JOSH STEIN
GOVERNOR
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
January 14, 2025
J.R. “JOEY” HOPKINS
SECRETARY
MEMORANDUM TO:
Trevor Carroll, P.E.
Division Engineer
ATTENTION:
Katie Hite, P.E.
Division Project Development Engineer
FROM:
Tom Santee, P.E.
Assistant State Geotechnical Engineer – Eastern Region
STATE PROJECT:
F.A. PROJECT:
COUNTY:
50524
N/A
Pender
DESCRIPTION:
US 17N from Sidbury Rd to Scotts Hill Loop Rd
SUBJECT:
Geotechnical Report - Design and Construction Recommendations
The Geotechnical Engineering Unit (GEU) has completed a review of previous subsurface
investigations that overlap with the current project. Subsurface data from WBS projects 34425.1.1
and 3.107111 indicates the soils along this project are sandy in nature and the ground water is 6 feet
or more below natural ground. The geotechnical recommendations are presented as follows.
I. Slope/Embankment Stability
A. Slope/Embankment Stability
Recommend all roadway slopes be constructed no steeper than 3:1 (H:V).
B. Undercut for Embankment Stability
Recommend 50 cubic yards of Undercut Excavation for embankment stability be included in
the contract as a contingency item to be used at the direction of the Engineer.
C. Geotextile for Soil Stabilization
Include 50 square yards of Geotextile for Soil Stabilization in the contract as a contingency
item to be used at the discretion of the Engineer.
Mailing Address:
NC DEPARTMENT OF TRANSPORTATION
GEOTECHNICAL ENGINEERING UNIT –
EASTERN REGIONAL OFFICE
1570 MAIL SERVICE CENTER
RALEIGH, NC 27699-1570
Telephone: (984) 920-8900
Customer Service: 1-877-368-4968
Website: www.ncdot.gov
Location:
3301 JONES SAUSAGE RD. SUITE 100
GARNER, NC 27529
50524
Page 2 of 4
II. Subgrade Stability
A. Undercut for Subgrade Stability
Include 50 cubic yards of Undercut Excavation in the contract as a contingency item to be
used at the discretion of the Engineer.
B. Special Ditches
Special ditches are not recommended for this project.
C. Subsurface Drainage - Subsurface Drain
Recommend 50 linear feet of 6” Perforated Subdrain Pipe for subsurface drain (Roadway
Standard Drawing 815.02) be included in the contract as a contingency item to be used at the
discretion of the Engineer.
D. Geotextile for Soil Stabilization
Recommend 50 square yards of Geotextile for Soil Stabilization be included in the contract as
a contingency item to be used in Section II A.
III. Borrow Specifications
A. Borrow Criteria
Common borrow for embankment construction to subgrade shall meet the Exceptions to
Statewide Criteria for Acceptance of Borrow Material, Article 1018-2(B).
B. Select Granular Material
Recommend 100 cubic yards of Select Granular Material be included in the contract for
backfill as a contingency item for Section I. B. and II. A.
Select granular material for embankment/backfill for geotextile for soil stabilization if
required, or backfill in water shall meet the criteria outlined in the Standard Specifications,
Article 1016-3, Class II and/or III.
C. Shrinkage Factor
A shrinkage factor of 25 percent is recommended for calculation of earthwork on this project.
D. Borrow Reconnaissance and Availability
Sandy soils with good to excellent engineering properties are available in nearby areas.
50524
Page 3 of 4
IV. Miscellaneous
A. Reduction of Unclassified Excavation - Loss Due to Clearing and Grubbing
No significant loss of unclassified excavation is anticipated due to clearing and grubbing.
B. Reduction of Unsuitable Unclassified Excavation - Unsuitable Waste
Based on the current roadway plans, unclassified excavation along this project will be
primarily derived from shallow subgrade cuts and ditch excavation. These areas contain
granular soils which are suitable for subgrade construction.
Prepared By:
Prepared By:
032171
01/14/2025
Jinyoung Park, P.E.
Regional Geotechnical Design Engineer
TGS/JYP/TCB
See Page 4 for Summary of Quantities
01/14/2025
Tyler C. Bottoms, L.G.
Project Geological Engineer
WBS Number: 50524
County: PENDER
TIP Number: N/A
Field Office / PEF: GREENVILLE
Description: US 17N FROM SIDBURY RD TO SCOTTS HILL LOOP ROAD
Project Engineer: J. PARK
Project Geologist: T.C. BOTTOMS
Pay Item
No.
0036000000-E
0036000000-E
Pay Item/
Quantity Adjustment
Undercut Excavation
Undercut Excavation
0195000000-E
Select Granular Material
0196000000-E Geotextile for Soil Stabilization
0196000000-E Geotextile for Soil Stabilization
2044000000-E 6" Perforated Subdrain Pipe
Spec Book Section No. or
Special Provision (SP) Reference
Report
Section
Alignment
Begin
Station
End
Station
Quantity
Units /
%
225 - Roadway Excavation
I. B Contingency N/A
N/A
50
CY
225 - Roadway Excavation
II. A Contingency N/A
N/A
50
CY
Total Quantity of Undercut Excavation = 100 CY
265 - Select Granular Material
III. B Contingency N/A
N/A
100
CY
Total Quantity of Select Granular Material = 100 CY
270 - Geotextile for Soil Stabilization I. C Contingency N/A
N/A
50
SY
270 - Geotextile for Soil Stabilization II. D Contingency N/A
N/A
50
SY
Total Quantity of Geotextile for Soil Stabilization = 100
SY
815 - Subsurface Drainage
II. C Contingency N/A
N/A
50
LF
Total Quantity of 6" Perforated Subdrain Pipe = 50
LF
N/A
Shrinkage Factor
These Items Only Impact Earthwork Totals
235 - Embankments
III. C
N/A
N/A
N/A
25
%
Page 4