them of any obligation with respect to
their bid or subsequent contract.
Federal, State, and Local Reporting Compliance
The contractor shall provide financial and programmatic information as required by the City of Rock
Island to comply with all Federal, State, and local law reporting requirements. The contractor shall also
adhere to all applicable Federal, State and local regulations including but not limited to the following.
US Department of Housing and Urban Development (HUD): 24 CFR 35
US Environmental Protection Agency (EPA): 40 CFR 745
US Occupational Safety and Health Administration (OSHA): 29 CFR 1926
Contact Information
The primary contact person for this project is the City’s Construction Officer.
Jeff Laxton
CED Department
1528 3rd Avenue
Rock Island, IL 61201
309-732-2906
laxton.jeff@rigov.org
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Bid Number: DPW-2655 Bid Title: 2026 Roof Restoration and Replacement Project Category: Public... ...

Palatine village

Bid Due: 7/28/2026

...of the roof on City Hall. Bids will be received until 11:00 a.m., ...

City of Galesburg

Bid Due: 8/05/2026

...400 RUSSEL COURT ROOF REPLACEMENT Department: Facilities Management, Procurement Division Category...: BID RFP ...

McHenry County

Bid Due: 7/22/2026

...Advertisement for Bids: C1630 - Sherman Park Branch Library - Repairs and Renovations ...

Public Building Commission

Bid Due: 8/04/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.